Text
.
DC)
DEC. 21 1992 Docket No. 50-271 Mr. Warren P. Murphy Vice President, Operations Vermont Yankee Nuclear Power Corporation RD 5, Box 169 Ferry Road Brattleboro, Vermont 5301
Dear Mr. Murphy:
Subject:
Management Meeting On December 14, 1992, Messrs.- R. Pagodin and G. Morgan of your staff met with Mr. R. Keimig and other NRC staff members at the NRC Region I office in King of Prussia, Pennsylvania. The meeting was requested by your staff to discuss several matters related to the physical security program at the Vermont Yankee Nuclear Power Station. A list of attendees is enclosed with this letter.
The principal matters di: cussed during the meeting were: (1) the transition I'lan for changing.
the security force contractor from Green Mountain Security Services to the Wackenhutt Corporation; (2) the status of the assessment system upgrades; (3) the plans for modifying the intrusion detection system; (4) the acquisition and use of new tactical equipment, plans and weapons; and (5) the general status of the security program.
q y
Details of our discussions are deemed to be Safeguards Information and are exempt from public disclosure in accordance with 10 CFR 73.71.
We appreciate your staff's iriitiative in requesting the meeting and their efforts in compiling the information that was presented.- We found the meeting beneficial in providing the NRC 3
with a comprehensive overview of existing and planned security proi activities.
l 9
OB00b,u i
-OFFICIAL RECORD COPY S:VYMM I
]M" "T
~9301060256:921221 MN
.f j
.PDR.ADOCK 05000271
- F PDR 4
.j-i y
DEC. 21 1992 Vermont Yankee Nuclear Power Corporation 2
No response to this letter is required. Your cooperation with us is appreciated.
Sincerely, Original Signed By; James H. Joyner James H. Joyner, Chief Facilities Radiological Safety and Safeguards Branch Division of Radiation Safety and Safeguards cc w/cncl:
D. Reid, Plant Manager J. Thayer, Vice President, Yankee Atomic Electric Company L. Tremblay, Senior Licensing Engineer, Yankee Atomic Electric Company J. Gilroy, Director, Vermont Public Interest Research Group, Inc.
D. Tcfft, Administrator, Bureau of Radiological Health, State of New Hampshire Chief, Safety Unit, Office of the Attorney General, Commonwealth of Massachusetts R. Gad, Esquire G. Bisbee, Esquire R. Sedano, Vermont Department of Public Sm :e T. Rapone, Massachusetts Executive Office of Public Safety Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident inspector State of New Hampshire, SLO Designee State of Vermont, SLO Designee Commonwealth of Massachusetts, SLO Designee OFFICIAL RECORD COPY S:VYMM l
DEC. 21 1992 Vermont Yankee Nuclear Power Corporation 3
bec w/cncl:
Region 1 Docket Room (with concurrences and IFS Forms)
J. Linville, DRP E. Kelly, DRP H. Eichenholz, SRI - Vermont Yankee (w/ concurrences and IFS Forms)
N. Perry, SRI - Yankee Rowe V. McCree, OEDO P. Sears, NRR W. Butler, NRR OFFICIAL RECORD COPY S:VYMM
e DEC. 21 1992.
c-
' Vermont Yankee Nuclear Power Corporation 4
H e
1 h
- r
/
RI:D
'/
RI:
S
.RI:DRSS S'.
b
.K
'ig T
.)
12'[h2
-- 120/f92
- 12k//92 6-S:VYAIM OFFICIAL RECORD COPY
=
- _ _ _ _ - _ _ _ _ _ _ _ _ _ = _ - - _
b; 0-Meeting Attendees Vermont Yankee Naclear Power Corporation R. Pagodin, Technical Services Superintendent j
G. Morgan, Secutity Mar,ager-ILS. Nuclear Regulatory Commission R. Keimig, Chief, Safeguards Section, Division of Radiation Safety and Safeguards,' (DRSS)
J. Linville, Chief, Projects Br;nch 3, Division of Reactor Projects -
G. Smith, Senior Security Sper:ialist, DRSS D. Limroth, Senior Reactor L9gineer, DRSS R. Albert, Physical Security Inspector, DRSS 1
A i'
r a
w
~