ML20126J298
| ML20126J298 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 12/31/1992 |
| From: | Beach A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | William Cahill TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20126J302 | List: |
| References | |
| NUDOCS 9301060111 | |
| Download: ML20126J298 (5) | |
See also: IR 05000445/1992047
Text
-__
_ - _.
p3 Rf 00
UNIT E D st ATLS
oi
g
NUCl. EAR REGULATORY COMMISSION
S
A t oloN IV
k
,f
sit avan etArA onivt, suite 400
An tlNotDN, T[XAS 700ii 8064
<<
- " * *
DEC 31 1992
P
Docket Nos. 50-445
50-446
License No. NPT-87
Construction Permit No. CPPR-127
TU Electric
ATTN:
W. J. Cahill, Jr., Group Vice President
Nuclear Engineering and Operations
Skyway lower
+
400 North Olive Street, L.B. 81
Dallas, Texas
75201
SUBJECT:
NRC INSPECTION REPORT NOS. 50-445/92-47; 50-446/92-47 (NOTICE OF
VIOLATION)
This refers to the inspection conducted by Mr. W. B. Jones, and the inspectors
identified in the attached report, of this office on October 11 through
November 25, 1992.
The inspection included a review of activities authorized
for the Comanche Peak Steam Electric Station, Units 1 and 2, facility. At the
conclusion of the inspection, the findings were discussed with you and those
members of your staff identified in the enclosed report.
Areas examined during the inspection are identified in the report. Within
these areas the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activitles in progress.
Based on the results of this inspection, certain licensed activities appeared
to be in violation of NRC requirements, as specified in the enclosed Notice of
Violation (Notice).
The first violation reflects a lack of awareness for
controlling material used on safety-related components.
The second violation
is of particular concern because rigging activities involving heavy loads
around the reactor vessel head could have caused significant damage to the
refueling cavity wall or reactor vessel head components.
Two unresolved items were identified during this inspection.
One involved the
configuration control process in place and the corrective actions taken in
response to licensee identified events. -The second involved radiological
worker practices relating to recent contamination events that resulted in
uptakes to contract employees. -These matters are discussed in Sections 2.3
and 2.4, respectively, of the enclosed inspection report.
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response.
In your
response, you should document the specific actions taken and any additional
7
actions you plan to prevent recurrence. After reviewing your response to this
9301060111 921231
'O O
- ~
ADOCK 05000445
{I
G-
PDR-
,
,
/
U
TV Electric
-2-
DEC 31 1992
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether future NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements,
it was identified that the repair to the atmospheric relief valve remote
operator arm was in violation of your work control program.
This violation is
not being cited because the criteria in paragraph Vll.B.1 of Appendix C to
10 CFR Part 2 of the NRC's " Rules of Practice" were satisfied.
This violation
was an isolated occurrence and the licensee staff inok prompt and effective
actions to correct the problem,
in accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy
of this letter and its enclosures will be placed in the NRC Public Document
Room.
The response directed by this letter and the enclosed Notice are not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, Pub. L. No. 96.511.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
1
Sincerely,
J
A. Bill Beach, Director
Division of Reactor Projects
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix 0 - NRC Inspection Report
50-445/92-47 w/ attachment
50-446/92-4't w/ attachment
l
cc w/ enclosures:
TV Electric
l
- Roger D. Walker, Manager of
ATIN:
,
Regulatory Affairs for Nuclear
l
Engineering Organization
!
Skyway Tower
I
400 North Olive Street, L.B. 81
!
Dallas, Texas 75201
l
Juanita Ellis-
President - CASE
1426 South Polk Street
Dallas Texas 75224
,
'
-
t
!
_
. , ,
- . . _ ,
,
_
. _ . _ ,
.
-
.
.
_ _ _ _ - - ___ - --
.
10 Electric
-3-
DEC 31 1992
GDS Associates, Inc.
Suite 720
1850 Parkway Place
Marietta, Georgia 30067-8237
10 Electric
Bethesda Licensing
3 Metro Center, Suite 610
Bethesda, Maryland c)814
.
Jorden, Schulte, and Burchette
ATIN:
William A. Durchette Esq.
Counsel for Tex-La Electric
Cooperative of Texas
1025 Thomas Jefferson St., N.W.
.
Washington, D.C.
20007
Newman & Holtzinger, P.C.
A11N:
Jack R. Newman, Esq.
1615 L. Street, N.W.
Suite 1000
Washington, D.C.
20036
Texas Department of Licensing & Regulation
ATIN:
G. R. Bynog, Program Manager /
Chief Inspector
Boiler Division
P.O. Box 12157. Capitol Station
Honorable Dale McPherson
County Judge
P.O. Box 851
Glen Rose, Texas 76043
Texas Radiation Control Program Director
1100 West 49th Street
Owen L. Thero, President
Quality Technology Company
Lakeview Mobile Home Park, Lot 35
4793 E. Loop 820 South
fort Worth, Texas 76119
_ _ . - - - _
,,
.
-
!
1
TV Electric
-4-
bec to DMD (IE01)
-
bec distrib. by RIV:
J. L. Milhoan
ResidentInspector-(2)
Section Chief (DRP/B)
Lisa Shea, RM/ALF, MS: MNBB 4503
MIS System
_
DRSS-FIPS
RIV File
-
Project Engineer (DRP/B)
Section Chief (DRP/TSS)
G. F. Sanborn, CO
J._Lieberman, OE, MS: 7 - 11 - 5
1
I
t
,
,
hW
RIV: SRI:DRP/B ' RI:DRP/p
PE:DRP/B
LE:DRS/[ RI:DRSM
D:DRi-
l
WBJones:wWm
GEWern[L. TRei[%a
REMz
PAddberg- Sdbinsy
'
[/92
.
C:DRP/B
- ~
DD:DRP/
D:0}tP -
LAYandellhL
TPGwfnn
ABB2ach-
0 /kt/92' [
[/ /92
Il 3I /92
/
.
.
.
.
. .
..
..a .
.
_ _
-
.
1U Llectric
-4-
bec to DMB (IE01)
bec distrib. by RIV:
J. L. Milhoan
Resident inspector (2)
Section Chief (DRP/B)
Lisa Shea, RH/Alf, MS: hNBB 4503
HIS System
DRSS-flPS
RIV file
Project Engineer (DRP/B)
Section Chief (DRP/1SS)
G. f. Sanborn, EO
J. Lieberman, OE, MS: 7 - 11 - 5
hY
RIV: SRI:DRP/B
RI:DRP/p
PE:DRP/B
LE:DRS/d
Rl:DRSJd
0:DR1
WBJones:(pi,i
GEWern[L,
TRet[ ,,
REladz
PAddberg
[ M ins /
f-/d/92_ p_it./p/9fjftJL3*
//
/92
[/ /92
t_\\
__
-
. . - . . -
7=-
-
C:DRP/B
DD:DRP/
0:0]tP
LAYandellh
TPCMn
ABhach
j,1-34/92 [
[/ /92
Il/M/92