Forwards Insp Repts 50-445/92-47 & 50-446/92-47 & Nov. Two Unresolved Items Involving Corrective Actions in Response to Licensee Identifed Events & Radiological Worker Practices Noted
ML20126J298
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 12/31/1992
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20126J302 List:
References
NUDOCS 9301060111
Download: ML20126J298 (5)


See also: IR 05000445/1992047

Text

-__

_ - _.

p3 Rf 00

UNIT E D st ATLS

oi

g

NUCl. EAR REGULATORY COMMISSION

S

A t oloN IV

k

,f

sit avan etArA onivt, suite 400

An tlNotDN, T[XAS 700ii 8064

<<

  • " * *

DEC 31 1992

P

Docket Nos. 50-445

50-446

License No. NPT-87

Construction Permit No. CPPR-127

TU Electric

ATTN:

W. J. Cahill, Jr., Group Vice President

Nuclear Engineering and Operations

Skyway lower

+

400 North Olive Street, L.B. 81

Dallas, Texas

75201

SUBJECT:

NRC INSPECTION REPORT NOS. 50-445/92-47; 50-446/92-47 (NOTICE OF

VIOLATION)

This refers to the inspection conducted by Mr. W. B. Jones, and the inspectors

identified in the attached report, of this office on October 11 through

November 25, 1992.

The inspection included a review of activities authorized

for the Comanche Peak Steam Electric Station, Units 1 and 2, facility. At the

conclusion of the inspection, the findings were discussed with you and those

members of your staff identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within

these areas the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activitles in progress.

Based on the results of this inspection, certain licensed activities appeared

to be in violation of NRC requirements, as specified in the enclosed Notice of

Violation (Notice).

The first violation reflects a lack of awareness for

controlling material used on safety-related components.

The second violation

is of particular concern because rigging activities involving heavy loads

around the reactor vessel head could have caused significant damage to the

refueling cavity wall or reactor vessel head components.

Two unresolved items were identified during this inspection.

One involved the

configuration control process in place and the corrective actions taken in

response to licensee identified events. -The second involved radiological

worker practices relating to recent contamination events that resulted in

uptakes to contract employees. -These matters are discussed in Sections 2.3

and 2.4, respectively, of the enclosed inspection report.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response.

In your

response, you should document the specific actions taken and any additional

7

actions you plan to prevent recurrence. After reviewing your response to this

9301060111 921231

'O O

  1. ~

PDR

ADOCK 05000445

{I

G-

PDR-

,

,

/

U

TV Electric

-2-

DEC 31 1992

Notice, including your proposed corrective actions and the results of future

inspections, the NRC will determine whether future NRC enforcement action is

necessary to ensure compliance with NRC regulatory requirements,

it was identified that the repair to the atmospheric relief valve remote

operator arm was in violation of your work control program.

This violation is

not being cited because the criteria in paragraph Vll.B.1 of Appendix C to

10 CFR Part 2 of the NRC's " Rules of Practice" were satisfied.

This violation

was an isolated occurrence and the licensee staff inok prompt and effective

actions to correct the problem,

in accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy

of this letter and its enclosures will be placed in the NRC Public Document

Room.

The response directed by this letter and the enclosed Notice are not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, Pub. L. No. 96.511.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

1

Sincerely,

J

A. Bill Beach, Director

Division of Reactor Projects

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix 0 - NRC Inspection Report

50-445/92-47 w/ attachment

50-446/92-4't w/ attachment

l

cc w/ enclosures:

TV Electric

l

- Roger D. Walker, Manager of

ATIN:

,

Regulatory Affairs for Nuclear

l

Engineering Organization

!

Skyway Tower

I

400 North Olive Street, L.B. 81

!

Dallas, Texas 75201

l

Juanita Ellis-

President - CASE

1426 South Polk Street

Dallas Texas 75224

,

'

-

t

!

_

. , ,

- . . _ ,

,

_

. _ . _ ,

.

-

.

.

_ _ _ _ - - ___ - --

.

10 Electric

-3-

DEC 31 1992

GDS Associates, Inc.

Suite 720

1850 Parkway Place

Marietta, Georgia 30067-8237

10 Electric

Bethesda Licensing

3 Metro Center, Suite 610

Bethesda, Maryland c)814

.

Jorden, Schulte, and Burchette

ATIN:

William A. Durchette Esq.

Counsel for Tex-La Electric

Cooperative of Texas

1025 Thomas Jefferson St., N.W.

.

Washington, D.C.

20007

Newman & Holtzinger, P.C.

A11N:

Jack R. Newman, Esq.

1615 L. Street, N.W.

Suite 1000

Washington, D.C.

20036

Texas Department of Licensing & Regulation

ATIN:

G. R. Bynog, Program Manager /

Chief Inspector

Boiler Division

P.O. Box 12157. Capitol Station

Austin, Texas 78711

Honorable Dale McPherson

County Judge

P.O. Box 851

Glen Rose, Texas 76043

Texas Radiation Control Program Director

1100 West 49th Street

Austin, Texas 78756

Owen L. Thero, President

Quality Technology Company

Lakeview Mobile Home Park, Lot 35

4793 E. Loop 820 South

fort Worth, Texas 76119

_ _ . - - - _

,,

.

-

!

1

TV Electric

-4-

bec to DMD (IE01)

-

bec distrib. by RIV:

J. L. Milhoan

ResidentInspector-(2)

DRP

Section Chief (DRP/B)

Lisa Shea, RM/ALF, MS: MNBB 4503

MIS System

_

DRSS-FIPS

RIV File

-

Project Engineer (DRP/B)

Section Chief (DRP/TSS)

DRS

G. F. Sanborn, CO

J._Lieberman, OE, MS: 7 - 11 - 5

1

I

t

,

,

hW

RIV: SRI:DRP/B ' RI:DRP/p

PE:DRP/B

LE:DRS/[ RI:DRSM

D:DRi-

l

WBJones:wWm

GEWern[L. TRei[%a

REMz

PAddberg- Sdbinsy

'

[/92

.

C:DRP/B

~

DD:DRP/

D:0}tP -

LAYandellhL

TPGwfnn

ABB2ach-

0 /kt/92' [

[/ /92

Il 3I /92

/

.

.

.

.

. .

..

..a .

.

_ _

-

.

1U Llectric

-4-

bec to DMB (IE01)

bec distrib. by RIV:

J. L. Milhoan

Resident inspector (2)

DRP

Section Chief (DRP/B)

Lisa Shea, RH/Alf, MS: hNBB 4503

HIS System

DRSS-flPS

RIV file

Project Engineer (DRP/B)

Section Chief (DRP/1SS)

DRS

G. f. Sanborn, EO

J. Lieberman, OE, MS: 7 - 11 - 5

hY

RIV: SRI:DRP/B

RI:DRP/p

PE:DRP/B

LE:DRS/d

Rl:DRSJd

0:DR1

WBJones:(pi,i

GEWern[L,

TRet[ ,,

REladz

PAddberg

[ M ins /

f-/d/92_ p_it./p/9fjftJL3*

//

/92

[/ /92

t_\\

__

-

. . - . . -

7=-

-

C:DRP/B

DD:DRP/

0:0]tP

LAYandellh

TPCMn

ABhach

j,1-34/92 [

[/ /92

Il/M/92