ML20126J274
| ML20126J274 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 12/31/1992 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Hall D HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20126J278 | List: |
| References | |
| NUDOCS 9301060105 | |
| Download: ML20126J274 (5) | |
See also: IR 05000498/1992030
Text
- _ _ _ - - _ _ _ _ _ _ _ _ _ - _ _ _ _ _
. _ _ _ _ _ _ _ _ - - - _ _ _ _ - _ _
. _ _ _ _ _ .
_ _ _ _
_ _ _ _
c; # N o,
UNlito STATEB
/s
. k
NUCLEAR HEGULATORY COMMISSION
'
Rt oloN IV
.
3
011 RYAN PLAZA DRIVE, $Ulit 1000
%4,,,,,
AHUNoTON,11XAS 76011
DEC 3 l 1992
Dockets:
50-498
50-499
Licenses:
NPT-76
NPf-80
llouston Lighting & Power Company
ATIN: Donald P. llall, Group
,
Vice President, Nuclear
P.O. Box 1700
liouston, Texas
77251
Gentlemen:
SUBJECT: NRC INSPECTION REPORT 50-498/92-30; 50-499/92-30
This refers to the inspection conducted by Mr. M. Runyan and the inspectors
identified in the enclosed report October 13-16 and November 16-20, 1992, on
site, and the December 4,1992, conference call with Mr. Pacy and other
members of your staff.
The inspection included a review of activities
authorized for your South Texas Project Units 1 and 2, facility.
At the
conclusion of the inspection, the findings were discussed those members of
your staff identified in the enclosed report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examination of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Your July 9, 1992, response to our MOV Inspection 50-498;499/92-06, and the
subsequent actions you have taken and information~you have provided were
reviewed during this inspection.
From our review we have concluded that no
further response is requested.
Within the scope of this inspection, no violations or deviations were
identified,
in ac" 'ance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy
of thi.
'tter and its enclosure will be placed in the NRC Public Document
Room.
9301060105 921231
0^
ADOCK 05000490
vU
G
,I
'
u
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
i
i
11ouston Lighting & Power Company
-2-
,
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
,
Sincerely,
'$l)1\\b--
Jc
famue
Co1 Tins, Director
.
Division of Reactor Safety
Enclosure:
Appendix - NRC Inspection Report
50-498/92-30 w/ attachments
50-499/92-30 w/ attachments
cc w/ enclosure:
Houston Lighting & Power Company
ATTN:
William J. Jump, Manager
Nuclear Licensing
P.O. Box 289
Wadsworth Texas
77483
City of Austin
Electric Utility Department
ATTN:
J. C. Lanier/M. B. Lee
P.O. Box 1088
City Public Service Board
ATTN:
R. J. Costello/M. T. Hardt
P.O.-Box 1771
San Antonio, Texas 78296
Newman & lloltzinger, P. C.
ATTN:
Jack R. Newman, Esq.
1615 L Street, NW
Washington,-D.C.
20036
Central Power and Light Com)any
ATTN:
D. E. Ward /T. M. Puc(ett
P.O. Box 2121
Corpus Christi, Texas 78403
INP0
Records Center
1100_ Circle 75 Parkway .
Atlanta, Georgia: 30339-3064
,
-
,
.,,.,.,.__..J',
__.
-,,..,,._m
_- - . -
,-r
-
___ _ _ _ - _ _ _ _ _ .
Houston Lighting & Power Company
-3-
1
Mr. Joseph M. Hendrie
30 Bellport Lane
Bellport, New York 11713
Bureau of Radiation Control
State of Texas
i
1101 West 49th Street
,
Judge, Matagorda County
Matagorda County Courthouse
1700 Seventh Street
Bay City, Texas 77414
Licensing Representative
Houston Lighting & Power Company
Suite 610
Three Metro Center
Bethesda, Maryland 2081'
Houston Lighting & Power Company
ATTN:
Rufus S. Scott, Associate
General Counsel
P.O. Box 61867
Houston, Texas 77208
.
_,
._;_.
.,
_
,
~
._,
. _ - - _ - _ _ ,.:_.
Houston _ Lighting & Power Company
-4-
bec to DHB (IE01)
bec distrib. by RIV:
J. L. Hilhoan
Resident inspector
Section Chief (DRP/D)
Lisa Shea, RH/ALF. MS: HNBB 4503
HIS System
DRSS-FIPS
RSTS Operator
Project Engineer (DRP/0)
RIV file
R. Bachmann, OGC, HS: 15-B-18
Section Chief (DRP/TSS)
C. Paulk
T. G. Scarbrough (EMEB/NRR)
H. Runyan
T. Westerman
- 1V:RI:ES
- 1V:RI:ES
- C:ES
dkhdS h/
D:DRPek
0/6hb
- HRunyan/lb
- CPaulk
TWesterman
bCtrKinbedain ABBeakh[fJCc111p/
12/10/92
12/10/92
12/23/92
6/M92
Of492
CN92
- PRLVIOUSLY CONCURRLD
- CONCURRED VIA TELEPHONE
__
_
. _ _
__.
_
_
__
,__
. - - - .
.
-
- -.
-
Houston Lighting & Power Company
-4-
bec to DMB (IE01)
bcc distrib. by RIV:
J. L. Milhoan
Resident Inspector
Section Chief (DRP/D)
Lisa Shea, RH/Alf, MS: HNBB 4503
HIS System
DRSS-FIPS
RSTS Operator
Project Engineer (DRP/D)
RIV Flie
URS
R. Bachreann, OGC, MS: IS-B-18
Section Chief (DRP/TSS)
C. Paulk
T. G. Scarbrough (EMEB/NRR)
H. Runyan
T. Westerman
- 1V:RI:ES
- IV:RI:ES
- C:ES
[hdS h/
D:DRP k
.D/bRb
f
- HRunyan/lb
- CPaulk
TWesterman
Dbt1Tmbdain
ABBeach[fJCc111g
12/10/92
12/10/92
12/23/92
6D//92
01%h92
C N 92
- PREVIOUSLY CONCURRED
- CONCVRRED VIA TELEPHONE