ML20126H946

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Mar 1985
ML20126H946
Person / Time
Site: Surry  Dominion icon.png
Issue date: 03/31/1985
From: Jones V, Saunders R, Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Beebe M
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
85-263, NUDOCS 8506100468
Download: ML20126H946 (36)


Text

'

POW 34-04 s

VIRGINIA ELECTRIC-AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT NO. 85-03 APPROVED BY:

a

~

STATION MANAGER 85061 k

O p

e

') 0 0

4 1

i Section Pm Operating Data Report - Unit #1 1

Operating Data Report - Unit #2 2

Unit Shutdowns and power Reductions - Unit #1 3

Unit Shutdowns and Power Reductions - Unit #2 4

Load Reductions Due to Environmental Restrictions - Unit #1 5

Load Reductions Due to Environmental Restrictions - Unit #2 6

Average DaDy Unit Power Level-Unit #1 7

Average Daily Unit Power Level-Unit #2 7

Summary of Operating Experience 8,9 Amendments to Facility License or Technical Specifications 10 Facility Changes Requiring NRC Approval 11 Facility Changes ht Did Not Require NRC Approval 12,13 Tests and Experiments Requiring NRC Approval 14 Tests and Experiments 'Ihat Did Not Require NRC Approval 14 Other Changes, Tests and Experiments 15 Chemistry Report 16 l

Description of AH Instances Where Thermal Discharge Limits Were Exceeded 17 Fuel Handling 18,19 l

Procedure Revisions ht Changed the Operating Mode

' Described in the FSAR 20 Description of Periodic Tests Which Were Not Completed Within the Time Limits Specified in Technical Specifications 21

=

11 n

Section Page l

Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #1-Mechanical Maintenance 22 Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit # 2 - Mechanical Maintenance 24 Maintenance of Safety Related Systems During Outage or l

Reduced Power Periods - Unit #1 - Electrical Maintenance 25 Maintenance of Safety Related Systems During Outage or t

Reduced Power Periods - Unit # 2 - Electrical Maintenance 27 l

l Maintenance of Safety Related Systems During Outage or l

Reduced Power Periods - Unit #1-lii.L utiient Maintenance 28 Maintenance of Safety Related Systems During Outage or t

Reduced Power Periods - Unit #2 -Instrument Maintenance 30 l

I l

l l

I 1

.._ -. ~,.. -- -,,..

WEPCD OPER AT ING DAT A REPORT

!r DOCRET No.

50-280 1

DATEl MARCH le 1985 COMPLET ED Bf v. JONE S.

i TELEPHONE-804-357-3184 e

UPERATING STATUS t,.

1. UNIT NAME SURRY UNI T I

'2. REPDRilNG PERIOD MARCH 1985

3. LICENSED THERMAL power -Mwi-2441

)

4 NAME PL ATE R A TING -GRUSS MwE-847.5 i

5. DE slGN ELECTRICAL RA TING -NE T NwE-768 1

6

6. MAXIMUM DEPE NDAstk CAP ACli f -GROS 5 MwE-811 7.

MAXIMUM DEPENUAhtE C AP At tiv -NET MwE-775

]

8.

IF CHANGES DCCUN IN CAPACITV RAflNGS i

(

-l TE MS 3 T HR OUGH 7-SINCE L AST j

REPORT. GivE REASONS j

e 9.

power LEVEL 10 wHICH RESIRICTED. IF ANY j

i

-NE T MwC-

]

10. REASONS FDR NESTRICTIDMS, IF ANY t

(

IHIS MONTH VR-TO-OATE COMMULAfivE i

i (

11. HOURS IN REPORilNG PER IDO T44.0 2160.0 107592.0
12. NUMBER OF HUuR$ REACTOR WAS CRITICAL 744.0 2l03 8

'66480.5

13. RE AC TOR RESERVE SHUTD0dN HOURS 0.0 0.0 3774.5

(

l 14 HUURS GENERATOR DN-LINE T44.0 2079 3 65088.4

(

15. UNIT RESERVE SHUIDodM HooR5 0.0 0.0 3736 2
16. GROSS THERMAL ENERGV GENER ATED -MhH-1815356.5 4738027 9 150953205:0
(

li. GROSS ELECTRIC AL ENERGV GENERATED -MwH-611575.0 1588750 0 48440713.0 1

18. NE T ELECTRIC AL E NERGV GE NER A TED -MwH-5H2724.0 1510470.0 45922314.0 I

i

19. UNIT SERvlCE FACTUR 100.04 96.3%

60.5%

ns 4

(

20. UNIT AVAILABILITY F ACT OR 100.04 96 3%
64. 01 e

i

21. UNIT CAPACliv FACfDR -05tNG MDC NET-101 14 90.2%

' 55. I's j'

22. UNIT CAPACIIf FACf0R -USING DER NET-99.4%

88.74 54. 84 t

23. UN I T F DR CE O UU T A GE R A I E 0.04 3.74 20.0%

g i

24. SHUIUDwNS SCHE DULED OwER NEXT 6 MUNIHS rg O

-IVPE, UAiE ANO UURATIUN OF EACM*

SnutstierfMelntesence 06-l 4-85 10 Days ca I(

l c'

l

25. IF SHUT DowN AT END OF REPORT PERIOU.

ESTIMATE I IME OF STARIUP l'

26. Unit $ IN IEST STATUS 60NELAST ACHIEVED J

-PRIUR TD COMMERCI AL UPER Ail 0N-t INITIAL CRITICAllTV INiilAL ELECTRICIft COMME RL I AL OPER AllON g

1

.[

N'

b;

~,

  • e VEPCO UPFRATING OATA REPowf DUCKET NO.

50-281

.UAIE MARCH 1.

1985 (UMPLEIED Bf-V. JONES T E L E PHONE 804-351-5184 UPER4flNG STAIUS

1. UNii NAME SURRY UNIT 2
2. REPORBING PERIOD MARCH 1995
3. LICENSED T HERM AL P0w[R -Mwi-2441 4.

NAMF PL AIE R A T ING -GROSS MwE-847.5

5. DE5tGN ELECIRICAL RailNG -NE T MdE-F88 g
e. MaxlMUM DEPENDABLE CAPAllif -GRUSS MwE-R11 F. MAXIMUM DEPENDABLE CAPALITY -NET MwE-775 8.

IF LHANGES UCCUR [N CAPAlliy RAllhG5 y

-I T E MS 3 T HROUGH F-SINCE LAST REPURI. GIVE REASONS 9.

PUwER LEVEL 80 wHICH RESTRICTED, IF ANY

-NET MwE-

10. RE ASONS FOR RESIRICil0NS. IF ANY a

THIS MONTH iR-fD-DATE CUMMULATIVE g

II. HOURS IN REPORTING PERIOD 744.0 2160.0 104472.0

12. NUMBER Ur HOURS REALTOR WAS CRITICAL 469.5 1885.5 67891. 7
13. REAliUR RESERVE SHuiOUwN HOURS
3.0 00 328.1
14. HOURS GENERATOR ON-LINE 469 5 1885.5 66793.1
15. UNII RESERVE SHUTUUdN HOUR 5 0.0 0.0 0.0

(

16. GROSS THERMAL ENERGY GENERATEU -NbH-1842107.5 4465212.5 1564636i7.8
17. GROSS ELELIR EC AL ENERbV GENERATED -MwH-362810.0 1426555 0 507170295 0 Is. NET ELECTRICAL ENERby GE NE R A T E D - MwH-344627.0 1353F23 0 48070165. 0:
19. UNil SERVICE FACIOR 63 1%

87.3%

63.9%

M3

20. UNII AVAIL ABILITY FACIOR 63 14 87.3%

63.9%

21. uni f L AP AC lif FACTOR -U5ING MDC NET-59.88 80 9%

59 4%

e

22. UNii CAPatlif FACIUR -USING DER NET-58.8%

F9 5%

58 4%

os

23. UNil FukCEO OUTAGE RATE 00%

0.04 0.04 o

24. 5HUIOUwNS 5LHEDULED UWER NEXT 6 MONTHS

-IfPE. DATE ANO UURATION OF EACH-

25. IF 5 HUT 00wN AT END OF REPORT ' PERIOD, E5flH4fE TIME O& STARIUP 06r-15-85
26. UNITS IN TEST STATUS IURELAST ALHIEVEU

-PRIOR TO COMMENCIAL UPERATION-INITIAL CRITICAllTV ENiilAL ELECIRIClif COMMERCIAL OPERATION

,s w

.o UNITsituTDOWNS AND POWER REDUC 110NS floCKETNO.

50-280 IINIT NAME Surry I

  • IDA1E 04-04-85 ETED py V H._In-REFORT MONill March 85 TER.ErtlONE (8041357-31 R4 t
    • L

.! ~I'

}. $

Evens -

gi Acehm to llcensee

$4 Cause & Cmeective k'.

Date E

go N

j15 Reposi #

  • a O Pieveni Reevreence i

1 NO 4E DURING TIII iREPO RTING PER LOD j

i i

./

n i

I i

?

1 w

i d

oo i

2 3

4 F: FenceJ Ressem:

Methent:

Exhibis G-Instsucihins i

3: Scheduled A-Equipment Fallwee(Explain) 1-Manual fin Psepsesikm of Dses B. Maintenance of Test 7-ManualSessm.

Entry Sheets fm l.icensee C.R, reeling 3-Autoenstic scemm.

Evens Repmi (LER) File INUREG.

I D Regelstosy Restelcohm 44Mher (Emplain) 0161)

E Opensene Tisining & IJeense Esseninsike 4

5 l

F.Adadalseestive Esidbit I Same Simice l

G-Operschmet Eseue (Emplain) 08/77)

H-Other (Emplain)

?

i e

e l>0CKET NO.

50-281 UNIT SilU1 DOWNS AND PGWER REDUC 110NS j

UNIT NAME Surry H

  • DATE 04-04-85 COMPLETEl) BY V. H. Iones REPORtMONitt March 85 TELErt10NE (804) 357-3184 "t.

I.lcenset h4, Q

h~I

}

ac Event ag 1

Acik, s.

Cause & Coggecil,e

~

n'.

Date

{

s i

jdig Repint #

wYO U

he,ent Recweence F

et o

85-1 03-20-85 S

274.5 H

I Unit was shutdown for refueling outage and due to MOV-RII-2700 having excessive.

'I packing leakage.

l i

4 1

./

l i

5 a

E I

2 3

4 F: Fo ced Reason:

Mechail:

Exhiltit G. Insieuctions 5: Scheduled A E.gulpment Fellwe(Emplain) l-Mannel foe riepsistion of Data B-Maintenance of Test 2-Menest Scism.

Entry Sheess for i.leensee C-Refueling

.1-Autonistic Scrans.

Event Repose (LER) File (NUREG.

D Regisletiny Resieletion 44)eher(Earlein) 0161)

E4)perseur Training & Ucense Emandnetion 5

F AJndnissentive Exhibit 1 Same Source G-Operselonel Eraos (Esplein)

I'l/77)

Il-Other (Empialie) e

Page 5 of 30 LOAD REDUCTIONS DUE TO ENVIRONMENTAL RESTRICTIONS UNIT NO. 1 MONTH: Ma,ch long i

DATE, TILE HOURS; LOAD, W.

REDUCTIONS, W K4 REASON NONE DU11ING THIS REPORTING PERIOD.

e

  • .6 O

t MONTHLY TOTAL

Pcgm 6 of 30 LOAD REDUCTIONS DUE TO ENVIRONMENTAI. F2STRICTIONS UNIT NO. 2 MONTH: March,1985 4

DATE, TIME HOURS-LOAD, M.

REDUCTIONS, MR MWH REASON NONE DUIJNG THIS REPORTING PERIOD e

  • m 0

9 et MONTHLY TOTAL l-

~

~

37..g~1.;;-wr -

~;,

., ~,,. -;.

u

.. ~

.+,

,y; n

.r

'- 1..

' '- ', es ' VEPCO ave Ea u P A lt'v. uni l PUwt R LEVtl

SUNRY POWER TIAilON f-(Nj

H E P'JR i lNb MONTH -?

M ARCel.1965 OtAuti tm). 50-280 UUCn E T. No.' ' 50-2 H l.

" f-

. DATE. HAk(le 1.

19H5

. CUMPL ET ED Hy W.-JUNE 5 g

UN I T UN E ON I I I-W O-A v t R A t.t UAILY power I.E VEL

(

uar 4.E-NET-AVER AGE D AI Lv PowEH ' L EVEL -

-MwE-NET-t 775.8 744.9 t

2 783 3 742.4 3

789.5 742.7 4

788 5 743.1 a

5 78N.0 739.9 6

78T.1 741.4 7

765.8 T34.5 t'

8 785 4

- 734 Al 9

767 2 7 34. 6 l

I0 id6.5 T34.3 F85 9 T34.9 12 784 4 132.T 13 782.9 735.0

(

14 184.8 732 6 15 784.4 7 36.6 16 105.0 T36.0 l

(

17 784.5 736.4 18 762.1 737.5 19 idh.)

737.0 t

20 782 3 348.9 21

.772.1 0.0 22 779 0 0.0 23 778.2

.0.0 24 764.0 0.0

[f -

25 761.7 0.0 26 776.5 0.0 ua.

27 7F8 0 0.0 28 760.8 0.0

'4 29 781.4 0.0 0

30 7o5.9 0.0 31 786.6 0.0 4

g

7.-

i -

Pcgo 8 of 30

SUMMARY

OF OPERATING EXPERIENCE

~

MONTH / YEAR March,1985 Listed below in chronological sequence by unit is a summary of operating

.; experiences for this month which required load reductions or resulted in signi-ficant non-load ~related incidents.

UNIT ONE 03-01-85 0000 This reporting period begins with the unit at 100% power (820 MW's).

.03-31-85 2400 There were no required load reductions or significant non-load related incidents during the reporting period. The reporting period ends with the unit at 100% power (820 MW's).

t i

r 5

e 1

5

Paga 9 of 30

SUMMARY

OF OPERATING EXPERIENCE

~

MONTH / YEAR March,1985

n Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

UNIT TWO 03-01-85 0000 This reporting period begins with the unit at 100% power (780 MW's).

03-20-85 0910 Commenced plant shutdown for refueling outage and also becae.:e of MOV-RH-2700 packing gland leakage.

1332 Unit off the line.

1345 Rx shutdown.

2021 Commenced plant cooldown.

03-21-85 0401 RCS < 3500F/450 psig, on RHR.

1911 RCS < 200oFr 03-30-85 1200 RCS loops drained.

03-31-85 2400 This reporting period ends with the plant at RSD on RHR, RCS loops are drained, Rx vessel head disassembly in progress.

t e

4

Page 10 of 30 i

AMENDMENTS TO FACILITY IJCENSE OR TECHNICAL SPECIFICATIONS March,1985

. ~...

NONE DURING THIS REPORTING PERIOD.

I i

e h

Pega 11 of 30 PACILITY CHANGES REQUIRING NRC APPROVAL March,1985 NONE DURING THIS REPORTING PERIOD.

+

l

[

9 e.-

__-----_~n-. _ - _ -. - _ _ _ - _,

e-

,,y_m

__m

Pcgn 12 of 30 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL DC 80-49A Technical Support Center -Facilities removal 1&2 This design change provided space for the new TSC by removing electrical,

-building services and structuralinstallations in the old Machine Shop in the Service Building.

Summary of Safety Analysis The modification does not affect normal station operation or the operation of any safety-related equipment.

?

DC 81-41 Charging Pump Service Water Supply Pump Relocation Modification 1 & 2 This design change makes the charging pump service water pumps capable of providing the processes necessary to permit the operation of equipment (charging pumps) used for safe shutdown functions in the event of a fire. Two of the four pumps were relocated into a new pump room to provide separtation.

Summary of Safety Analysis The modification enhances the reliability, redundarcy and physical separation of the system. It has no adverse effect on safety-related equipment and pro-vides fire protection separation between charging pump service water pump trains for each unit.

DC 83-14A Spent Fuel Handling System Modifications Paving of the Omsk Loading / 1&2 thloading Area.

This design change replaced the existing loading / unloading area with a new reinforced concrete work area. The entire loading / unloading area was made larger and provided with a floor drainage system that can accommodate limited contaminated water drainage.

Summary of Safety Analysis Paving of the cask loading / unloading area is considered non-nuclear safety related Category III. The modification does not adversely affect any safety related equipment or structure.

Prge 13 of 30 FACILITY CHANGE THAT DID NOT REQUIRE NRC APPROVAL March,1985 DC 83-14B Spent Fuel Handling System Modifications Enclosure of the Cask Loading / Unloading Area 1&2 This design change enclosed the existing cask handling crane structure and the cask loading / unloading area with steel siding. In addition, the entire loading / unload-ing area was made larger to accommodate the cask shipping vehicle.

Summary of Safety Analysis The modification enclosed the cask handling crane structure and the loading /

unloading area. The enclosure serves to provide protection from the outside weather elements allowing for safe and efficient cask handling operations.

DC-83-21 Fuel Building Block Wall Modification - Relocation of Electrical Equipment 1&2 This design change relocated electried equipment installed on the Fuel Building block walls. The equipment was relocated to allow for the installation of the new girt system and the new blow-off siding.

Summary of Safety Analysis Relocation of equipment and conduits have no effect on the safe operation of the station, or the operation of any equipment required for the safe shutdown of the plant. The modification did not relocate equipment or raceway required for the safe shutdown of the units.

DC 83-47 Computer Data Link and Tire Alarm Data Link for LEOF and Misc. Communications Upgrade 1&2 This design change involved the installation and termination of a computer data link and fire alarm cables. Additionally, the Station Fire Detection / Annunciation System was modified and communication cables were installed.

Summary of Safety Analysis The modification enhances communications and does not constitute an "unreviewed

(

safety question" as defined in 10CFR50.59.

t u.

Page 14 of 30 TESTS AND EXPERIMENTS REQUIRING NRC APPROVAL March,1985 NONE DURING THIS REPORTING PERIOD.

TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL March,1985 NONE DURING THIS REPORTING PERIOD.

}

'l 1

6

--.----,---.n.,

w,---

_.-.,.,r.

Paqa 15 of 30 OTHER CHANGES, TESTS AND EXPERIMENTS March,1985 NONE DURING THIS REPORTING PERIOD.

i

{

i I

I 4

L

Poli 28-06 Page 16 of 30 VIMINIA POLER SURRY POER STATIG!

O E!ISTRY REPORT MAIG 19 85 O!!T No.1 UIIIT NO. 2 ANALYSIS MAXI!dE MINDIE AVER 12

?AXD1E MIND 1E AVERA2 Gross Radioact., uCi/ml 1.4EE+0 4.89E-1 9.17E-1 2.73E-1 9.16E-3 8.40E-2 Suspended Solids, pgsn 0.2 0.2 0.2 0.0 0.0 0.0 Gross Trititzn, uCi/ml 2.76E-1 2.29E-1 2.49E-1 6.72E-2 5.24E-2 6.10E-2 131 Iodine

, uCi/ml E.04E-2 5.13E-2 6.36E-2 6.46E-4 1.21E-4 2.7FE-4 131 131 I

77 0.F0 0.2E 0.50 0.31 0.08 0.17 HyJu Aw, cc/kg 39.4 31.1 36.8 32.2 f.9 df.0 (3)77 Lithitzn, pgan (1) 1.55 1.31 1.43 1.

0.23 0.45 Boron-10, przn*

151 138 145 396 0.196 137 (2)

Oxygen, (D.O. ), egrn s 0.005 5 0.005 50.005 2.00 s0.005 0.7 Chloride, pgar, s 0.01 s 0.01 s 0.01 s 0.01 50.01 s0.01 pH 9 25'C 6.75 6.09 6.36 8.07 5.29 6.44

  • Boron-10 = Total Boron x 0.196 RDERKS: (1) CATIGi EED PIACED IN SERVICE FOR LITEIQ' EDEVAL Qi Ut2T GE O!

3 2. 3-9. 3-13. 3-23.

(2) UNIT INO SEVIDOLE Q13-20-05 FOR REWELIEG OUTAGE (3) ADDED 2770 GRth5 CP LITHILE 20 Ut2T 2ho O! 3-20-ES, 600 GRtJS Q: 3-21-85 (4) CDGASSING uiIT quo IoR RENELING OU:EE.

e

Pcge 17 of 30 DESCRIPTION OF ALL INSTANCES WHERE THERMAL DISCHARGE LIMITS WERE EXCEEDED March,1985 NONE DURING THIS REPORTING PERIOD.

4

Page ]8 of 30 FUEE MANDLyng UNIT #

I MONTH / YEAR March,1985 DATE NO. OF ANSI NO.

NEW OR SPENT FUEL SHIPPED / RECEIVED ASSEMBLIES PER SHIPMENT INITIAL ENRICHMENT SHIPPING CASK ACTIVITY LEVEL NONE DURING THIS REP )RTING PERIOD.

l l

I l

I i

i

Page 19 of 30 MiEL HANDLING UNIT,

2 i

MONTH / YEAR March,1985 DATE NO. OF ANSI NO.

NEW OR SPENT FUEL HIPPED / RECEIVED ASSEMBLIES PER SNIPMENT INITIAL ENRICHMENT SHIPPING CASK ACTIVITY LEVEL l NONE DURING THIS REPORTING PERIOD.

9 6

e e

-w.

Page 20 of 30 PROCEDURE REVISIONS THAT CHANGED THE OPERATING MODE DESCRIBED IN THE FSAR March,1985 NONE DURING THIS REPORTING PERIOD.

t e

0

Cortreted Copy Prga 19 of 31 DESCRIPTION OF PERIODIC TESTS WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTH / YEAR February,1985 PRO. NO.

TITLE UNIT 2.42 Functional Testing of Control Room Habitability, 1

Redundant Chlorine Monitor (CLA-VS-100A) 37.1 Electrical Hydrogen Recombiners 1

37.1 Electrical Hydrogen Recombiners 2

4

Page 21 of 30 DESCRIPTION OF PERIODIC TESTS WIUCH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS March,1985 NONE DURING THIS REPORTING PERIOD.

Page 22 of 30 MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO.1 MECHANICAL MAINTENANCE MARCH,1985 NONE DURING THIS REPORTING PERIOD.

O S

A

Page 23 of 30 MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO. 2 MECHANICAL MAINTENANCE m.

r' i

Prgs 24 of 30 WPCD SAFETY RELATED DLRING REDUCED POER SORTED BY UNIT AND DEFMTENT FROM 03/20/85 TIEU 03/31/85 LMIT 02 SLERY TGTURED TO WO DEPT Siif<VICE MARK NUMBER NUNIER WO TITLE HISTORY SLHMARY 0228 03/21/95 02-CH -F

-1A 016938 INSTALL VENT RIG ON 2-CH-C-1A IlGTALLED VENT RIG 0228 03/25/95 02-SW -FT -205B 013997 FC A 10 MONTH CALIBRATIDH FERFOR?ED 10 MONTH CALIBRATION, ALJUSTED TRANSMITTER TO WITHIN SFECS.

l 0228 03/26/95 02-EPL-EP -NA 017193 hidCHIld'FTTINGSASPER DRILLED OUT SHOLLDERS AS PER D. Chappell INSTRUCTIONS 0229 03/29/95 02-RC -YI -200C 017422 INVESTIGATE CAUSE FOR FLOW NO F*0BLEM FOUND SIGNAL FROM INDICATION.

ACCELEROPETER MY SE LOW ENOUOH WITH LNIT DOW TO SET FF LOW ALARM ALTHOUGH IT WAS NOT IN WEN CECKED NO ALARM IN CONTROL RG)M EITER e

I

Page 25 of 30 r

MAINTENANCE OF SAFETY RELATED SYErPEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO.1 ELECTRICAL MAINTENANCE MARCH,1985 NONE DURING THIS REPORTING PERIOD.

E t

l l

l I

1 4

L

Page 26 of 30 MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO. 2 ELECTRICAL MAINTENANCE 4

r Pcga 27 of 30 KPto.

9AFETY RELATD DURING RDUED POWER SORTD BY UNIT AND DEPARTENT FROM 03/20/95 T)stu 03/31/85 LMIT 02 SURRY RETlJde TO W3 IEPT SERVIE MARK MMER NUMBER WO TITLE HISTORY

SUMMARY

0229 03/21/85 02-EPD-BC -2A1 017096 LATTERf CHM:GER BCCAME VERY CHECKED LO4 I.ALANCE FOR 2Al-2A2.

ERRATIC CK SAT.

4229 03/21/85 02-EPD-filSC-NA 010432 EMERGENCY LIGHTS Replaced REPLACED CAR ON PNL 252 CNT 3, 1/9/

85. INSTALL CHARGER PACK FOR EERG.

LIGHTING. INSTALLED 2 LIGHTS ON BATTERY PACK & TESTD SAT.

4229 03/21/95 02-RH -MOV -2700 017465 ELECT 8tICALLY BACKSEAT MOV-2700 ELECTRICALLY BACKSEATED MOV AS PER

'IO REDUCE PACKIN LEAK FROCDURE CH 3-21-85

-0229 03/22/95 02-RC -MOV -NA 012718 ASSIST OPS IN GETTING VALVES TOOK VALVES 2595, 94, 93, 92, 91 &

M N MSEAT Offset 0229 03/25/05 02-BS -CRN -1 017510 PM - ON DEMMD CLEAED & INSPECTD ALL ELECT. CON-NECTS REMOVED ALL TRASH & CECKED OPERAfl0N OF CRAE AND LIMIT SWITCH 0229 03/25/05 EE -EDG -2 017121 LOW PRESSLEE. STARTING AIR CALIBRAID PRESSURE SWITCH AP1 AND ALARM COMES IN -

AP2 FOR TE RIGHT AND LEFT INSTRU-ENT BANKS. ALARM NOW COES IN AT 165 PSI, OPS SAT.

0229 03/25/95 02-SW -NOV -203A 014247 ASSIST MOVATS IN TROUI(ESH00T-ASSISTED MOVATS IN TROUBLESHOOTING IUG VALV :

VALVE 2-SW-NOV-203A 3/5/85 0229 03/24/05 02-96 -HCU -N/A 017637 PERS02EL HATCH INER DOOR HOOKED UPEW HOTOR AND INSTALLED NOT WORKING PROPERLY NEW LOCK PIN CYLINDER 0229 03/26/95 02-CH -CB' -NA 016998 REPAIR IMAGED ELECTRICAL CON-REPAIRED LB TO MOTOR DUIT 0229 03/27/95 02-RP -A M -EH10 016104 DID NOT COE IN IWING PT B.5 CEKCED OPERATION OF CARD, FOLND NO PR0fLEM WITW IARD.IN ALARM STATUS.

RELAY WOLLD NOT OPERATE, REPLA2D-RELAY y

4 e

s

Page 28 of 30 MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO.1 INSTRUMENT MAINTENANCE M ARCH,1985 NONE DURING THIS REPORTING PERIOD.

Page 29 of 30 6

MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO. 2 DISTRUMENT MAINTENANCE e

4

Paqa 30 of 30 XPCO

  • SAFITY RELATED DLRIE REDLEED POER SORTED BY LMIT AND DEPARTE>rr FR(M 03/20/95 TlftU 03/31/85 f

UNIT 02 SLRRY RETlJo e TO WO DEPT SERVICE MARK NUMER NUNbER WO TITLE HISTOPY SUPPh*'Y 0237 03/21/95 02-CH -RTD -106A 017001 CHG FP UNIT 2 ' A' INBOARD IAG RAN SEN7)~i CA., REA!'S GO0f GTK 354 TEnP 115.1. INMJT V0.T51.87MV WATDC P01P.'T ON DIGITA' DISFLAY FOR 10 MINUTES. NO CHANGE. 3 HOLRS LATER RAN SENSOR CAL, NO PROP F0WD 0237 03/22/95 02-SW -FI -201C 014249 NO INCREENT MMKS ON GAGE INSTALLED NEW OLASS TURE AND INDICATOR INSIDE TUBE. INSTALLED EW SCALE.TDFORARY INSTALLED OUTSIE COVER WITH TOP 10 PROTECT INTERNALS OF I EICATOR 0237 03/25/05 02-9W -FT -205A 013999 PERFORM 18 MONTH CALIBRATION PERFORED 19 MONTH CALIIRATION AIWSTED TRANBMITTER TO WITHIN SPECS 0237 03/29/95 02-CN -P

-1C 010467 COPMfTER POINT T4004A C DWtG-REMOVED AND REINSTALLED T/C AND' ING PUMP CECNED WIRIE MADE SLRE WIRES ERE TIGHT 0237 03/29/85 02-MS -PI -2464 011M5 PERFORM REFELINO CALIBRATION PERF(RED PT 2.7A FOLMD HIGH E!K LEVELS ON PT 2464 OUTPUT. REPLACED APPLIFIER 90ARD AND CALIBRATED TRANSMITTER SUPMATOR.PM 2-4648 WAS ADJUSTED CLOSER TO DESIRED VALES 0237 03/29/95 02-MS -PI -24M 0116M PERFORM REFLELING CALIBRATION FTRFORED PT2 74 AD.RSTED TRMidITTER OUTPUT TO BRING IT CLO90t TO TE DESIRED VALLES REPL#:ED 19(LATOR PM 2-4M PT fDff TO ENGIMERING 0237 03/29/95 02-MS -PI -2468 011M7 PERFORM REFUELING CALIBRATION PDFORPED PT 2.7', ADJUSTED TRANSMIT TER QUTPUT TO SFlit:5. REPLACED ISOLATOR PM 2-448 PT SENT TO ENGIE ERING 0237 03/29/95 02-RC -TI -2412 011702 PERFORM REFM LING CALIBRATION FtRFORE D REFUELING CALIBRATION AD.AJSTED TAVE NI ALARM COPPARATER ALL OTER MODLLES IN SPECS 0237 03/29/05 02-RC -TI -2412 011703 PERFORM REFUELING CALIBRATION FtRFORED REFELING CALIBRATION NO ADASTENTS REQUIRED PT SENT TO ENGIM IRING 8

6 DuwI. Sn~rm Mskurqunatioruikfurtment a

V Ykeltrsukm!

itad offxelk2xX666 MaksvQevidms OrwJwrnshteeritms Rkinsoral Dr}$nkt23261 April 12, 1985 Mr. Maurice R. Beebe Serial No.85-263 Office of Resource Management N0/JDH:acm U. S. Nuclear Regulatory Commission Docket Nos. 50-280 Washington, D. C. 20555 50-281 License Nos. DPR-32 Dear Mr. Beebe DPR-37 VIRGINIA POWER i

SURRY POWER STATION UNIT NOS. 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for Surry Power Station Unit Nos. 1 i

and 2 for the month of March, 1985.

Very truly yours, 1

A

/

W.'L. Stewart Enclosure (3 copies)

Mr. J. Taylor, Director (12 copies) cc Office of Inspection and Enforcement Dr. J. Nelson Grace (1 copy)

Regional Administrator Region II Mr. D. J. Burke NRC Resident Inspector Surry Power Station ij

April 12, 1985 Mr.;Maurice R. Beebe Serial No.85-263

.0ffice of. Resource Management N0/JDH:aca U. S. Nuclear Regulatory Commission Docket Nos. 50-280 Washington, D. C. 20555 50-281 License Nos. DPR-32

Dear Mr. Beebe:

DPR-37 VIRGINIA POWER SURRY POWER STATION UNIT NOS.'1 AND 2 MONTHLY OPERATING REPORT

. Enclosed is the Monthly Operating Report for Surry Power Station Unit Nos. I and 2 for the month of March, 1985.

Very tryly yours.

I

[

\\

LJ, (.

\\bd* 'N W. L. Stewart Enclosure (3 copies) cc Mr. J. Taylor, Director (12 copies)

Office of Inspection and Enforcement Dr. J. Nelson Grace (I copy)

Regional Administrator Region II Mr. D. J. Burke NRC Resident Inspector Surry Power Station


.v-

-