Describes Progress in Completion of Mods to torus-attached Piping.Original Scope Mods Completed.Equipment Nozzle Evaluations & as-built Reconciliation of Mods in Progress. Addl Mods Needed.Final Rept Anticipated by Dec 1985
ML20126H772
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/13/1985
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Stolz J
Office of Nuclear Reactor Regulation
References
NUDOCS 8506180444
Download: ML20126H772 (1)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 JU ti 131985 1215) 841-4 5 o 2 JOHN S. KEMPER V IC E-PR ESID E NT ENGINEE RING AND RESE ARCet Mr. J. F. Stolz, Chief Docket Nos. 50-277 Operating Reactors Branch No. 4 50-278 Division of Licensing U. S. Nuclear Regulatory Conmission Washington, DC 20555

Subject:

Peach Bottom Atomic Power Station, Units 2 S 3 Mark I Program - Torus Attached Piping

References:

(1) Letter d. S. Kemper (PECo) to d. F. Stolz (NRC), dated December 12, 1983 (2) Meeting held at the PECo Offices between PECo, Bechtel, Franklin Research Center and NRC (H. Shaw), September 23, 1983 File:

GOVT 1-1 (NRC)

Dear Mr. Stolz:

As described in the Reference (1) transmittal, we have been continuing our efforts on the torus attached piping modifications which completes the Mark I activities for Peach Bottom. All original scope modifications for Units 2 and 3 as described in the Reference (2) meeting have been ccmpleted. The remaining activities for both units are the ccmpletion of the equipment nozzle evaluations and the as-built reconcillation of the modifications. The evaluations and reconciliation' to date have indicated the need for semo additional modifications which are in progress.

Our Plant Unique Analysis Report will be updated to reflect the modifications required on the piping systems attached to the torus.

The final report was tentatively scheduled for June, 1984; however, we now expect this final report to be ready for submittal by December 1985 pending completton of any modifications resultIng from the nozzle evaluations and the as-built reconciliation.

Sincerely, 8506180444 850613 PDR ADOCK 05000277 l