ML20126H742

From kanterella
Jump to navigation Jump to search
Staff Requirements Memo Re Briefing on Role of AEOD in Oversight of Operating Reactors (SECY-92-407).Staff Should Evaluate & Respond to Commission on Listed Items of Interest Raised by Commissioners at Briefing
ML20126H742
Person / Time
Issue date: 12/31/1992
From: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
To: Taylor J
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
References
REF-10CFR9.7 M921217, NUDOCS 9301050303
Download: ML20126H742 (2)


Text

7

[ga usg Do UNITED STATES p' \\

NUCLE AR REGULATORY COMMISSION i

3,,7 g

g W ASHIN GT ON, 0.C. 2055$

t

/

IN RESPONSE, PLEASE REFER TO:

M921217 orrect OF THE December 31, 1992 SECRE T AR Y MEMORANDUM FOR:

James M. Taylor Executive Director for O "C}tions

. l 'f)

FROM:

Samuel J. Chilk, Secretag

)

SUBJECT:

STAFFREQUIREMENTS-BRIrg\\NG ON ROLE OF AEOD IN OVERSIGHT OF OPERATING REACTORS (SECY-92-407), 10:00 A.M.,

THURSDAY, DECEMBER' 17, 1992, COMMISSIONERS' CONFERENCE ROOM, ONE WHITE FLINT NORTH, ROCKVILLE, MARYLAND (OPEN TO PUBLIC ATTENDANCE)

The Commission 1 was briefed by the NRC staff on the role of AEOD in the oversight of operating reactors.

The staff should evaluate and respond to the-Commission on the following items of interest which were raised by the Commissioners at the briefing.

1.

The staff should determine whether there is a method available which could calculate the difference in operator performance with and without the annunciators available (specifically without annunciators and not knowing they are inoperable), and if so, describe the differences.

2.

The role of AEOD in medical and materials area should be evaluated and the potential for some kind of performance indicator in these areas should be considered by the staff.

3.

The staff should address how resources applied to specific plants correlate with the perceived performance of the plants.

(EDO)

(SECY Suspense:

3/27/93)

Commissioner Curtiss was on official travel and did not l

attend this briefing.

9301050303 921:31 lO 1 CFR pg.7 PDR

\\

r

,9

- cc:- The Chairman Commissioner Rogers Commissioner Curtiss Commissioner Romick Commissioner de Planquo OGC OIG.

Office Directors, Regions, ACRS, ACNW-(via E-Mail)

OP, SDDU/CR, ASLBP (via FAX)

PDR - Advance-DCS - P1-24 k

=

3 a

I

[.-

l-f-l-t y-

.+s,.

,,_,,.m,

.+

,m_

~._

.