ML20126H500

From kanterella
Jump to navigation Jump to search
Responds to NRC 810306 Request That Util Include NRC Criterion on Diverse Instrumentation to BWR Scram Discharge Sys long-term Mod.Required Work on Units 2 & 3 Will Be Completed During Next Refueling Outages
ML20126H500
Person / Time
Site: Peach Bottom  
Issue date: 04/08/1981
From: Gallagher J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Reid R
Office of Nuclear Reactor Regulation
References
NUDOCS 8104140438
Download: ML20126H500 (2)


Text

_

i 4

PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET

/ ('.'

(M

~

P.O. BOX 8699 V

1881 1981 PHILADELPHI A. PA.19101

\\

(2151 841-50o3

~?

3

,,esEPH W. G ALLAQMK R

c, 6,

fs

..s.

\\., \\

%\\

12 soset.ic Pacouction ose.atuant

\\ cs.N *y s

/

April 0,

1nol

//)

w,. cy P'r. Robart V.

Peid, Chief n nrating Pesctors Franch 4 'l o

Division of Licensing U.S.

"uclarr R=g ul ator y Commissinn

't'a s h i n g t o n, DC 09595 Dear f'r.

Pali:

arch 6, 10'1, forwarded a cuestion Yo ur letter dcted v regardinc our response to the subject o f P'< R Serrm Discherge Fystam Lonr Term "odification.

Your question is restatad halow s

in part, with our rasponse.

'Je racuest that you modify your com'citments to co'noly uith the follo wi ng :

1)

Tha design must incluia our criterion on Divorse In s tr tm a nt a tio n (S9fety Criterion 3 in Ganaric SE R on Ts'9 C C MJ' DISCHAROF. YS T F'4, Dacamber 1,

1906).

Pasconse i

In a letter fr om "r. Carra 11 Eisanhut datad varch in, 1001, I

(Generic letter 91-19) the subject of diversa in s t r um an t ation was l

clarified.

Our intention is to provi1e the required diversity vie the route of diversity of manuf acturer as suggestad by tha referenced reneric letter.

This would requira renl acing one 591 f of the involved devices with the same type of devica produced by another mrnufacturer.

The anticipated sc h ed ul e for implementation is to comolete the requirei work on Unit '> during the naxt rnfuelinr, outage

( teg inning J anur.r y, 1002).

Unit ' is presantiv in a refualing outage, however, there is not sufficient time to obtain the g

required meterial and complete thn inste11ation et this tima.

O t

8104140 %

[

N

'?.

Reid, Chief Page 2 l'r. Robert Th er e for e, the wo r k o n Un i t ? uill be performed duri.g tha naxt outage of suf ficient duration which begins after raccipt of the raquired meterial.

Th e Unit 0 refueling outage is schedul ad fo r beginning of 10C3, which represents the latest date for tha com pletion o f the wo r k.

Rho ul d you have any questions or require further i n form ation,

please feel free to contact us.

Ver y truly your s,

Y0 u