L3 ALTI M O R E GAS AND ELECTRIC CHARLES CENTER P. O. BOX 1475 BALTIMORE. MARYLAND 21203 April 6, 19d1 Asatsun E. LUNDVALL..JR
{U Vict PRE 51DEM g
Suppty I
's Ilr.
D.
G.
Fisenhut, Director s-Division of Licensing I
O s 79 b [2 gR of f iec of Nuclear Heactor Hegulatiun g
- '#'%,yEM% CC U.
S. ';uclear Hegulatory Cummission
~
%1 Washington, D.
C.
20555 b
J subject:
Calvert ClitT Nuclear Power Jiant p
l Units Nos. 1 & 2, Dockets Nos. a0-317 C 50,
e Fire Protection Modif ications near Mr. Eisenhut:
In our 1c t te r da ted January 30, 19di, ne :'or ecas ted that we would complete the installation of the italon Suppttssion c,ys ten, in the hwitchgear Ituurr s ( F C!t No. 8v-1027) by April 6,
1951.
n-w * ' nd aat we cannot mee t this comnitment due to difficulty of instaiting icisate.mpports resultind f ro:.. interferences caused by the con 3ection 0; c.,
w i t.n i n the pro tec ted s
now Q ver_cu
'u tae U n i t. No. I snuuber areas.
Further, available manpower it, inspec tion uutage which is demanding a cunniJe r as a _ a n i ',aen t to overtime it..a ted Co;r.ple tion o f work.
We estimate that a two week extensi,r if _: t Installation Date" is necessary.
At this Line, we antieigate taking the pre-viourly estinated test dates of day ld, IJol ana J u. ie 1,
l)31 l'o r Un i ts lios. 1 and 2 respectively.
Hased on the above, we reques t iu. e.< b.
.n o.
'ne installation cum-mitment dates for Units Nos. 1 and 2 until Agri6 _' o, 1 Jai f ul FCH No. d0-1027,
!!alon SupprcJsion Systems in the Swi t a n;e.tr u u, a.
'1
,1' li r.;,
l s
i
/
cc:
J.
A.
Biddison, Esquire G.
F. Trowbridge, Esquire tir.
E.
L. Conner, Jr. - NHC tir.
H.
E. Architzel, Pesident Inspector, C.dvert Clif f:.
i l
8.10:4 0,9 o y(,3
.