Forwards Insp Rept 50-271/92-19 on 920901-04.No Violations Noted
ML20126H228
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 12/24/1992
From: Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20126H232 List:
References
NUDOCS 9301050107
Download: ML20126H228 (4)


See also: IR 05000271/1992019

Text

-!

e ~ s

.

DEC. 2 41992

Docket 50-271

Mr. Warren P. Murphy ,

Senior Vice President, Operations -

Vermont Yankee Nuclear Power Corporation

RD 5, Box 169

Ferry Road

Brattleboro, Vermont 05301-0169 =

Dear Mr. Murphy:

Subject: NRC REGION I EMERGENCY PREPAREDNESS INSPECTION No. 50-271/92-19

Enclosed is the NRC report of the inspection of the September 2,1992 Vermont Yankee Nuclear

Power Station (VYNPS) emergency preparedness (EP) exercise and of the EP program. _The

inspection consisted of inspector observations, interviews with personnel, and examination of

documents. The inspection began with observation of the emergency exercise and associated

activities, and included inspection of your EP program. The inspection was conducted from

September 1-4, 1992. Follow-up on EP program considerations, including telephone discussions

with members of your staff and review of additional materials provided by your staff, continued

_

at the NRC Region I office through October 30,1992. Discussions of our fmdings were held by

the lead inspector, Mr. C. Amato, with you and your staff at the conclusion of the on-site

inspection, and by telephone discussion on December 1,1992. In addition, inspection fmdings-

were discussed by telephone with Messrs. R. Sojka and E. Porter of your staff by Mr. E. McCabe

on December 15, 1992.

During the exercise, we noted that representatives of Vermont and other States within the ten-mile

emergency planning zone were given frequent and detailed briefmgs at the Emergency Operations

1

Facility. While this inspection did not include off-site EP activities we also noted that-Vermont,

New Hampshire and Massachusetts simulated extensive protective measures.

9301050107 921224'

PDR ADOCK-05000271

0 PDR

OFFICIAL RECORD COPY S:VYEMEX.EOM

q r-m

m

gw

y'fa

f

i a tJ >

\

Q

g

.

LLC. 2 41992

.

Vermont Yankee Nuclear 2

Power Corporation

The ins [rctors concluded that your staff successfully demonstrated the ability to implement the

emergency plan so as to protect public health and safety. Overall, exercise performance was

assessed as acceptable. There were strengths in Simulator Control Room selection of the reactor -

shutdown process and in Emergency Operations Facility performance, but a weakness in Operations

Support Center (OSC) performance was noted. That weakness (Report Detail 4.3) involved over-

simulation of repair activities and failure of equipment repair personnel to follow relevant

procedures. We noted that you and your staff also identified this weakness during your post-

exercise critique. However, because we consider this OSC performance aspect significant, we

request that, within 60 days of receipt of this letter, you provide us your assessment of that

performance and of any actions you plan to take to address it.

s We apologize for the delay in transmitting this report to you. Thank you for your cooperation.

Sincerely,

Original Sign:C Dy;

James H. Joyner

James H. Joyner, Chief

Facilities Radiological Safety

and Safeguards Branch

Division of Radiation Safety

and Safeguards

Enclosure: NRC Region ! Re[x)rt No. 50-271/92-19

l

l

t

l

l

i

OFFICIAL RECORD COPY S:VYEMEX.EOM

l

,

_ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ __-_- -__-_-____ - __ _ -

..

.

.

p

,,

DEC. 2 41992

. .

Vermont Yankee Nuclear- 3

Power Corporation

- cc w/ encl:

D. Reid, Plant Manager.

J.-Thayer, Vice President, Yankee Atomic Electric Company

L. Tremblay, Senior Licensing Engineer, Yankee Atomic Electri: Company

J. Gilroy, Director, Vermont Public Interest Research Group, Inc.

D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire

Chief, Safety Unit, Office of the Attorney General, Commonwealth of Massachusetts

- R. _ Gad, Esquire

G. Bisbee, Esquire _

R. Sedano, Vermont ' Department of Public Service -

T. Rapone, Massachusetts Executive Office of Public Safety

Public Document Roem (PDR)

Imcal Public Document Room (LPDR)

Nuclear Safety Information Center _ (NSIC) l

K._ Abraham, PAO (2)

NRC Resident inspector

Stata of New Hampshire, SLO Designee

State of Vermont, SLO Designee

' Commonwealth of Massachusetts, SLO Designee

4

d -

i

OFFICIAL RECORD COPY - S:VYEMEX.EOM

.

- i - - - ~-,. - _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _

,, .

_ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ - _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ - _ _ _

.

. M  : , n ;_

Vermont Yankee Nuclear 4

Power Corporation

bec wiencl:

Region i Docket Room (with concurrences and IFS Forms)

DRS/EB SALP Coordinator

J. Linville, DRP

E. Kelly, DRP

II. Eichenholz, SRI - Vermont Yankee (w/ concurrences and IFS Forms)

N. Perry, SRI - Yankee Rowe

V. McCree, OEDO

P. Sears, NRR

) W. Butler, NRR

6

R 'D $ Rl:DRSS RI:DRSS

An. / tmh McCabeg

-

9 12/18/92 12Ai'/92

Jt/ /9

,

OFFICIAL RECORD COPY S:VYEMEX.EOM

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_j