ML20126H159
| ML20126H159 | |
| Person / Time | |
|---|---|
| Site: | Catawba, Wolf Creek, Cook |
| Issue date: | 05/30/1992 |
| From: | Omealia M AFFILIATION NOT ASSIGNED |
| To: | NRC |
| References | |
| FOIA-92-267 NUDOCS 9301050085 | |
| Download: ML20126H159 (4) | |
Text
.
.s I.
' 'g MICHAEL O'HEALIA.
300 Third Street N.E.
Washington, D.C.
20002 May_30, 1992 FREED 014 OF INFORMATION Director Division of Rules and Records ACT REQUEST U.S. Nuclear Regulatory Commission 7J _.ygg ry Washington D.C.
20555 6?x>d 6-t/4u Dear Sira Pursuant to the Freedom of Information Act, I would like t_o re-.-
ceive the information listed below.
Please ~ 1et : me know the costs-associated with this request.
1.
The draft risk-based insp guide.for auxiliary feedvater system at the D.C. Cook Nuclear Power. Plant, dated January 21,1992.
The inspection guidapce for the Outage Team.inspqqQ gs at.,,i,.
2.
the Catawba Nuclear Station, Unit 1, dated September 16,199 3.
The BNL Technical Report TR-A-3075-T2C Rev_l Risk-Based' Inspection Guides for-Wolf Creek Generation Station',
dated Feburary 2,1991.
Please let me-know if you require any additional information; I can be reached at 202-634-1439.
ging,r y,
I Michael-O'Mealia G
.9301050005 920530 PDR-FOIA O'MEALIA92-267_PDR.
b_!ND LOOK 10136/602s1 ACN:-
9201280355
=DATE:
920121
-DTC:
CN/*NEHORANDUHS-CORRESPONDENCE
- DTC:
HEM 0/* INTERNAL DR EXTERNAL MEMORANDUM PAGES:
4-L1:
FORWARDS DRAFT RISK-BASED INSP GUIDE FOR AUXILIARY FEEDWATER-L2:
SYS-AT PLANT. COMMENTS REQUESTED BEFORE 920214.
KEY:
AUXILIARY FEEDWATER SYSTEMS
- KEY:
DRAFTS s
KEY:
GUIDELINES KEY:
HAZARDS KEYS INSPECTION PFL:
ADOCK-5000315-P-920121 DKTs 50315P/sDONALD C. COOK NUCLEAR POWER PLANT UNIT 1. JINDIANA-DKT:
50316P/sDONALD C. COOK NUCLEAR POWER PLANT. UNIT-2,_ INDIANA RNs1:
JORGENSON B ANs1:
DIAB S S ras 1:
NE R3/9 REGION 3-(PDST-820201)
AAs1:
NRRBTPER/6 RISK. APPLICATION BRANCH-PACKAGE:
920121-9201280355-D END 1 HITS
.gr m
9 6
i r.
,m
.. - -a
..s..-
+
e
.ibkb3h$h!0='
ACH:
9109200206 DATE:
910916 PAGES:
40 L1:
FORWARDS INSP GUIDANCE FOR OUTAGE TEAM INSP BASED OH PWR-L2:
GENERIC PRA INSIGHTS STUDY'a AVAILABLE SHUTDOWN RISK STUDY L3:
RESULTS PER REQUEST.
FICHE:
70965:088-70965: 127 PFL:
ADOCK-5000413-0-910916 PACKAGE:
910916-9109200206 0
N p - -d or,i d f" f
.l g
t e
e
/
l t
l
[
I l
,r
^-
........... ~... - - - - - - - -.. - - - - - -. - - - - - - - - - - - - -
- - - - - - - - - - ~ ~ -
L 00K REG 10129/3404:1 ACN:
9103040305 DATE:
910228 DTC:
CL/* CORRESPONDENCE-LETTERS -
DTC:
OUT/*0UTGOING CORRESPONDENCE PAGES:
2 L1:
FORWARDS BNL TECHNICAL REPT TR-A-3875-T2C REV 1
' RISK-BASED L2:
INSP GUIDES FOR WOLF CREEK GENERATING STATION (BASED ON L3:
GENERIC PRA-BASED INFO FOR PWRS).'
FICHE:
56858:166-56858:167 PFL:
ADOCK-5000482-0-910228 DKT:
504820/sWOLF CREEK GE!!ERATING STATION, WOLF CREEK NUCLEAR RPT:
TAC-72895 RNs1:
WITHERS B D ANs1:
PICKETT 0 V ras 1:
EUTWOLF/@ WOLF CREEK NUCLEAR OPERATING CORP.
AAal:
NRRBPOP2/sPROJECT DIRECTORATE IV-2 PACKAGE:
910228-9103040305 D END 1 HITS
. _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.... _ _ _ _ _ _. _