. _. _ _
mem1..
.1--.'..,.s=:----------------=-.-..___.....-..._-.
Omaha Public Power District 444 South 16th Street Mall Omaha. Nebraska 68102-2247 402/636-2000 December 23, 1992 LIC-92-371 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mall Station Pl-137 Washington, DC 20555 4
Reference:
1.
Docket No. 50-285 19,1990 (LIC-90-0982)(Document Control Desk)
Letter from OPPD (W. G. Gates) to NRC 2.
dated December 3.
Letter from 0 PPD (W. G. Gates) to NRC (Document Control Desk) dated June 1, 1992 (LIC-92-157A) 4.
Letter from NRC (S. D. Bloom) to OPPD (W. G. Gates)- dated October 19, 1992 Gentlemen:
SUBJECT:
Staff Review of Generic Letter 90-06, Resolution of Generic Issue 70, " Power-operated Relief Valve and Block Valve Reliability," and Generic issue 94,
" Additional low-Temperature Overpressure Protection for Li ht-Water Reactors " pursuant to 10 CFR 50.54(f)-
Fort Calhoun Stat $on (TAC Nos. M77351 and M77421)
Reference 2 provided the initial response from Omaha Public Power District (0 PPD) for Generic Letter 90-06, in the Reference 4 letter, OPPD was requested to submit a revised response.
Specifically, the NRC Staff noted that OPPD had declined the staff position for low Temperature Overpressure Protection (LTOP) channel outage time in the Application for Amendment of Operating -License submitted by Reference 3.
The proposed LTOP channel outage time for Fort Calhoun Station, as submitted by 0 PPD. was determined to be unacceptable by the NRC.
Reference 4 also indicated that the staff would be receptive to extending the recommended 24-hour allowed outage time with an inoperable LTOP channel to 7 days provided the plant is not in a water-solid condition. In addition, a pressurizer level must be identified which provides a level of protection against cold overpressurization comparable to that provided by the nitrogen bubble in B&W facilities. This position is acceptable to OPPD, and will be ir.corporated with technical justification into a supplemental Application for Amendment of Operating License. OPPD expects to submit this Application on or before February 1, 1993.
040006 Oll I
\\\\
9301040169 921223 PDR ADOCK 0500028S f
P PDR 45-5124 Empoymen Eq oaxxtunity
1 j
)
'LIC-92-371 Page 2 If you have any questions, please contact me or members of my staff.
Sincerely.
< \\.
1&p W. C.
ones Senio ice President WCJ/sel c:
LeBoeuf Lamb, Leiby & MacRae J. L. Mllhoan, NRC Regional Administrator, Region IV S. D. Bloom, NRC Project Manager R. P. Mullikin,- NRC Senior Resident Inspector 2
..