ML20126F552
| ML20126F552 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 05/28/1985 |
| From: | Vassallo D Office of Nuclear Reactor Regulation |
| To: | Northern States Power Co |
| Shared Package | |
| ML20126F556 | List: |
| References | |
| DPR-22-A-032 NUDOCS 8506170531 | |
| Download: ML20126F552 (4) | |
Text
-_ -
p Ktco
[6' N*-
UNITED STATES NUCLEAR REGULATORY COMMISSION
'- l WASHINGTON, D. C. 20555
\\...../
NORTHERN STATES POWER COMPANY DOCKET NO. 50-263 MONTICELLO NUCLEAR GENERATING PLANT AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 32 License No. DPR-22
=--
_ - 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Northern States Power Company (the licensee) dated September 24, 1982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission;
~
C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public and (iil that such activities will be
- conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.2 of Facility Operating License No. DPR-22 is hereby amended to read as follows:
DR AD 000 3
7-2 Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 32, are herehy incorocrated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
'~~
Domenic B. Vassallo, Chief
-~
Operating Reactors Branch #2 Division of Licensino
Attachment:
Changes to the Technical Specifications Date of Issuance:
May 28, 1985 C
O e
e
II ATTACHMENT TO LICENSE AMENDMENT NO. 32 FACILITY OPEPATING LICENSE NO. DPR-22 a
DOCKET NO. 50-263
[
Revise the Technical Specifications by addina page 25a.
s 1
m.
s l
}
J 4
e i-l -.
i
~ _ _. _.,...._-, _
1 p
'l. 0 LItuTING CONDIT10t43 F0u OPERATIDH
'4.0 st*VELLIA14CE RLQUlitDElf!'S i
4.0 Sunygtl.tAllCil Rt4Ull&l(Elf [S
![
A. The survelliance requirements of thle esction shall be met.
Each surveillance EL L
requirement ehell be performed at time 2
specified times casspt se allowed in ll a and C below.
z
.o
- 5. Specific time intervals between test s may w
be extended up to 25% of the survellence interval to accomodete nortnel test schedules with the exception that, the intervals between teste scheduled for refueling shutiluune shall not exceed two years.
C. Whenever tlee plant condition te nucle that e eve es or component le not required to be r
operable the purvattlence teettog associated 1
with that system or component pay be die-continued. Discontinued surveillance teste ehetl be resumed less than one test interval befose estabitelitng plant conditione requiting operabtitty of the eseociated system or component.
25e 3.0/4.0 I