ML20126F486
| ML20126F486 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 12/04/1992 |
| From: | Gates W OMAHA PUBLIC POWER DISTRICT |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20126F489 | List: |
| References | |
| LIC-92-338, NUDOCS 9212300349 | |
| Download: ML20126F486 (3) | |
Text
-
i Omaha Public Power District 444 South 16th street MaF Omaha, Nebraska 68102-2247 402/636 2000 December 4, 1992 LIC-92-338 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station Pl-137 Washington, DC 20555
Reference:
Docket No. 50-285 Gentlemen:
SUBJECT:
Transmittal of Changes to the Fort Calhoun Station (FCS)
Radiological Emergency Response Plan (RERP) and Emergency Plan Implementing Procedures (EPIP)
As required by 10 CFR 50 Appendix E Part V and 10 CFR 50.4(b)1(56, and 165.5)(ii), the following FCS RERP changes Er:: provided for NRC copies 154, 155, REMOVE SECTION INSERT SECTION RERP Index, Page 1 11/10/92 RERP Index, Page 1, issued 11/17/92 RERPSectionJ,Rld, issued issued 11/9/92 RERP Section J, RIO, issued 11/9/92 Summary of RERP Chanaes:
Revised to correct typographical errors.
- Section J contains Privacy Information.**
i Also, as required by 10 CFR 50 Appendix E Part V and 10 CFR 50.4(b)156, and 165.(5)(
following FCS EPIP changes are provided for NRC copies 154, 155, i
REMOVE SECTION INSERT SECTION i
FC-EPF Forms Index, issued 10/8/92 FC-EPF Forms _Index, issued 11/17/92 FC-EPF-8, R1 issued 8/1/91 FC-EPF-8, R2, issued 11/18/92 Summary of EPIP Channes:
Revised to reflect new instrument unit measurements.
l 110038 g
s PD DO OO 2851
['
NEeir F
PDR2
~
l U. S. Nuclear Regulatory Commission LIC-92-338 Page 2 1
Please return the transmittal sheets to confirm your receipt of these changes.
If you should have any questions, please contact me.
-1 Sincerely, M. N b W. G. Gates Vice President WGG/gre Attachments c:
LeBoeuf, Lamb, Leiby & MacRae J. L. Milhoan, NRC Regional Administrator, Region IV R. P. Mullikin, NRC Senior Resident inspector S. D. Bloom, NRC Project Manager 4
l
[
[
l l
l
f
.\\,
ut.utostAlis fjUCLE AR REGULATORY COMMISSION
) p '= j
{
s WAsmootok o c. 206t.6 5, g g
p/ z v /7
- Yl g /&'
W /
g MEMORANDUM FOR:
Chief. Document Control Branch, IRH FROM:
Director. Division of Freedom of Infonnation and Publications Services. ADM
SUBJECT:
REVIEW Of UTillTY EMERGENCY PLAN DOCUMENTATION The Division of Freedom of Information and Pubilcations Services has reviewed the attached document and has determined that it may now be made publicly available.
h/kw~ f//b%d d,-
y Donnie H. Grimsley, Director Division of Freedom of Infonnation and Publications Services Office of Administration 230003 I
(
l
!