ML20126F461

From kanterella
Jump to navigation Jump to search
Forwards Certificate of Compliance 9153,Rev 4 for Model Sentinel 1S Package,Constituting Authority to Use Package for Shipment of Radioactive Matl
ML20126F461
Person / Time
Site: 07100397, 07109153
Issue date: 09/19/1991
From: Macdonald C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Vogt J
TELEDYNE ENERGY SYSTEMS
Shared Package
ML20126F421 List:
References
NUDOCS 9212300323
Download: ML20126F461 (2)


Text

_ - _ - _ _ - _ .

U d,,

l t

. y, SEP 19 1991 Distribution:

NRC f/C POR NMSS/SGTB r/f Regions (5)

CMacDonald RChappell ERZiegler MMessier MHGriggs CJWithee SGTB:LY 71-9153 Teledyne Energy Systems ATTH: Mr. John F. Vogt )<P O W[9nW 'chdy/

110 W. Timonium Road Timonium, MD 21093

Dear Mr. Vogt:

As requested by your application dated July 22, 1991, enclosed is Certificate of Compliance No. 9153, Revision No. 4, for the Model No. Sentinel 15 package.

This certificate supersedes, in its entirety, Certificate of Compliance No. 9153, Revision No. 3, dated September 10, 1986.

Changes made to the enclosed certificate are indicated by vertical lines in the margin.

Those on the attached list have been registered as users of this package under the general license provisions of 10 CFR 671.12 or 49 CFR 5173.471.

This approval constitutes authority to use this package for shipment of radioactive material and for the package to be shipped in accordance with the provisions of 49 CFR 5173.471.

Sincerely, odgin*1 EM D Charles- E. MacDonald, Chief Transportation Branch 9212300323 921704 Division of Safeguards ADOCK 0710 7-

[DR and Transportation, NMSS

Enclosures:

1. Certificate of Compliance No. 9153, Rev._4
2. Approval Record cc w/ encl:

Mr. James K. O'Steen Department of Transportation Registered Users 0FC: SGTB fl :SGTB :SGTB :SGTB si .g.....: S GT B . $ ' . . . . . . . . . . . . . . . . . . .

L NAME:LYang/1j :MHGr ggs :ERZi gler :CRChappell :CMacDona d

~~

bTE khlh/9 9/B/9 / 9 h//,h9 / 9 u.evo... nernnn ennu

[. . .

O o; November 18, 1992 t

Q cjC Com ns., _S --

MEMORANDUM FOR: GLENDA JACKSON

/

PROM: GERRI FEHS' (

SUBJECT:

1992_ ANNUAL FEES _FOR TELEDYNE ENERGY SYSTEMS.

As we talked about on the phone today, I suggest the following two additions to the letter'to Teledyne about their-1992 annual fees: _, _

1. If Teledyne failed to make a timely request for-an 9

f a ' p.7 ,# xemption or a partial exemption for the 1992 annual fees and i s M,p,,r "# his failure is dispositive of the-is6ue, then I suggest that_we ha add a sentence or two saying that dirdctly. This-would~be in addition to the responso you have already prepared addressing;and-

{-diposingofeachoftheargumentsth6ymakeforanexemption.

t, 2. I also would reference the October 20,1992' letter to Telodyne from Charles Mcdonald (see attached) advising Telodyne about certain requirements that must be met regarding-the hv transfer of certificates of complianc6 and indicate that if they meet these qualifications, then future fees would reflect these

_h changes.

f L y ,

A f '

f' nm em e-g g A "J '

tuna m u 12 war _ m 1. c.t, $ OTC '7 ' ""'*

i (n ^ q u u, c.,_

- f. al~ a nk 8

L . ..

_ _ _ _ _ _ _ _ _ . _ _ _ _ _ . - _ _ _ _ _ ___ _ _5