ML20126F432

From kanterella
Jump to navigation Jump to search
Amend 88 to License DPR-20,revising Tech Specs to Extend Time,By 3 Days,That One Emergency Diesel Generator May Be Inoperable During May 1985
ML20126F432
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/05/1985
From: Zwolinski J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20126F433 List:
References
NUDOCS 8506170471
Download: ML20126F432 (4)


Text

_ _ _ _ _ _ _ _ _ _

/

'o,,

UNITED STATES 8

NUCLEAR REGULATORY COMMISSION a

5 j

WASHINGTON, D. C. 20555

~s.,...../

CONSUMERS POWER COMPANY PALISADES PLANT DOCKET NO. 50-255 AMENDMENT TO PROVISIONAL OPERATING LICENSE 1

l Amendment No. 88 l

License No. DPR-20 1.

The Nuclear Regulatory Comission (the Commission) has found that:

A.

The application for amendment by Consumers Power Company (the licensee)datedMay 24, 1985 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public; and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

8506170471850h55 PDR ADOCK 05o pg P

. 2.

Accordingly, the license is amended on a one time only basis by changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 3.B of Provisional Operating License No. DPR-20 is hereby amended to read as follows:

B.

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 88, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment became effective on May 24, 1985.

FOR THE NUCLEAR REGULATORY fM1ISSION

-k b John

. Zwolinski, Chief Opera ng Reactors Branch #5 Division of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance: June 5, 1985

ATTACHMENT TO LICENSE AMENDMENT NO. 8g PROVISIONAL OPERATING LICENSE NO. DPR-20 DOCKET NO. 50-255 4

Revise Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed pages. The revised pages are identified by the captioned amendment number and contain marginal lines indicating the area of change.

REMOVE INSERT 3-42 3-42

3.7 ELECTRICAL SYSTEMS (Cont'd) a.

Station power transformer 1-2 (2400 V) may be inoperable for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> provided the operability of both diesel generators is demonstrated imediately.

b.

Start-up transformer 1-2 (2400 V) may be inoperable for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> provided the operability of both diesel generators is demonstrated imediately. Continued operation beyond 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is pemissible provided that a report is sent to the NRC immediately with an outline of the plans for prompt restoration of the start-up transformer and the additional precautions to be taken while the transfomer is out of service, and continue operating until notified differently by the NRC.

c.

2400 V engineered safeguards bus IC or ID may be inoperable for up to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> provided the operability of the diesel generator associated with the operable bus is demonstrated imediately and there are no inoperable engineered safety feature components associated with the operable bus.

d.

480 V distribution bus 11 or 12 may be inoperable for up to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> provided there are no inoperable safety feature components associated with the operable bus.

e.

MCC No. I and 7 or 2 and 8 may be inoperable for up to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> provided there are no inoperable safety feature components associated with the operable pair of MCC.

f.

125 V d-c bus No.1 or 2 may be inoperable for up to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> provided there are no inoperable safety feature components associated with the operable bus and adequate portable emergency lighting is available during the inoperability of the No. 2 bus.

g.

One of the four preferred a-c buses may be inoperable for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> provided the reactor protection and engineered safety feature systems supplied by the remaining three buses are all operable.

h.

One of the station batteries may be inoperable for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, provided both battery chargers on the affected bus are in operation.

1.

One of the diesel generators may be inoperable for up to 7 days *

(total for both) during any month, provided the other diesel is started to verify operability, shutdown and the controls are left in the automatic mode, and there are no inoperable engineered safety feature components associated with the operable diesel generator.

  • 10 days one time only, for the month of May 1985.

3-42 Amendment No. 88