ML20126F066
| ML20126F066 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 12/22/1992 |
| From: | Meyer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Denton R BALTIMORE GAS & ELECTRIC CO. |
| References | |
| RTR-NUREG-1021 NUDOCS 9212300098 | |
| Download: ML20126F066 (3) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _
(
4 DEC 2;. L32 1
Docket Nos. 50 317 50-318 Mr. Robert li. Denton Vice President - Nuclear linergy Italtimore Gas and lilectric Company Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway
~
Lusby, Maryland 20657 - 4702
Dear Mr. Denton:
SUldliCT: Rl! ACTOR AND SliNIOR RilACTOR OPliRATOR LICIINSING liXAMINATIONS In a telephone conversation between Mr. M. Coon and Mr. R. Temps, arrangements were
(
made for the administration of licensing examinations at the Calvert Cliffs Nuclear Power Plant, Unit Nos.1 and 2.
The written examinations and operating tests are scheduled for the week of April 26,1993.
Your staff will be given an opportunity to review the licensing examinations in accordance with the guidelines in NURliG-1021, " Operator Licensing fixaminer Standards," Proposed Revision 7, (liS 201, Attachment 4) during the week of April 12, 1993.
To prepare the examinations and meet the above schedule, it will be necessary for your staff to furnish the reference materials identified in Attachment 2 of 11S-201 by February 12, 1993.
Any delay in receiving approved and indexed reference material or the submittal of inadequate or incomplete reference material may result in the examination being rescheduled.
The NRC will prepare and administer the written examinations in accordance with 11S-401 and 11S-402 of NURIiG-1021. In order to conduct the requested examinations, it will be necessary for your staff to provide adequate space and accommodations on the date noted above. The NRC's guidelines for administering the written examinations are described in liS-402, Attachment 1.
OFFICIAL RiiCORD COPY G:OL12-17.RT e
9212300090 921222
{DR ADOCK 05000317 hV
[]
(\\/
eon
/
hir Robert E. Denton 2
The NRC will prepare and administer the operating tests in accordance with ES-301 and ES-302 of NUREG-1021. In order to conduct the requested operating tests, it will be necessary for your staff to make the simulation facility available on the dates noted above. Your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
ES-402, Attachment 2, and ES-302, Attachment 1, contain a number of NRC policies and guide _ lines that will be in effect while the written examination and operating tests are being administered.
Your staff should submit preliminary senior reactor operator license applications and waiver requests at least 30 days before the nrst examination date so that the NRC will be able to review the applications and the medical certifications and evaluate any requested waivers. If the applications are not received at least 30 days before the examination date, a }xistponement may be necessary. Final, sige
- applications certifying that all training has been completed should be submitted at least 1. ays before the first examination date.
This request is covered by Office of hianagement and Budget Clearance Number 3150-0101 which expires October 31,1995. The estimated average 'ourden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, includes gathering, xeroxing, and mailing the required material. Send comments about this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Records and Reports hianagement Branch, hiNBB-7714, Division of Information Support Services, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the Paperwork-Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NEOB-3019, Office of Management and Budget, Washington, D.C. 20503.
Thank you for your consideration in this latter. Mr. Coon has been advised of the NRC guidelines and policies addressed in this letter, if you have any questions on the evaluation process, please contact me at (215) 337-5211.
Sincerely,
&;ats&W tu
\\
Am49 k,,k'f;f
^
Glenn W, hieyer, Chief j
PWR Section Operations Branch Division of Reactor Safety J
OFFICIAL RECORD COPY G:OL12-17,RT I
e wtM TWyey" yq 94Wt%*-TW-N""
VW1--D 98
- -TF-""'*9' Y
YH'
'f I
i w
Mr. Robert E. Denton 3
cc w/cncl:
G. Detter, Director, Nuclear Regulatory Matters (CCNPPJ -
R. McD:an, Administrator, Nuclear Evaluations J. Walter, Engineering Division, Public Service Commission of Maryland K. Burger, Esquire, Maryland People's Counsel R. Ochs, Maryland Safe Energy Coalition K. Abraham, PAO (23) SALP Reports and (2) All Inspection Reports
]
Public Document Room (PDR)
- Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident inspector State of Maryland (2) bec w/cnct Region I Docket Room _(witt concurrences)
C. Cowgill, DRP J. Yerokun, DRP L. Nicholson, DRP S. Greenlee, DRP P. Wilson, SRI - Calvert Cliffs V. McCree, OEDO R. Capra, NRR D. Mcdonald, NRR DRS/EB SALP Coordinator D. Holody, EO G. Meyer, DRS R. Temps, DRS OL Facility File.
DRS Files RI:DRS RI RS Temps /ajk :'
b 12/21/92
- (12/y/92 Gl%T'~
r OFFICIAL RECORD COPY G:OL1217.RT
,,r-r..e.;,~,
-,-p~rvcre-~m,..--
4-,'1,
- -~
,.,.,,y
...w,,
,,,e yi