February 10, 1981
'ItP-1-1711 Mr. Boyce H. Grier 0
Director, Region 1 e
Office of Inspection and Enforcemnt d' {V U.S. Nuclear Regulatary Cortnission
..e
,p'%["/
'f,B 631 Park Avenue King of Prussia. Pennsylvania 19406 REFEREHCE:
Provisional license DPR-21
' s:,,%/
1
/gf S
Docket Number 50-245 A,
Reportable Occurrence R0-81-01/IP s
/
Dear Mr. Grier:
9 U
i l
This letter is forwarded to provide proept notification of Reportable Occurrence R0-81-01/1P as required by the Hillstone Unit 1 Technical i
Speci fications.-
l On February 9,1981 at 1120 hours0.013 days <br />0.311 hours <br />0.00185 weeks <br />4.2616e-4 months <br />, Class I Inservice Inspection of Low Pressure Coolant Injection System (LPCI), subsystem B, revealed a flaw j
in a pipe weld between the primary containrent penetration and the Entme,r e is ola tion Check Valve.
The cause of f a i l u e-o is not known at the present time; an investigation is in progress.
Additional inforntion including the cause of failure and corrective I
action will be included in a 14 day follow-up report.
i Yours truly, fl0RTHEAST NUCLEAR ENERGY COMPANY
, J. Mroczka Station Superintendent Millstone Nuclear Power Station MJB/EJM: raw cc:
Director, Office of Managemnt Enforcement and Program Control.
Washington, D.C.
(2)
Director, Office of Management Inforr:etion and Progran. Control, l
Hashington. D.C.
U.S. Nuclear Regulatory Cor: mission, c/o Document 11anagerent Branch, Washington. D.C.
20555 9