OPERATING DATA REPORT DOCKET No.
,,,,,,Q50- 0 3 31
{
DATE:
_J2-15-92 COMPLETED BY:
Richard Woodward TELEPHONE:
(319) 851-7318 OPERATING STATUS 1.
Unit Name Duane Arnold Enerav Center 2.
Reporting Periodt October 1992 Notes 3.
Licensed Thermal Povier (HWt): _l650 4.
Nameplate Rating (Gross MWe):
565 iTurbine) 5.
Design Electrical Rating (Not MWe):
538 6.
Maxic.
Dependable Capacity (Gross MWo):
545 7.
Maximus Dependable Capacity (Net MWe):
515 8.
If Changes Occur in Capacity Ratings (Items Number 3 t.hrough 7) since the last report, Give Reasons J!/A_
9.
Power Level to Which Rostricted, If Any (Net MWe):
N/A 10.
Reasono for Restrictions, If Any
.N/A This Month Yr-to Date Cunulat ive
- 11. Hours in Reporting Period 745 7,320.0 155,592.0
- 12. Nwber of Mcurs Reactor Was Critical -
745 5,809.8 114,598.1
- 13. Reactor Reserve Shutdown Hours 0
0.0 192.8
- 14. Hours Generator on-Line 745 5,740.1 111,648.2
- 15. Unit Reserve Shutdown Hours 0
0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,215,425.0 8.-825,405.7
. 150,879,002.1
- 17. Gross flectrical Energy Generated (MWH) 409,033.0 2,933,928.5 50,900,254.5
- 18. Net Electrical Energy Generated (MWH) 385,720.6 2,748,576.3
- 47,713,088.4
- 19. Unit Service Factor 100.0%
73.4%
71.8%
- 20. - Unit Availability Factor 100.0%
76.4%
71.8%
- 21. Unit capacity Factor (using NOC Net) 100.5%
72.9%
61.0%
- 22. Unit Capacity Factor (Using DER Net) 96.2%
69.8%
58.4%
- 23. Unit Forced Outage Rate 0.0%
1.7 12.6
- 24. Shutdownt dcheduled Over Next 6 Months (Type, Date, and Duration of each:
N/A 25.
If Shutdown at Erd of Report Period, Est. Date of Startup; k/A 9212300066 921031~
PDR.ADOCK 05000331
.R PDR r
sae-e.
w+-
1
.... _ ~..... _ _.
u' i
t 4
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.-
050-0331 l.
DATE:
12-15-92 COMPLETED BY:
Richard Woodward TELEPHONE:
(319) 851-7318
- l. MONT!! OctoD2r 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER. LEVEL (HWe-Net)
(MWe-Not) 1 468 16 530
.3 459 17 529 3-513 18 529 4
518 19 531 5
518 20
.528 7
E70 21 528 i
6-524 22 523
- 8 523 23 519 9-487 24 457 10 522 25 521 11 526 26 527 12-528 27 530 13 52}
28 529 l~
14 527 29 530 15 526 30 530 31 527 P
f k
r-
_._.__.,_.m m
m. _...
b 1
C
.- w --
e
~,
+
. REFUELING INFORMATION-DOCKET No.
50-0331
-DATE:
J S792 4.hard Woodward COMPLETED BY -
- 9) 851-7318 TELEPHONE:
')..
Name of facility.
a.
- Duane Arnold Energy Center f
37 Scheduled date for next refueling shutdown.
a.
July, 1993 3.
scheduled date for restart following refueling.
a..
September, 1993
- 4.
Will refueling or resumption of operatton thereafter require a-technical specs.fication change or other license amendmout?
N/A U.
. scheduled date(s) for submitting proposed licencing action and supporting-
[
information.
N/A.
. i 6.
.Important licensing considerations associated with refueling, e.g.,1new or
.different fuel design or supplier, enreviewed design or performance analysis methods, significant changes in fuel design, now operating procedures.-
N/A
~
.7.
The' number of fuel aestmblies (a) in the core, (b) in the spent fuel storage
- pool, a.
368 b.
1152 s
18.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies, a.
2050 - Liccased Capacity or b.
1898 under the presently installed storage rack capacity, s
9.-
.The projected date.of the last refueling that can be discharged to the' spent il fuel pool assuming the-present licensed capacity.
a.
2000 - Licenrea capacity or b.
1997 under the i.resently installed storage rack capacity.
I r
+
~
k t
g N
f f
P f
W9 9
"V' W '
h
~,.
A I
Docket No:
050-0331-Uniti Duane Arnold Energy Cer.ter~
UNIT' SHUTDOWNS AND POWER REDUCTIONS Date: 12/15/92' REPORT MONTH: October 1992-Completed by: Richard Woodward Telephone:
(319) 851-7318 No.
Date Type (l)
Duration Reason (2)
. Method of Licensee System comp.
Cause
-(Hours)
Shutting (3)
Event Code Code Down Reactor Report #
(4)
(5)
N/A l
t E
A kr l
I i
i 5
t i'
l l - F:' Forced 2'- Reason:
3-Method:
4 - Exhibit G-S Scheduled A-Equipment Failure (Explain) 1-Manual Instructions for B-Maintenance or Test 2-Manual Scram Preparation of Data C-Re fueling 3-Automatic Scram Entry Sheets for.
D-Regulatory Restrictiota
. 4-Continued' Licensee Event Report E-Operator. Training & License Examination 5-Reduced Load (LER) File (NUREG-Ol61)
F-Administrative 9-Other (Explain)
G-Operational Error (Explain)
'S - Exhibit 1 H-Other-(Explain.
(Same Source) i g-g 9' y
.)
7 r-'--
g y
r y9y394 g-7 g
1.
I[ r!
{
l s
n <6 r
7.
et.
ne' C~~
'y -
g-re
.d-n r E a8w1 d.d3 l
o7 o
o-N n'W1 O
I
~ r2 5 3A9d8 T
3 r
P I
0e5a) n 1's 9 R
0a c1 C
5u2i3 S
0D1R(
E D
.tEYe oiTBn NnA o UDDh t
Ec e
Te k
El c
-Le o
PT D
.M O
C E
CNA a.
m i
h I
AM T
D N
E E
T N
A O
L P
E M
R O
C i
l ir A
S
/R O
JA M
METSYS A
E
/
T N
A D
ll c:I.
l J
G
.-._m r
J DOCKET NO.
50-0331 l-DATE:
12/15/92 COMPLETED BY:.i_BJghard Woodward?
TELEPHONE:
f319) 851-7318 Monthly' operational overview of October 1992 The DAEC operated at 97% capacity factor (DER - grons).- Power was reduced to 60%
for the equivalent of eight hours on October 1, on October 9, and on October 24 to enter the heater bay for maintenance and testing. Except for other minor reductiona.
to perform CRD exercises, surveillances, and load following, the plant remained at full thermal power for rest of the month. The following table summarizes operation MWe
% of 565.7 MWe
% of 745 Full Power Equivalent Hours Weather, Load Following 4.5 0.8%
5.9 s
Equipment Limitation 12.2 2.2 16.1 Gross Electric output 549.0 97.0%
222x2 Design Rated
-Electric Output 565.7 100.0%
745.0
-On-October 19 the plant entered a 30 day administrative limiting condition for operation (LCO)'for maintenance on the out of service "A" Control Building Chiller.
The LCO was required by a plant special order and operating instructions, but not by.
the technical specifications. The "B" Control Building Chiller was in service to.
supply chilled water for the cooling coils of the associated air-conditioning unit.
The. chilled water system and air conditioning units maintain acceptable temperature
-for control room plant personnel equipment.
On October'22 at 12:56-hours,cwith the' plant at 99.9% -hermal power and the "A"
chiller still out of service, the "B"Echillwr tripped. Attempts to re-start the
-chiller were successful, but it' tripped again, after a short period of time, for unknown reascns. At'13:21 the "B" chiller was declared inoperable since operation could not be maintained, and a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> administrative LCO was entered. As part of trouble shooting activities, maintenance M rsonnel discovered air in the chllled water piping which they vented. The "B" chiller was restarted at 15:10. At 16.10 the "R" chlller was declared operable and the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> LCO was exited.
The 30 day LCO for the "A" chiller remained in effect.- LER 92-016-(pending) aOn October 26 with the reactor operating at 100% a quality assurance = surveillance identified four missed hourly firewatches, two in the Realdual Heat Removal Valve Room on October 10, and two in the High-Pressure Coolant Injection Room on October 7 and 10.
The personnel who performed the firewatches failed.to prop rly use the firewatch checklist. All personnel who perform firewatches have since been instructed on the use of.and adherence to the firewatch checklist, All firewatch
. personnel will have additional -formal training on f he proper firewatch methods and-checklist usage.. Fire detection and suppression egipment in the affected' areas was operable throughout the event. The event had no offect on the safe continued operation of the facility. LER 92-017 (pending)