ML20126E790
| ML20126E790 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 05/28/1985 |
| From: | Vassallo D Office of Nuclear Reactor Regulation |
| To: | Corn Belt Power Cooperative, Central Iowa Power Cooperative, Iowa Electric Light & Power Co |
| Shared Package | |
| ML20126E793 | List: |
| References | |
| DPR-49-A-122 NUDOCS 8506170222 | |
| Download: ML20126E790 (4) | |
Text
.
j##4 UNITED STATES
-ON-NUCLEAR REGULATORY COMMISSION 3
.., j WASHINGTON, D. C. 20555 e
'...../
IOWA ELECTRIC LIGHT AND POWER COMPANY CENTRAL IOWA POWER COOPERATIVE CORN BELT POWER COOPERATIVE DOCKET NO. 50-331 DUANE ARNOLD EiiERGY CENTER AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 122 m
License No. DPR-49 1.-
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Iowa Electric Light & Power Company, et al, dated December 7, 1984, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the.
provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technica.1 Specifi-cations as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. DPR-49 is hereby amended to read as follows:
8506170222 850528 DR ADOCK O gi
. (2) Technical Specifications The Technical Specifications contained in Appendices A and'B, as revised through Amendment No.122, are hereby incorporated in~the license.. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
The license amendment is effective as of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance:
May 28,1985
[
l i
ATTACHMENT TO LICENSE AMENDMENT NO. 122 FACILITY OPERATING LICENSE NO. DPR-49 DOCKET NO. 50-331 Revise the Appendix "A" Technical Specifications by removing the current page 3.7-24 and inserting the revised page 3.7-24.
The revised area is identified by a vertical line.
l m
Q' O
a s
5, e
-,m,-
,-y
. =+-
s4i m.
,-w---
+
-r
DAEC-1 NOTES TO TARLE 3.7-2 I Test volume is filled with demineralized water then pressurized to 1.10 Pa with air or nitronen for test. For all other penetrations (except 7A-0), test voimies are pressurized to P with air or nitroaen for test.
l a
2MO 4441, MO-44a2 will be remote manually closed.
E.-.
~3 In 'accordance with 10 CFR 50, Appendix A, General Desian Criterion 57, the redundant barriers are a sinole isolation valve outside containment and a closed system inside. Testina of the sinale isolation valve only is recuired.
~
" Tested in reverse direction.
w 7
i AmendmentNo.)Rf,122 3.7-24
.. _ _. _. -. _ _ _ _ _