ML20126E510
| ML20126E510 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 12/18/1992 |
| From: | TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | |
| Shared Package | |
| ML20126E501 | List: |
| References | |
| PROC-921218-01, NUDOCS 9212290165 | |
| Download: ML20126E510 (3) | |
Text
.
Errata to Revision 9 O
Please. replace the following page in the Revision 9 package with the corresponding attached page.
Remove from R9 Dackaoe Insert from errata 2-25 2-25 O
h O
9212290165 '/21221 PDR ADOCK 05000445 P
IECHNICAL REOUIREMENT 2.1 (continued)
^
TABLE 2.1.1 (continued)
\\
CONTAINMENT ISOLATION VALVES L
MAXIMUM ISOLATION NOTES AND FSAR TABLE TIME LEAK TEST VALVE NO.
REFERENCE NO.*
LINE OR SERVICE Lieconds1 REOUIREMENTS
- 10. Relief Valves (Continued)
RC-036 41a Penetration Ther-N.A.
C 8
mal Relief WP-7176 52a Penetration Ther-N.A.
C 8
mal Relief D0-430 60a Penetration Ther-N.A.
C 8
mal Relief V0-907 61a Penetration Ther-N.A.
C 8
mal Relief PS-503 74a Penetration Ther-N.A.
C 8
mal Relief PS-501 77a Penetration Ther-H.A.
C 8
nel Relief PS-502 78a Penetration Ther-N.A.
C 8
mal Relief P5-500 80a Penetration Ther-N.A.
C 8
mal Relief WP-7177 Bla Penetration Ther-N.A.
C 8
mal Relief 151-8972 83a Penetration Ther-N.A.
C 9
251-8983 nel Relief ICC-1067 114a Penetration Ther-N.A.
C 9
2CC-1090 mal Relief ICH-0271 120a Penetration Ther-N.A.
C 9
2CH-0281 mal Relief 1CH-0272 121a Penetration Ther-N.A.
C 9
2CH-0282 mal Relief 51-0182 125 Pressure Relief H.A.
N.A.
9 for Bonnet of 9
MOV 8811A 9
O CDMANCHE PEAK - UNITS 1 AND 2 2-25 Revision 9 December 18, 1992
di-
_ _. _ _. _rja6saw p
ky4 pg[d w/ q a u
~
Dallas Distributed l Site: Distributed; SN g
g-W.:G. Counsil 19BT W. J.1Cahill,LJr.;
E22!
W. M.-Taylor 19BT BY SUBJECT
-R. D. Walker /
24ST-T.,A. Hope /C..Rau(IR)A09:
J.-S.
Marshall
.M.-R. Blevins.
-- A0 8 '.
R.-A. Wooldridge 32BT D.!McAfee/R. : Byrd. ~ _A0 8 F. Johnson (FC)
W. GuldemondL (ISEG):' A08; L. Haltom 21BT D..L.LDavis'(IOER): _ A08' CCS E06 H. D. Bruner' E21.
BY SUBJECT T. - E. Radican _ (NODIL)y C07A.-
D. R. Woodlan 24ST
'C._L. Tor d.
E 01-A. Husain 24SL J. W.'Mu?.lett
-C07B J. L. Vota (W)- (FC)
D. Reite*
-006-CASE D. Buschbaum-006' J..Ellis (FC)
R. D.-Calder
- E29' DOCKET RELATED J. J. Kelley:
-009 R. M. Fillmore 32BT J. F. McMahon--
Tol; D.'Fiorelli 16BT CPSES IR & RESPONSES B. C. Jones 21BT
- % audes
-;r J.
L. French (FC)
.E '
4... _ _
w GENERIC ORC or STIPULATION RELATED
~E24_;g)/dyd L. D. Nace-27ST
.S.
S.:Palmerz O-N.-S.
Reynolds. (FC)
VENDOR CPSES IR ONLY 8
E. INu.
.FG,
^
- 7..u.aeman
( FQ -
12THER
-0.. Fe..ll-("C)
,TXX File (Site)-
-A09 SDAR/PART 21'S 1r dee @p h le4 a
- m. C=m
=-
of g gi A
21d?
i%
OTHER TXX-File (Corp) L24 ST M6h NOTES:-
(FC) - First Class Mail ~
.IR - Inspection. Reports NODIL -
Correspondence related to material / component acceptability'.
CASE -
Citizens-Association for Sound Energy -JAll. filings 1and?
q correspondence _between the NRC staff and TU Electric.-
J VENDOR -
Vendor documents per'STA-206 (Vendor Document Group or?VETIP-.
Coordinator).
r.
SDAR/21s-LER IR(CPSES)
IR( ALL).
NRC'B
.GL-lIN ~
LARi IOER
- X X
X i X --
q
-ISEG X
X X
X-X
. ORC:
X-X-
X X
X X-7V:
ORC also includes description letters for changes to licensing-basis document.
November 16, 1992' i