ML20126E260
| ML20126E260 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point File:Consumers Energy icon.png |
| Issue date: | 03/16/1965 |
| From: | Haueter R CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Boyd R US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 8101150746 | |
| Download: ML20126E260 (2) | |
Text
.. -.
-. =.
e 3
I oeq g
(,*p%~
>- z B
N E$
IN&)
E u wqJ tf ee g
y$h0NSUM ERS POWER COMPANY 00 a"
GENERAL OFFICEb e JACKSON, MICillG AN 4
to Mr.rch 16, 1965 R
d
~
Re: Docket 2fo. 50-155 Mr. Roger S. Boyd, Chief Reccarch & Pcver Reactor Safety Branch Division of Reertor LicensinE United States Atomic Energy Cconission
[g g #0pg f
Washington, D. C. 205k5 wc s Detr Mr. Boyd:
In response to your letter of March 12, 1965 requesting an eetimated schedule of withdrexil ard returL of special nuclear rrterisi under Facility License No. DPR-6 our current best estimate I
is as follcus.
Tiscal Yesr IV/>
Withyrevalc_
Fiscal Yeir 1M5_
T1nEcs.)
3 rd.
4 th.
I st.
2 nd.
3 rd.
k th.
Q2:.rter Quc.rter Quarter 42arter Qxtrter Qur.rter Total 60 Fr.richnent:
60 2.6%
65 h. 27, Returns
{lr 6.)
34 Enrichr.ent:
17 17 2.@fe to h.pf, Plans fer fabrication of the ncrt batch of fuel have been delayed due to the current shutdcun of Bic Rock Point, there-fore, please note that the withdrawal that vas previously scheduled for the Fourth Quarter, Tiscal Year 1965 has now been rescheduled for the Second Quarter, Tiscal Year 1W4.
Yours very truly, i
,~ s p
f 5.
^
fh r;
f
)
Robert L. Haucter j
Assistant I.lectric Production Oh Superintendent - Nuclear gh;
-Y.,
ELH/pgk iMad YbWYY
. l (h,..IJk., e n, qu u.
~
,.a J
. - -