ML20126E189

From kanterella
Jump to navigation Jump to search
Advises That Util Is Adopting Early Implementation of 10CFR20.1001-20.2401 for Protection Against Radiation
ML20126E189
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 12/21/1992
From: Beckman W
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9212290048
Download: ML20126E189 (1)


Text

,

e.

s.

. Consumers William L Deckman

' Rg hant Manager MICHIGAN 5 FROGRESS Big Rock Point Nuclear Plant,10269 US 31 North, charlevoix, MI 49720 December 21, 1992 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT -

IMPLEMENTATION OF THE REVISED TITLE 10 CODE OF FEDERAL REGULATIONS, PART 20.

(10 CFR 20)

This letter provides the written notification required by s 20.1008 of the revised 10 CFR 20, Standards for Protection Against Radiation, that Consumers Power Company is adopting early implementation of ss 20.1001-20.2401 and associated appendices on January 1,1993, at-its Big Rock Point Plant, facility Operating License No. DPR-06. -Consumers Power Company has documented the bases for our method of implementation for each section of the Final Rule requiring specific implementation actions, including interpretation of ss 20.101-20.2401 requirements and any regulatory guidance where necessary.

These bases will be made available for review by NRC personnel upon request.

f)

William L Beckman Plant Manager CC: Administrator, Region III, USNRC NRC Resident Inspector - Big Rock Point ATTACHMENT E80010 m

S2ja2pggghsygp g

9 P

A C415 GVERGYCOMPANY

.