ML20126D924
| ML20126D924 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 12/02/1992 |
| From: | Dan Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W GEORGIA POWER CO. |
| Shared Package | |
| ML20126D927 | List: |
| References | |
| NUDOCS 9212280233 | |
| Download: ML20126D924 (3) | |
See also: IR 05000321/1992031
Text
.
. _ _ _ _ _ _ _ _ _ _ _ _
._ ._.
2 992
.
Docket Nos. 50 321, 50-366
Georgia Power Company
A11N:
Mr. W. G. llairston, 111
Senior Vice President
Nuclear Operations
_-
P. O. Box 1295
Birmingham, AL 35201
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NOS. 50 321/92-31 AND 50-366/92-31
This refers to the inspection conducted by W. J. Tobin of this office on
November 3-5, 1992. The inspection included a review of activities authorized
for your llatch facility. At the conclusion of the inspection, the findings
were discussed with those members of your staff identified in the enclosed
report.
The inspection consisted of selected examinations of your Drug and Alcohol
Abuse Policy, corporate and site implementation procedures, chemical testing
program, interviews with employees and contractors, observation of your
Collection Facility and review of pertinent records and reports.
Within the scope of the inspection, violations or deviations were not
identified.
in accordance with 10 CFR 2.790 of the NRC's " Rule of Practice," a copy of
this letter and its enclosures will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
-
Sincerely,
b
Douglas M. Collins, Chief
Nuclear Materials Safety and
Safeguards Branch
Division of Radiation Safety
and Safeguards
Enclosure:
(See page 2)
9212280233 921202
ADOCK 05000321
l
0
.Z80 l
_ _ _ _ _ - _ _ _ _ _ _ _
1
l
, . * *
.
Georgia Power Company
2
2 1992
Enclosure:
NRC Inspection Report
cc w/ enc 1:
R. P. Mcdonald, Executive Vice
President, Nuclear Operations
Georgi: Power Company
P. O. Box 1295
Birmingham, AL 35201
J. T. Beckham
Vice President, Plant Hatch
Georgia Power Company
P. O. Box 1295
Birmingham, AL 35201
11. L. Sumner
General Manager, Plant Hatch
Georgia Power Company
Route 1, Box 439
Baxley, GA 31513
5. J. Bethay
Manager Licensing - Hatch
Georgia Power Company
P. O. Box 1295
Birmingham, AL 35201
Ernest L. Blake Esq.
Shaw, Pittman, Potts and
Trowbridge
2300 N Street, NW
Washington, D. C.
20037
Charles H. Badger
Office of Planning and Budget
Room 610
270 Washington Street, SW
Atlanta, GA 30334
Harold Reheis, Director
Department of Natural Resources
205 Butler Street, SE, Suite 1252
Atlanta, GA 30334
(cc w/ encl cont'd - See page 3)
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _
.
_
_ . _ _ .
_
I
.
- *
,4
.
,
Georgia Power Company
3
2 1992
(cc w/ encl cont'd)
Thomas Hill, Manager
.
Radioacti<e Materials Program
'
Department of Natural Resources
4244 International Parkway
Suite 114
'
Atlanta, GA 30354
f
Chairman
Appling County Commissioners
County Courthouse
Baxley, GA 31513
?
Dan H. Smith
Vice President
Power Supply Operations
'
Oglethorpe Power Corporation
2100 E.-Exchange Place
Tucker, GA -30085 1349
Charles A. Patrizia, Esq.
Paul, Hastings, Janofsky & Walker
12th Floor
1050 Connecticut Avenue, NW
Washington, D. C.
20036
i
bec w/ encl;
K. N. Jabbour, NRR
A. R. Herdt, RII
P. H. Skinner, Ril
Document Control Desk
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
.
Route 1, Box 725
Baxley, GA 31513
NRR/DRIS/SB
Ril:DR S
b SS
.
1 : 0 .,
Dy
,;
I
- JC
I
RE
SY UR
- t0LLINS
'
1T/0/92
1T/0//92
17/01/92
14 02-/92
l
l ..
.
.
-
-
. -
- -.-.- ..
.
-
.