ML20126D809
| ML20126D809 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 12/17/1992 |
| From: | Feigenbaum T, Grossi R NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NYN-92169, NUDOCS 9212280171 | |
| Download: ML20126D809 (2) | |
Text
.
P.O. Box 300 fOdh seabrook. "" 03874 jh Telephone (603)474 9521 facsimile (603)474 2987 Enotgy Servico Cotporation Ted c, reigenbnum Senior Vice President and Chief Nuclear Officer NYN 92169 December 17, 1992 United States Nuclear Regulatory Cornmission Washington, D.C.
20555 Attention:
Document Control Desk
References:
(a)
Facility Operating License No. NPF 86, Docket No. 50 443 (b)
Letter dated May 13,1992 from W.11. Ellis (NU) and 11ernard M. Fox (NU) to James M. Taylor (USNRC), regarding the proposed acquisition of PSNil
Subject:
Repoiling of Information in Accordance with License Conditions Gentlemen:
In Amendment No.10 to the Seabrook operating license l Reference (a)], the NRC imposed certain reporting conditions on Nolth Atlantic Energy Service Corporation (North Atlantic) and the other licensees of Scabrook Station, the Joint Owners. North Atlantic and
- e Executive Comm' of the Seabrook Joint Owners hereby informs the NRC of two issues related to thos ditions.
In its is6uance oi imendment N-
' and the associated license conditions, the NRC placed considerable focus on the act
't
., of the Oversight Committee.
The Oversight Committee was created by the Executive rmumittee of the Seabrook Joint Owners on July 29, 1992 and reports to those Joint Owr er-not affiliated with Northeast Utilities. The Executive Committee of the Joint Owners created the Oversight Committee for the purpose of performing operational monitoring and review of the activities of North Atlantic.
The Oversight Committee has recently audited the activities performed by North Atlantic in operating Seabrook Station, Their review consisted of an extenslie review of documents, numerous interviews of North Atlantic personnel and field inspections. This review is documented in a seport recently received by North Atlantic.
The Oversight Committee concluded that Seabrook is a well managed, maintained and safely ope sted plant operated by knowledgeable personnel. No significant nuclear safety concerns were identified. North Atlanti: and the Joint Owner Executive Com.nittee have reviewed the Oversight Committee's ar,sessment and believe that no report is required under the license conditions of Amendment No.10. Nonethelesti, North Atlantic has reviewed the report and its conclusions with the NRC Senior Resident inspector. Further, the report is on file at Seabrook Station and is available for NRC review, 2800G 9212280171 921217 L I()
PDR ADOCK 05000443 I
P PDR l'
________L__________________
e P
Unlied States Nuclear Regulatory Commission December 17, 1992
- Attention:
Document Control Desk Page two Second, Amendment No.10 requires the Joint Owners to report. *any changes to the annual operations and maintenance and capital expenditure budgels'. In Reference (b), the 1992 Operations and Maintenance budget was reported as $146.7 million.
During their November,1992 rnceting, the joint Owners approved an increase in the 1992 Operations and Maintenance budget of $2.5 million, from $146.7 million to $149.2 million. In that same rnecting, the Joint Owners approved a capital budget of $8,5 million. This reflects a change from the $18.5 million capital budget reported to the NRC in Reference (b). The bulk of this reduction represents an accounting adjustruent to reflect a claims actilement and has no significant impact on the capital improvement program.
Should you have any questior's regarding this matter, please feel free to contact Mr.
Terry L. liarps,ter, Director of Licensing Services, at (603) 474 9521, extension 2765.
3 fp g-,
Very truly yours,
/
/yLF
[f Gem h<'. -< -/b
+
' Itichart, Ifbssi, Chairrnan Ted C. Felgenbaum i
f/ Joint Owner Executive Committee-TCF:AMC/ tad ec:
Mr. Thomas T. Martin Regional Administrator U. S. Nuclear Regulatory Commission Region 1 475 A!!cndale Road King of Prussia, PA 19406 Mr. Gordon E. Edison, Sr. "roject Manager l'roject Directorate 13 Division of Reactor Prnier.s U.S. Nuclear Regulatory <.'ori. mission Washington, DC 20555 Mr. Noel Dudley NRC Senior Resident inspector P.O. Ilox 1149 Seabrook, Nil 03874 i
l
\\
L l
l l
L
FEL.-J:s.s M.
""A. Ens r.
o A,
O' A. k u r he-fr%A, &
, FSr.
mdn e
>~.., qs ~ 3 n, w h)e w y <('^ 7 ca,) p,.3,
c:-
l>/ EPRI p Py c^ F 6ie/!,
a__-
4m_
_