ML20126D771

From kanterella
Jump to navigation Jump to search
Forwards Requalification Program Evaluation Rept 50-423/92-25 (OL-RQ) Administered on 921116-19.All Twelve Operators Passed written,walk-through & Simulator Portions of Exam.Program Assigned Rating of Satisfactory
ML20126D771
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/21/1992
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20126D774 List:
References
NUDOCS 9212280154
Download: ML20126D771 (3)


See also: IR 05000423/1992025

Text

- _ _ _ _ _ _

s

  • *

Qq

a

Docket No. 50-423 DEC ? 1 1992

hir. John F. Opeka

Executive Vice President - Nuclear

Northeast Nuclear Energy Company

P. O. Box 270

Hartford, Connecticut 06141-0270

Dear hir. Opeka:

SUBJECT: REQUALIFICATION PROGRAh! EVALUATION REPORT NO. 50-423/

92-25 (OL-RQ)

From November 16 - 19, 1992, the NRC administered requalification examinations to four

employees of your company who operate the Millstone Unit 3 Plant. These examinations,

coupled with those administered from December 2 - 6,1991, in which eight operators were

examined, result in a total of twelve operators examined by the NRC All twelve operators

passed the written, walk-through, and simulator portions of the examination based on NRC's

grading of the examination. As a result of these evaluations, your requalification program

has been assigned an overall program rating of satisfactory in accordance with the criteria of

NUREG-1021, ES-601.

The evaluation was conducted in accordance with proposed Revision 7 to NUREG-1021,

Operator Licensing Examiner Standards, ES-601, " Administration of NRC Requalification

Program Evaluations." The evaluation had two purposes, evaluating the effectiveness of the

licensed operator requalification training program at maintaining the competency of licensed

operators, and examining the individual operators to d_etermine if they would satisfy the

regulatory requirement of passing an NRC administered examination prior to license renewal.

At the conclusion of the examination, the results of the examination and any generic findings

were discussed with hir. Black, hir. Clement and other members of your staff.

In addition to the examinations and subsequent training program evaluation, the NRC

performed an inspection of the hiillstone Unit 3 requalification training program. The

purpose of this inspection was to determine whether or not there existed any training

deficiencies indicative of those identified after the previously conducted hiillstone Unit I

unsatisfactory program evaluation. No significant similarities were identified; however,

minor concerns were noted, all of which were discussed in detail with hir Stotts, hip-3

training supervisor. These concerns were also briefly discussed during the exit meeting of

November 19, 1992, with members of your staff, as noted above.

OFFICIAL RECORD COPY G: hts 3RQ.92

9212280154 921221

PDR ADOCK 05000423

. .

\

_

__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _

e a

Mr. John F. Opeka 2

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and

the enclosure will be placed in the NRC Public Document Room.

Should you have any questions regarding this examination and inspection, please contact me

at 215-337-5291.

Sincerely,

h$1 ?G / tt.t

Lee H. Bettenhausen, ChicU

-

Operations Branch

Division of Reactor Safety

Enclosure: Examination Report No. 50-423/92-25 (OL-RQ)

w/ Attachments 1 and 2

Attachments:

I

1. Northeast Utilities Ixtter from S. E. Scace to

Dr. L. Bettenhausen, w:ed December 11,1992

2. Simulator Facility Report

cc w/ encl.; w/o Attachments 1 and 2:

W. D. Romberg, Vice President - Nuclear Operations Services

C. H. Clement, Nuclear Unit Director

R. M. Kacich, Director, Nuclear Licensing -

D. O. Nordquist, Director of Quality Services

Gerald Garfield, Esquire

Nicholas Reynolds, Esquire

NRC Senior Resident inspector

State of Connecticut

cc w/ encl. and Attachments 1 and 2:

S. E. Scace, Vice President, Millstone Station

R. Stotts, Supervisor - Operator Training

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

OFFICIAL RECORD COPY G:MS3RQ.92

. - _ _ . _.

. -.

Mr. John F. Opeka 3

bec w/ encl.; w/o Attachments 1 and 2:

- Region 1 Docket Room (with concurrences)

R. Gallo, Chief, OLB, NRR

V. McCree, OEDO

V. Rooney, PM, NRR

L. Bettenhausen, DRS

J. Joyner, DRSS

R. Blough, DRP

L. Doerflein, DRP

G. Meyer, DRS

W. Raymond, SRI, Haddam Neck

P. Swetland, SRI, Millstone

P. Bissett, DRS

R. Bark 1cy, DRP

GL Facility File

DRS Files (1)

bec w/ encl. and Attachments 1 and 2:

Master Exam File

RI:DRS RI:DRS RI:DRS

Bissett/dmg h Bettenhausen

12/16/92

.A ff

UI / h/92

f12//d92

OFFICIAL RECORD COPY _ G:MS3RQ.92