m y.
P o2 s
.. y 5*
/
Common.ealth Edison 1
_. 2 1400 Opus Placs
..\\
b-Downers Grove, Illinois 60315 '
'~
c, kM f,
December 18, 1992
.'V I *,N
..'Or. Thomas E. Murley.
Office of Nuclear Reactor. Regulation US Nuclear Regulatory Commissr n s
Washington,-DC 20555 Attn:. Document Control Desk
Subject:
Byron Station Units -1 k 2 Braidwood Station Unit, 1 & 2 fire Protection Report - Amendment 15 NRC Doch t Nos. 50-451/455 and 50-456/451
Reference:
(a) August 16, 1982 T.R. Tramm letter to H.R. Denton r
Dear Dr. Murle.)
Reference'(a) provided the initial submitta' of the Byron and Braidwood Fire Protection Report-(FPR).
This letter provides Amendment 15 of tho FPR for.the NRC Staff review. Amendment 15 updates-the FPR to incorporate new and revised information applicable to the Byron and,Braidwood Stations.
These changes do not represent a decrease in the level of fire protection which requires prior NRC approval according to the following:
(a) Condition 2.C.6 of the Byron-Unit 1 Facility Oper&titig License, NPF-37; (b) Condition 2.E.of the Byron Unit 2 Facility Operating License, NPF-66; (c) Condition 2.E
~!q"j.
of the Braidwood' Unit 1 Facility Operating License, NPF-72; or'(d) Condition 2.E of the Braidwood Unit 2 Facility Operating License, NPF-77.
Amendment 15 includes changes _which reflect changes to the facil_ity and procedures =which were in effect as of June 18, 1991. Attachment A to this s
letter provides an itemized summary and explanation of all changes included.
Pursuant to 10 CFR 50.4(b>(6), one signed original and' ten (10) copies are being provided to the Document Contrel Desk, plus two (2) copies.to
-the NRC Region F office-and one (1) copy each to the Byron ar' Braldwood Resident Inspec : s offices.
Please address any questions concerning this matter to this office.
Very truly yours, M-T.H. Simpkin Nuclear Licensing Administrator cc:
J. Hickman-NRR
.R. Elliott-NRR B. Clayton-RIII Resident Inspector-Byron
./D
-Resident Inspector-Braldwood 9212280130 921P18
~
'PDR --ADOCK- 05000454 F
[
/
[)
ZNLDf667:gb:
i
/
rg/ID667::
1 g,
,~
u s.f V
Page No.'
~T 12/07/92 BYROtI/BRAIDWOOD
.]
FIPE PROTECTION REPORT CHANGE LOG Amendment 15 FDRP #
SECTION + PAGE DESCRIPTION OF CHANCE REASON /BJ. SIS REFEREhCES/ REMARK $
15-007 0-ix es Add cables 1VA821 and TVA823 to the safe shutdown technical conment Letter from A.C. Dickson to W.C. Maki (03-31-92.).
equipment and cables list. They had previously been inadvertantly omitted.15-007 0-xiv Be Add' cables 1VA821 and IVA823 to the safe shutdown technical coment Letter frre A.C. Dickson to W.C. Maki (03-31-92.) -
equipment and cables list. They had previously been inadvertantly omitted.14-001 02.02 19 88 Docunent the replacteent of Nitten smoke detectors modification M6-1-90-012, ECN 06-00094E with Fenwat heat detectors over reatcor coolant pups.14-006 02.02-19 BB Docunent the replacement of Nitten smoke detectors modification M6-2-90-012, ECN 06-00095E with Fenwat heat detectors over reactor coolant PW PS-15-011 02.02-19 es Reconcite dif ferences between the TPR ard the technicot' coment S&L Calc. No. ATD-0026, FDRP 15-008 i
combustible loading calculation.15-011 02.02-20 BB Reconcile differences between the FPR and the technical ccernent S&t. Calc. tJo. ATD-0026, FDAP 15-008 combustiblir toadir:g calculation.15-011
' fl.02-21 BB Reconcite differences between the FPR and the technical coment S&L Calc. No. ATD-0026, FDRP 15-005 combustible loading calculation.15-011 02.02-22 88 Reconcite differences between the FPR and the technical consent S&i. Catt. No. ATD-0026, FDRP 15-008 carbustible toading calculation.
w v
y.
~
Q; Page No.
2-12/07/92 L
SYRONIBRAIDWOOD I
jr FIRE PROTECTION REPORT CHANGE LOG (t
Amendnent 15
....~..........
I.
f FDRP #
SECTION + PAGE DESCRIPTION OF CHANGE REASON / BASIS REFERENCES / REMARKS q
15-011 02.02-23 BB Reconcite differences between the FPR and the technical coment
$&L Catc. No. ATD-0026, FDRP 15-008' q
coabustible leading calculation.15-011 02.02-24 BB Reconcile differences between the FPR and the technical coment ~
S&L Cate. No. AfD-0C26, FDRP 15-005 conbustible loading calculation.
t 15-011 02.02-25 EB Reconcite differences between the FPR and the technical consnent
$$L Cate. No. ATD-0026, FDRP 15-00P--
combustible loading calculation.15-011 02.02-26 BB Reconcite differences between the FPR and the technical coment
$4L Cate. No. ATD-0026,^ FORP 15-008 l'
combustible loading calculation.15-011 02.02-27 BB
'Reconcite differences between the FPR and the technical coment S&L Calc. No. ATD-0026, FDRP 15 008-conbustible loading calculation.15-011 02.02-2Sa B8 Reconcile dif ferences between the FPR and the technical coment S&L Cate. No. ATD-0026,' FDRP 15-008 conbustible toading calculation.15-011 02.02-28 BB Reconcile differences between the FPR and the technical coment S&L Calc. No. ATD-0026.FDRP 15-008 l
' combustible loading calculation.
l 15-011 02,02-29 68 Reconcile differences bEtween the FPR'and the technical comunent
$14, Cale. No. ATD-0026, FDRP '15-008 conbustible toading calculation.
i i
15-011 02.02-30 BB
- Reconcite. differences between the FPA and the-technical coment '
S&L-Cate.~No. ATD-0026,-FDRP^15-008 conbustible toading calculation.
4
'E t
~
m_
m-2 m.
m
a l'
t Pege No.
3' 12/0'7/92 BYRON / BRAID 1J000 FIRE PROTc 210N REPORT CHANCE LOG i '
Amendment 15
.FDRP #
SECTION + PAGE DESCRIPfl0N OF CHANGE REASON / BASIS REFERENCES / REMARKS
....................................a.............15-011 02.02-31 BB Reconcite differences between the FPR and the technical connent S&L Calc. No. ATD-0026, FDRP 15-008 conbustible loading calculation.
15 011 02.02-31a BB Reconcile dif ferences betwen the FPR and the technical conment S&L Calc. No.'ATD-0026, FDRP 15-005 combustible toading calculation.15-011 02.02-32 BB Reconcile differences between the FPR and the technical comment S&L Calc. No. ATD 0026, TDRP 15-008 combustible leading calculation.15-002 02.02-33 BB Reflect the fact that Fire rene 11.6C-0 no longer technical connent Teleconf rence with C. Kinsetta (03/31/92), seno, contains Anti-C clothing, from J. Schroeder to s. Raymond (05/20/92.)
15-011-
.02.02-33 88 Reconcite dif ferences between the FPR and the technical comment S&L Cate. No. AfD-0026, FDRP 15-008 conbustible toading calculation.15-002 02.02-33a BB Reflect the fact that Fire zone 11.6C-0 no longer technical connent Teleconfrence with G. Einsette (03/31/92), memo:
contains Anti C clothing.
from J. Schroeder to S. Rayimond (05/20/92.)15-011 02.02-33a 88 Reconelle differences between the FPR and the technical consnent S&L Calc. No. ATD-0026, FDRP.15 006 coabustible loading calculation.
'15-011 02.02-34 BB Reconcite differences between the FPR and the technical connent S&L Catc. No. ATD-0026, FORP 15-008 coerbustible loading calculation.15-011
,02.02-35 BB Reconcite differences between the FPR and the technical connent
$1L Catc. No. ATD-0026, FDRP 15-005 conbustible toading calculation.
x
~
'a
+
V.
5.'
5-
- Page No.
4 I.
12/07/92 I
BTRON/BRAIDWOOD FIRE PROTECTION REPORT CHANGE LOG Amendment 15 i
1l' FORP #
SECTION + PACE DESCRIPTION OF CHANGE REASON / BAS 15
. REFERENCES / REMARKS 4
15-011 02.02 36 88 Reconcile differences between the FPR and the technical coment S&L Calc. Nc. ATD-0026,'FDRP 15-008 i
combustible toading catcutation.
i i
14-019 02.02-37 BB Reflect the addition of cable insulation and sodification MCR 20-0-91-650, ECN 20-00230E, DC-CX-032, DIT -
l increased fire loading in the service building.
BR-EPED-0343 j
14-019 02.02-37a BB
' Reflect the addition of cable insulation and modification
. MCR 20-0-91-650, ECN 20-00230E, DC-CX-032, DIT '
increased fire toading in the service building.
BR-EPED-0343 15-011 02.02-37 B8 Reconcite differences between the FPR and the technical coment S&L Calc. No. ATD 0026, FDRP 15-008 combustible toading calculation.
2 15-011 02.02-37a 88 Reconcile uifferences between the FPR and the technical comment S&L Cale. No. ATD-0026, FDRP 15-008-conbustible loading calculation.
?15-011 02.02-38 B8 Reconcite differences betwien the FPR and the technical coerent S&L Catc. No. ATD-0026, FDRP.15-008 a
. combustible loading calcuta, tion.
i 15-011 02.02-39 as Reconcile differences between the FPR and the -
technical' coment S&L Calc. No. ATD-0026, FDRP 15-008 conbustible loading cateutation.
4 1
15-011 02.02-40 88 Recencite dif ferences between the FPR and the technical coment S&L Calc. No. AfD 0026, FDRP 15-008.
combustible loading calculation.
I:
15-011 02.02-41 88-Reconcile differences between the FPR and the l technical connent S&L Cate. No. ATD-0026, FDRP 15-008 combustible loading calculation.
i'
,?
i:
b J -
l
$1 i
e
's g-g y
y
, ~. -
r w
--.-.- =m 2.
-a
a I
f i
i i-
- Page No.
5 i.
12/07/92 i
BYRON /BRAIDWO(X) i FIRE PROTECTION REPORT CHANGE LOG Amentinent 15 4
FDRP #
SECTION + PAGE DESCRIPTION OF CHANGE REASON / BASIS REFERENCE 5/ REMARKS j
14-001 02.03-3 BB Document the replacement of Nittan smoke detectors modification M6-1-90-012, ECN 06-00094E with Fenwat heat detectors over reatcor coolant Pumps.14-006 02.03-3 88 Document the replacement or Nittan smoke detectors modification M6-2-90-012 ECM 06-00095E -
with Fenwat heat detectors over reactor coolant P@.15-011 02.03-10 BB Reconcile differences between the FPR and the technical coment S&L Calc. No. AfD 0026, FDRP 15-008 conbustible. loading calculation.15-011 02.03-12 BB Reconcile differences between the FPE and the technical coment S&L Calc. No. ATD-0026,' FDRP 15-008 cocbustible loading calculation.15-011 02.03-13 B9 Reconcite dif ferences between the FPR and the technical coment S&L Calc. No. ATD-0026, FDRP 15-006' conbustible loading calculation.15-011 02.03-16 sa Reconcite dif f erences between the FPR and the technical coninent '
S&L Cate. No. ATO-0026, FDRP 15-008-conbustible toading calculation.15-011 02.03-19 BB Reconcile differences between the FPR and the technical comment S&L Cate. No. ATD-0026,'FDRP 15-008 conbustible loading calculation.
~
15-011 02.03-20's8 Reconcile dif ferences between' the FPR and the technical comment ~
S&L Calc. No. ATD-0026, FORP 15-008
. combustible toading calculation.15-011 02.03-23 89 Reconcile differences between the FPR and the technical coment S&L Calc. No. ATD-0026; FDRP 15-008 conbustible loading calculation.
T L
- b i-s..
3
+
,.M.-
c
. _,,.-.,,2.__
m_,_____________
a
\\
J Q
Page No.
6 12/07/92 BTRON/BRAIDWDCC FIRE PROTECTION REPORT CHANGE LDG Amendoect 15 FDRP #
SECTION + PAGE DESCRIPTION OF CHANGE REASON / BASIS REFERENCES / REMARKS 15 011 02.03-26 Ba Reconcite differences between the FPR and the technical comment S&L Cate. No. ATD-0026, FDRP 15 008 combustible loading calculation.15-011 02.03-28 BB Reconcile dif ferences between the FPR and the technical comment S&L Calc. No. ATD-0026, FDRP 15-008 conbustible loading calculation.15-011 02.03-30 BB Reconcile differences between the FPR and the technical careent
$1L Calc. No. ATD-0026, FDRP 15-008 coribustible loading calculation.15-011 02.03-31 Ba Reconcite differences between the FPR and the technical comment S&L Calc. No. ATD-0026, FDRP 15-008 contustible loading calculation.
15 011 02.03-32 88 Reconclie differences between the FPR and the technical conynent S&L Cate. No. ATD-0026, FDRP 15-008 l
corrbustible tonding calculation.15-011 02,03-33 BB reconcile differences between the FPR and the technical cormient S&L Catc. No. ATD-0026, FDRP 15-008 corrburtible loading calculation.15-011 02.03-37 B8 Reconcile differences between the FPR and the technical cornrnent S&L Calc. No. ATD-0026, FDRP 15-006 cortustible loading calculation.15-011 02.03-39 Ba
. Reconcile dif ferwes between the FPR and the
- echnical cocinent -
S&L Cale. No. ATD-0026, FDRP 15-008 corbustible loading calculation.15-011 02.03-40 BB Reconcile differences between the FPR and the technical cocinent S&L Calc. W '*TD 0026, FDRP 15-008 cocbustible toading calculation.
a
(3 %.
y
+
h Y
e
~
4 Page No.
7
- 12/07/92 l
SYRON/BRAIDWOOD FIRE PROTECTION REPORT CHANGE LOG 4
Amersent 15 4.
A s
4 l
FDRP #
SECTION + PAGE DESCRIPTION OF CHANGE:
REASON / BASIS REFERENCES /RL4AEKS i
t 15-011 02.03-44 88 Reconcite differences between the FPR and the ~
technical comment S&L Calc. No. AfD 0026, FDRP 15-008 combustible loading calculation.
i I
15-011 02.03-45 sa Reconcile differences between the FPR and the technical corment S&L Cate. No. AfD-0026, FORP 15-008r
- corrtustible loading calculation.
i 15-011 02.03-46 Bs.
- Reconcite differences between the FPR and the technical coreent S&L Calc. No. ATD-0026,.FDRP.15-008 combustible loading calculation.
1 I
' 14-00381 02.03-47 88 Revise Fire Protection Report to doctrient a new redification M6-1-90 684, ECN 06-001435 raised floor in the Byron 1 computer room.
g d
15-011 02.03-47 BB Reconcile dif ferences between the FPR and the technical corment' S&L Cate. No. AfD 0026, FDRP 15-008
..j' combustible loading calculation.
14-00381 02.03-48 88 Revise Fire Protection Report to document a new
.nodification.
M6-1-90-684, ECW 06-001435 raised floor in the Byron 1 coeputer rom 15-011
-t,2.03-49 sa Reconcite differences between the FPR and the technical cornment S&L Calc. No. AfD-0026i FDRP 15-008.
contxastible loading calculation.
15-011-02.03-50 BB Reconcite differences between the FPR and the technical careent-
'S&L Calc. No. ATD-0026, FDRP 15-008 conbustible toading calculation.
' ~
i technical comment S&L Catc, No. ATO-0026i FDRP 15-008 15-011 02.03-52 88 Reconcite differences between the FPR and the
. conbustible loading calcutstion.
i 4
4 5
1
.-g.
c i6,y v
O Of x
i Page No.
S 12/07/92 STRON/SRAIDWOCO FIRE PROTECTION REPORT CHANGE LOG Amen *ent 15 1
1 FORP'#
SECTION + PAGE DESCRIPTION OF CHANGE REASON / BASIS REFERENCES /REMARKSL
+
15-011 02.03-55 88 Reconcile differences between the FPR and the technical connent
$1L Calc. No. ATD-0026,' FDRP 15-008 combustible 1oading catcutatlon.
>- t i
15-011 02.03-58 BB Reconcite differences between the FPR and the technical comment
$1L Cate. No. AfD-0026,. FDRP.15-008 combustible loading calculation.15-011 02.03-60 88 Reconcile differences between the FPR and the technical conment
- S&L Cate. No. AfD-0026, FDRP 15-008 combustible loading calculation.15-011 02.03-61 BB
' Reconcile differences between the FPR and the technical connent S&L Cate. No. ATD-0026, FDRP 15-003..
conbustible loading calculation.
4 i
15-011 02.03 62 88 Reconcite differences between the FPR and the technical comment
$1L Cate. No. AfD-0026, FORP 15-008
- conbustible tonding calculation.
4 i
i 15-011 02.03-65 BB.
Reconcile dif fererces between the FPR and the technical consnent.
S&L Cate. No. ATD-0026, FDRP 15-008 ;
combustible toading calculation.15-011 02.03-68 B8 Reconcite differences between the FPR and the
.techn cal conment S&L Calc. No. ATD-0026, FDRP 15-008 i
~crebustible toading calculation.15-011 02.03-69 BB-Reconcite differences between the FPR and the technical consent
- S&L Calc. No. ATD-0026,'FDRP 15-008 comt:ustible loading calculation.
15 011 02.03-71 BB-Reconcite differences between the FPR and the
- technical conenent S&L Calc. N% ATD-0026,.FDRP 15-008' ccebustible tcading calculation.
r e
i k
J L
\\
k 1
=
~-
=
E r y
.,+
m e
g m-e
?
+
t y e
d 64 u
i r+
I N
'Page No.
9, 12/07/92 BYRON /5RAIDWOOD FIRE PROTECTION REPORT CHANGE LOG t
i Amenonent 15-
{
I j
j 3
FDRP #
SECTION + PAGE DESCRIPTION OF CHANGE -
REASON /EASIS
. REFERENCES / REMARKS
[
i Reconcile differences between the FPR and the technical conenent S&L Calc. No. AfD-0026, FDRP 15-008 15-011-02.03-76 BB i'
carbustible loading calcu!ation.
l-15-011 02.03-77 88 Reconcile differences between the FPR and the technical coewent S&L Calc. No. AfD-0026, F?RP 15-008 -
conioustible loading calculation.15-011 02.03-80 88 Reconcite differee es between the FFR erd the technical conenent
$1L Calc. No. ATD-0026, FDRP 15-008 j
'cocbustible loading calculation.15-011 02.03-81'68 Reconcile differences latween the FPR and the technical coment S&L Calc. No. ATD 0026, FDRP 15-008 i
combustible loading calculation.
1
+
15-011 02.03-82 BB Reconcile differences between the FPR and the technical coment
$4L Cale. No. ATD-0026, FDRP 15-008
{
cortustible' loading calculation.
15 011 02.03-83 BB Reconcite differences betwen the FPR and the technical comment S&L Cate. No. AfD-002..tDRP 15-008 -
l costostible.toading calculation.15-011 02.03-84 Ba'
' Reconcite dif ferences between the FPR and the' technical consnent S&L Calc. No. ATD-0026, D RP 15-0082 coebustible leading calculation.
'15-011 02.03-85 BB Reconcile differences between the FPR and the technical consnent S&L Cate. No. ATC-0024, FDRP 15-008 cortustible loading calculation.
l 15-011 02.03-86 88' Reconcite dif ferences bet' ween the FPR ard the
-technical coscent-S&L Calc. No. AfD.0026, FDRP 15-008.
combustible loading calculation.
1 3.
4 9
w Y
j g
P y
p g.
w a'p.-
, j
s i
Page No.
10 12/07/92 BYRON /BRAIDWOG) l FIRE PROTECTION REPORT CHANGE LOG Amen +wnt 15 REASON / BASIS REFERENCES / REMARKS FDRP #
SECT!ON + PACE DESCRIPTION OF CHANGE l
Reconcile differences between the FPR and the technical comment
- s&L Catc. No. ATD-0026, FDRP 15-003 15-011 02.03 88 BB combustible loading calculation.
Reconcile dif f erences between the FPR and the technical coment S&L Cate. No. ATD-0026, FDRP 15-003 15-011 02.03-89 88 combustible toading calculation.
technical comment S&L Calc. nio. ATD-0026, FDRP 15-003 Reconcile dif ferences between the FPR and the 15-011 02.03-90 58 confustible loading calculation.
Peconcile differences between the FPR and the technical coment S&L Calc. No. ATD-0026, FDRP 15-008 15-011 02.03-91 BB contustible toading calculation.
Reconcite dif ferences between the FPR and the technical coment S&L Calc. No. ATD-0026, FDRP 15-005 15-011 02.03-92 83 conbustible toading calculation.
Reconcile dif ferences between the FPR and the technical coment S&L Cate. No. ATD-0026, FDRP 15-003 75-011 02 03-102 SS corbustible toading calculation.
Reconcile differences between the FPR and the technical coment S&L Cate. No. ATD-0026, FDRP 15-008 15-011 02.03-105 88 ccmbustible loading calculation.
Reconcite dif ferences between the FPR and the technical coment S&L Calc. No. ATO-0026, FORP 15-008 15-011 02.03-106 88 conbustible loading calculation.
Reconcite differences between the FPR and the technical coment S&L Calc. No. ATD-0026, FDRP 15-008 15-Off 02.03-108 88 coctustible loading calculation.
,1 - a r.h.
7 ;-
f.
- -m Pnge No.
11-i
~12/07/92 i
BYRON /BRAIDWOOD FIRE PROTECTION REPORT CHANGE LOG Ainenchnmt 15 5 '
fDRP #
SECTION + PAGE DESCRIPTION OF CHANGE REASON / BASIS REFERENCES / REMARKS 4
15-011 02.03-112 BB Reconcile dif ferencM between the FPR and the technical conenent S&L Calc. No. AfD-0026, FDRP 15-008 cornbustible. loading calculat f on.
15 011 02.03-115 B8 Reconcite differences between the FPR and the technical coment S&L Cate. No. ATD 0026, FDRP'15-008-combustible loading calculation.
l
'15-011 02.03-115a BB Reconcile dif ferences between the FPR and the technical consnent S&L'Cate. No. ATD-0026, FDRP 15-008
- conbustible Ioading catcutation.
i 1
15-011 02.03-117 88 Reconcile differences between the FPR and the technical consnent S&L Catc. No. ATO-0026,'FDRP.15-008 conQustible loading calculation.
.15-011 02.03 118 B8 Reconcite differences between the FPR and the technical consnent S&L Calc. No. ATD-0026) FDRP 15 000.'
combustible ;cading calculation.15-011 02.03-119 88 Reconcite differences between the FPR and the.
. technical coment S&L Calc. No. ATD-0026, FDRP 15-008 j
combustible toading calculation.
5 1
.1 -0 1 02.03-120 BB Reconcite dif ferences between the FPR and the -
technical conenent '
S&L Calc. No. ATO-0026, FDRP 15-008 combustible loading calculation.15-011 02.03-121 BB Reconcile differences between the FPR and the tedhnicalcomment
. S&L Calc. No. ATD-0026, FDRP 15-003
~
l' combustible ioading calcutation.15-011 02.03-122 BS Eeconcile differences between the FPR and the technical consnent S&L Calc. No. ATD-0026, FDRP 15-008 conbustible loading cateutation.
i '
4
^
b i
s i
t
v-
~
L----1-------2---=A---H 3
4 m
p, t.
l Page No.
12 12/07/92 BTRON/BRAIDWOOD FIRE PROTECTION REPORT CHANGE LOG I
Amerdnent 15 '
4 FDRP W SECTION + PAGE DESCRIPTION OF CHANGE REASON / BASIS REFERENCES / REMARKS'
~
..........-.......................................e 15-011 02.03-124 88 Reconcile differences between the FPR and the-technical conenent
' S&L Calc. No. ATD-0026, FDRP '15-008.
condmtible loading calculation.15-011 02.03-125 BB Reconcile differences between the FPR and the technical comunent S&L Calc. No. ATD-0026, FDRP 15-003' conbustible toading calculation.15-011 02.03'127 sa Reconcite differences between the FPR and the technical comunent S&L Calc. No. ATD-0026, FDRP 15-008' t
coc6ustible loading calculation.
Reconcile differences between the FPR and the technical coment S&L Catc. No. ATD-0026, FDRP 15-008 15-011 02.03-130 88 cocbustible toading calculation.15-011 02.03-132 BB Reconcile differences between the FPR and the technical comment S&L Calc. No. ATD-0026, FDRP 15-008 coerbus t i bl e ' t oading ca l cul a t i on.15-011 02.03 135 88 Reconcile differences between the FPR and the technical connent S&L Calc. No. ATD-0026, FDRP 15-003 4
contustible toading calculation.
.15-011 02.03-138 Ba Reconcite differences between the FPR and the
' technical comment S&L Cate. No. AfD-0026, FDRP.15-008
.. combustible'toading calculation.
1 15-011 02.03-1t.1 es Reconcile differences between the FPR and the
' technical coment S&L Cate.'No. AfD-0026, FDRP 15-008 conbustible loading' calculation.
1:
I 15-002
.02.03-142 BB Reflect'the fact that Fire zone 11,6C-0 no' tonger technice t. conenent Teleconfrence with G. Kinsella (03/31/92), mein contains Anti-C clothing.
from J. Schroeder to S. Raymond (05/20/92.)..
i 4-1.,
. j.
l I
k u
+i-4%
a-
-e 6
a
- y Page No.
13 12/07/92 SYRON/BRAIDWCA]D F!RE PROTECTION REPORT CHANGE LOG 1
A m t 15 f
FDRP #
SECTION + PAGE DESCRIPTION OF CHANGE REASON / BASIS
................' REFERENCES /REMARE:
S 1
.............~.........15-011 02.03-142 BB Reconcile differences between the FPR and the technical coment S&L Catc. No. ATD-0026,'FDRP 15-008 conbustible toading calculation.
Reconcile' ifferences between the FPR and the technical coment S&L Catc. No. ATD-0026, FDRP 15-008 d
15-011 02.03-145 BB conbustible loading calculation.15-011 02.03-146 BS-Reconcile differences between the FPR and the.
technical conenent S&L Cate. No. ATD-0026, FDRP 15-008 coebustible toading calculation.15-011 02.03-148 88 Reconcile differences between the FPR and the technical coment '
S&L Calc. No. ATD-0026, FDRP 15-008 conbustible loading calculation.15-011 02.03-150 88 Reconcite differences between the FPR ard the technical coment S&L Calc. No. ATD 0026, FDRP 15-008 conbustible loadinC calculation.15-011 02.03 153 BB Reconcite differences between the FPR and the technical comment S&L Calc No. ATD-0026, FDRP 15-008 i
- combustible toading calcutation.15-011 02.03-163 88-Reconcile differences between the FPR and the technical coment.
S&L Calc. No; ATD-0026, FCRP 15-008 combustible loading calculation.15-011 02.03-168 BB Reconcile differences between the FPR and the-technical coment S&L Calc. No. ATD-0026, FDRP 15-008,
i combustible loading calculation.15-011 02.03-169 BB Reconcite differences between the FFR and the technical coment S&L Catc. No. ATD-0026,,FDRP 15-008
?
conbustible loading calculation.
a J
d
~
I Page No.
14.
12/07/92 BYRON /SRAIDWOOD FIRE PROTECTION REPORT CHANGE LOG Amerdnent 15 FDRP W SECTION + PAGE DESCRIPTION OF CHANCE REASON / BASIS REFERENCES / REMARKS15-011 02.03-169a BB Reconcite differences between the FPR and the '
technical corrient S&L Catc. No. ATD-0026, FDRP 15-008 conbustible loading calculation.15-011 02.03-172 BB Reconcite differences between the FPR and the technical comment S&L Calc. No. ATD-0026, FDRP'15-008 combustible loading calculation.15-011 02.03-173 BS.
Reconcite differences between the FPR and the technical conenent S&L Calc. No. ATD.0026,.FDRP 15-008 combustible loading cateutation.
4 15-011 02.03-174 BB Reconcite differences between the FPR and the technical corrnent
$$L Cate. No. ATD-0026, FDRP i5-00$
combustible loading calculation.15-011 02.03-175 Ba Reconcile differences between the FPR and the technical comment S&L Calc. No. AfD-0026, FDRP 15-008
. contustible toading calculation.
i 15-011 02.03 177 BB.
Reconcile dif ferences between the FPR and the technical comment S&L Cate. No. ATD-0026, FDRP 15 003 contustible toading calculation.14-019 02.03-175 BB
. Reflect the addition of cable insulation and.
modification-MCR 20-0-91 650,'ECW 20-00230E, DC-CX-032, DtT increased fire loading in the service building.
BR-EPED-0343 011 02.03-178 BB Reconcite differences between the FPR and the technical coment '
S&L Catc. No.'ATD-0026, FDRP 15-008 -
conbustible loading calculation.
'14-019 02.03-180 BB-Reflect the' addition of cable insulation and modification MCR 20-0-91-650, ECW 20-00230E, DC-CX-032, DIT '
increased fire loading in the service building.
BR-EPED-0343 4
4 1
4 I
=
=
Page No.
15 12/07/92 BYR004/BRAIDWOOD FIRE PROTECTION REPORT CHANGE LOG Anendwnt 15 l
FDRP #
SECTION + PAGE DESCRIPTION OF CHANGE REASON / BASIS REFERENCES / REMARKS i
. 02.03 ' 3 BB Reconcite dif ferences between the FPR arxi the technical convent
$1L Catc. No.- ATD-0026,' FDRP 15-008 15-011 i
carbustible loading calcutation.
a
.' $4L Calc. No. ATD-0026, FDRP 15-008.15-011 02.03-180a BB
- Reconcite differences between the FPE and the
' technical comment-conbustible toading calculation.14-019 02.03-180a BB '
-Reflect the addition of cable insulation and modification
- MCR 20 0-91-650, ECE 20-00230E, DC-CX-032, DIT
-increased fire loading in the service building.
BR-EPED-0343 14 019 02.03-181 BB Reflect the addition of cable insulation and modification MCR 20-0-91-650, ECW 20-00230E, DC-CX-032,' DIT.
increased fire loading in the service building.
BR-EPED-0343'15-011' 02.03-181 BB Reconcite differences between the FPR and the technical consnent S&L Calc. No. ATD-002.6, FDRP.15-008 conbustible toading calculation.15-011 02.03-182 BB-Reconcile differences between the fPR and the
. technical.conenent SAL Calc. No. ATD-0026, FDRP 15-008 cenbustible loading calculation.14-011 02.03-182 BB Reflect.the addition of cable insutetion and modification MCR 20-0-91-650, ECN 20-00230E, DC-CX-032, DIT increased fire loading in the servic2 building.
BR-EPED-0343'
'15-011 02.03-186 B8 Reconcile differences between the FPR and the technical comment S&L Cate. No. ATD-0026, FORP 15-008..
ceebustible loading calculation.
15-01'
- 02.03-107 BB
' Reconcite differences between the FPR and the technical comment S&L Catt. No. ATD-0026, FDRP 15-008
.- conbustible loading calculationa b
t g
N g
p-
+
- ' yh
- g N
L J
P6ge No.
16
- 12/07/92 BYRON /BRAIDWOOD l
FIRE PROTECTION REPORT CHANGE LOG Amerxinent 15 4
FDRP +:
SECTION + PAGE DESCRIPfl0N OF CHANGE REASON / BASIS REFERENCES / REMARKS i
tv 011 02.03-188 98 Reconcile dif ferences between the FPR and the technical corrnent S&L Calc. No. ATD-0026, FDRP 15-008 contustible loading calculation.15-011 02.03-190 BB neconcile dif ferences between the FPR ard the
. technical coment S&L Calc. No. ATD-0026, FDRP.15-008 conbustible leading calculation.
r 15-011 02.03-191 Bs.
Reconcile differences between the FPR and the technical coment S&L Calc. No. ATO-0026,' FDRP.15-008 combustible loading calculation.15-011 02.03-193 BS Reconcile dif ferences between the FPR and the technical coment S&L Calc. No. ATD-0026, FDRP 15-008.-
contostible loading calculation.15-011 02.03-194 88 Reconcite differences between the FPR and the technical coment S&L Calc. No.'ATD-0026, FDRP 15-008 -
combustible toeding calculation.
i i
15-011 02.03-200 98
' Reconcile dif ferences between the FPR and the technical coment S&L Catc. No. ATD-0026, FDRP 15-008I combustible loading calculation.15-011 02.03-203 88 Reconcite differences between the FPR and the technical comment S&L Calc. No. ATD-0026, FDRP 15-008 conbustible loading calculation.15-011 02.03-205 BB Reconcile differences between the FPR and the technical coment S&L Calc. No. ATD-0026,'r0RP 15-008' conbustible toading calculation.
e 15-011 02.03-208 Ba Reconcile differences between the FPR and the technical coment S&L Calc. No. AfD-0026, FDRP 15-008 4-corbustible losding calculation.
1 f
4 1
?.
i 1
w r
=-
-nv v
e rv +'
~
(
~1 9-i
!~
g LPage No.
17-12/11/92 BYRON /BRAIDWOOD FIRE PROTECTION REPORT CHANGE LOG' Amendnent 15 -
I l
FDRP *
'SECTION + PAGE DESCRIPTION OF CHANGE REASON / BASIS REFERrNCES/ REMARK $
t-
................a l
15-011 02.03-212 sa Reconcity dif fererv.es between the FPR and the technical coment S&L Calc. No. AID-0026, FDRP 15-008 -
ccebustible toading calculation.
a I'15-011 02.03-213 sa Reconcite differences between the FPR and the technical coment S&L Calc. No. ATO-0026, FDRP 15-003
{'
cortvstible loading calculation.14-028 02.03-F2 BR Change the plant d'velopnent figure to show the editoriat 10CFR50.59 screening, Dwg. M-3.
j current configuation of plant outer areas.
t
- 11. 023 02.03-18 sht 1 B8 Choa the correct zone rasnber on figure 2.3-8.
editorial j,14-017 02.03-F11 BB Revision of fire barrier description for Fire Zone modification M20-1-89-026, OIT BR-EFED-0319,'
11.5A-7, text end figures (color ecded figures a
[
incorporated in A:neminent 15).14-017 02.03-F12 sht 1 Ba Revision of fire barrier description for Fire' Zone modification M20-1-89-026, DIT BR-EPED-0319
- 11.5A.1, text end figures'(color coded figures incorpersted in Amendnent 15).
4
}'14-017 02.03-F12 sht 3 88 Revision of fire barrier descrip fon for Fire Zone modification M20-1-89-026,' DIT BR-EPED-0319'.
11.5A-1, tart and figures-(color coded figures' 1
incorporat M in Amende nt 15).
3-i 14-017 02.03-F13 sht 1.88
' Revision of fire barrier description for Fire Zone '.nodification.
M20-1-89 026, DIT BR-EFED-0319'
}[ ~
11.5A-1, text and figures (color coded. figures
-incorporated in Amerdnent 15),
i 5-1 4
t a-
- ~
~
t' l
p V
4 Page ko.
18 i
^
12/07/92 BYRCX/BRAIDWOOD FIRE PROTECTION. PORT CHANGE LOG Amendment 15 f
FDRP #
SECTiON + PAGE DESCRIPTION OF CHANGE REASOM/BAsl$
REFERENCES / REMARKS 14-004A2 02.03-F13 sht 2 BB Revise Fig. 2.3-13 SH.2 of 2 to reflect removat of modification M20-2-88-088, SECN S-559 (BR2 ELEC) casonary wall ' at Cotum "N", Row "28* elev.
SECM s-562 (BR2 sTRUCT) 383'-0". (Wati has been removed.)
14 00482 02.03-F13 sht 2 B8 Revise Fig.' 2.3-13 SH 2 of 2 to reflect the modification M6-2 89-001, PECN P-1315 (BY2 ELECT),;PECM P-1384 removat of the masonry wall at coltann "N",
Row (8Y2 STRUCT)
"28a elev. 383'-0".
14 017 02.03-F14 sht 1 BB
' Revision of fire barrier erscription for Fire Zone modification M20-1-89-026, DIT BR-EPED-0319 ~
11.5A-1, : ext and figures (color coded figures incorporuted in Anenchent 15).14-017 02.03-F14 sht 3 BB Revision of fire barrier description for Fire Zone modification M20-1-89-026, DIT BR-EPED-0319 11.5A-1, text and figures (color coded figures incorporated in Amenchent 15).14-025 02.03-F18 BB
- Revise the Radweste Service Building Conplex technical cornment 10CFR50.59 safety Evaluation-
- Drawing (Figure 2.3-18, sheet 1) to reflect the
-current configuratfon.15-007 02.04-23 BY1 Add cables'1vA821 e-d IVA823 to the safe shutdown technical conrnent -
Letter from A.C. Dickson to W.C. M.ki (03-31-92.)
equipment and cables list. They had previously been inadvertantty omitted.15-007 02.c',-23a sT1 Add cables tvA821 and 1vA823 to the safe shutdown technical coment Letter from A.C. Dicitson to W.C. Maki (03-31-92.) '
j equipment-and cables list. !They had previously j
been inadvertently omitted.
(-
- r
)
1
+
d 4
y h e-g y
y
% - a-p r
w3 4-
- -4
~ {m j-
~,
):
Fage ho.
19 BYRON /BRAIDWOCO FIRE PROTECTION REPORT CHANGE LOG Amendnent 15 h
FORP #
SECTION + PAGE DESCRIPTION OF CHANGE REASON / BASIS
' REFERENCES / REMARKS15-007 C2.04-72 871 Add cables 1VA821 and 1VA823 to the safe shutdown technical ccreent Letter from A.C. Dickson to W.C. Maki (03-31-92.)'
equipment and cables list. They bad previously been inadvertantly omitted.15-007 "12.04-219e BY1 Add cables IVA821 and IVA823 to the safe shutde n technical cornent Letto frora A.C. Dickson to W.C. Maki (03-31-92.)
equipment and cables list. They had previously been inadvertantly omitted.14-016 02.04-8a BR2 Reflect the upgrading of the indicators on the RHR modification M20-2-89-023, DIT BR-EPED-0326-1, DC-RH-047, ECN '
HK outlet terrperature instrunent tooos.
20-0052E 14-016 02.04-11 BR2 Reflect the upgrading of the indicators on the RHR modification M20-L S9-023, Dif BR EPED-0326-1, DC-RH-047, ECN ;
. HX outlet tenperature Instrument loops.
20-0052E 14-016 02.04-25 BR2 Reflect the upgrading of the indicators on the RHR modificatiun M20-2-89-023, DIT BR-EFED-0326-1, DC-RN-047, ECN HX outlet.tenperature Instrunent loops.
20-0052E 14-016 02.04-52 BR2 Reflect the upgrading of the indicators on the RHR modification M20 2-89-023, DIT BR-EPED-0326-1, DC-RM-047, ECM,
HX outlet temperature instrunent loops.
20-0052E 4
14-016 02.04-53a Ba2 Reflect the upgrading of the indicators on the RHR' modification' M20-2-89-023, DIT BR-EPED-0326-1, DC-RM-047 ECW 4
HX outlet,tenperature instrument loops.
20-0052E 016 02.04-53c BR2 Reflect the upgrading of the indicators on the RHR modification
. M20-2-89-023, Dif BR-EPED-0326-1, DC-RM-047, ECN
. HX outlet temerature instrument loops.
20-0052E a
14-016.
02.04 53e BR2 Reflect the upgrading of the indicators on the RNR modification M20-2-89-023, DIT BR-EPED-0326-1, DC-RM-047, ECW HX outlet teeperature instruent loops.
20-0052E 4
0 t
+
v
- . p dN.
!Page No.-
20 12/07/92>
BYROW/BRAIDWOOD FIRE PROTECTa0N REPORT CHANGE LOG Amer *ent 15 i
- i. -
FDRP #
SECT 10N + PAGE DESCRIPTION OF CHANGE REASON / BASIS REFERENCES / REMARKS' i-14-016 02.04-53f BR2 Reflect the tpgrading of the indicators on the RNR modification b20-2-89-023, DIT BR-EPED-0326-1, DC-RN-047, ECN._
- HX outlet tenperature lostrument loops.
20-0052E 14-016 02.04-53g SR2 Reflect the upgrading of the indicators on the RNR modif' cation M20-2-89-0Z3, DIT BR-EPED-0326-1, DC-RH-047, ECW U-HX outlet tenperature instruaent loops.
20-0052E 14-016 02.04-53h BR2'.
Reflect the upgrading of the indicators on the RHR modification M20-2-89-023, DIT BR-EPED-0326-1, DC-RM-047,' ECW
- HX outlet' tenperature instrunent loops.
20-0052E 14-016 02.04-53t BR2 Reflect the upgrading of the indicators on the RHR modification M20-2-89-023, DIT BR-EPED-0326-1, DC-RM-047, ECW.
HX outlet temperature instrument loops.
20-0052E 14-016 02.04-53r BR2 Reflect the upgrading of the irdicators on the RHR modification M20-2-89-023, DIT BR-EPED-0326-1, DC-RH-047, ECN -
HX outlet temperature instrument loops.
20-0052E 14-016
.02.04-59 BR2 Reflect the upgrading of the indicators on the RHR modification M20-2-89-023, DIT SR-EPED-0326-1, DC-RM-047," ECN -.
i HX outlet tenperature instrunent loops.
20-0052E 14-016 02.04-65 BR2
.. Reflect the upgrading of the indicators on the RNR modification M20-2-89-023, DIT BR-EPED-0326-1,' DC-RN-047, ECM-HX outlet tenperature instrument.toops.
20-0052E 14-016 02.04-72 BR2 Reflect the upgrading of the indicators on the RHR.
modification.
M20-2-89-023, DiT SR-EPED-0326-1, DC-RM-0474 ECN
. HX outlet' temperature instrument loops. 0052E 14-016 02.04-75 BR2 Reflect the upgrading of the indicators on the RHR~
modification M20-2-89-023, DIT BR-EPED-0326-1,'DC-RN-047, ECNE HX outlet temperature instrument loops.
20-0052E 4
.p w-&-r g-l k w-9 e
rm.,
~
~ V ;-
i Page No.
21 12/07/92 BTRON/BRAletAXX)
FIRE PROTECTION REPORT CMANGE LOG Amendnent 15 i
{.
FDRP #
SECTION + PAGE DESCRIPTION OF CHANGE REASON / BASIS REFERENCE 3/REMARits 14-G16 02.04-79 BR2 Reflect the upgrading of the indicators on the RNR modification M20-2-89-023, DIT'BR-EPED-0326-1, DC-RM-047. ECN t
HX outiet tec5erature instrument Ioops.
20-0052E 14-016 02.04-81 ea2 Reflect the upgrading of the indicators on the RHR modification M20-2-89-023, DIT BR-EPED-0326-1,' DC-RW-047, ECN HX outlet temperature instrument loops.
20-0052E 14-016 02.04-120 BR2 Reflect the upgrading of the indicators on ne FWR modification M20-2-89-023 Dlf BR-EPED-0326-1, DC-RH-047, ECN HX outlet tecperature instrument loops.
20-0052E 14-016 02.04-138 822 Reflect the upgrading of the indicators on the RNR wodification M20-2-89-023, DIT BR-EPED-0326-1, DC-RM-047, ECW -
HX outlet tenperature instrument loops.
20-0052E 14-016 02.04-160 BR2 Reflect the upgrading of the indicators on the RMR modification M20-2-89-023, Dit BR-EPED-0326-14 DC-RM-047, ECW HX outlet teeperature instrtraent toops.
20-0052E 14-016 02.04-164 BR2 Reflect the tpgrading of the indicators on the RNR modification M20-2-89-023, DIT BR-EPED-0326-1, DC-RN-047, ECN HX outlet t=-s--faure instrument loops.
20-0052E 4
14-016 02.04 167 BR2
^
Reflect the upgrading of the indicators on the RHR nodification M20-2-89-023, DIT BR-EPED-0326-1, DC-RM-047, ECM hX outlet tepperature instrument loops.
20-0052E'
~
14-016 02.04-172 BR2-
-Reflect the upgrading of the indicators on the RNR modificatico
. M20-2-89-023, DIT BR-EPED-0326-1, DC-RM-047, ECM L i'
HX outlet tenperature instrwent loops.
20-0052E
~
14-016 02.04-174 BR2 Reflect the tegrading' of the indicators on the RFR nodification H20-2-89-023, Dif.84-EPED-0326-1, DC-RH-047, ECW HX outlet teeperature instrument toops.
20-0052E -
4 4
4 4
,~
~.
c-
<s r
('
(vY 1
Page No.
22 12/07/92 BYRON /BRAIDWOOD
. FIRE PROTECTION REPORT CHANGE LOG Amenchent 15 3
FDRP #
SECTION.+ PACE DESCRIPTION OF CHANGE REASON / BAS]S REFERENCES / REMARKS-
~
14-008 03-11 BY1 Reflect the addition of an WFPA Code deviatico.
exfification M6-2-90-697, ECM 06-00147M
~ Fire Zones 8.3-2 & 8.5-2 do not meet 13-1989 i.
4-4.18 proximity. requirements, Wt structural steet shields sprinkter heads.14-008 03-11a BY1 Reflect the addition of an WFPA Code deviation.~
' modification M6-2-90-697, ECW 06-00147M Fire Zones 8.3-2 & 8.5-2 do not meet 13-1989 4-4.18 proximity requirements, k t structurat steet shields sprinkler heads.14-005 03-12 BY1 Reflect.the addition of an WFPA Code deviation, modification M6-2-90-697, ECN 06-00147H Fire Zones 8.3-2 & 8.5-2 do not meet 13-1989 4-4.18 proximity requirecents, but structural steet' shields sprinkter heads.14-005 03-13 BY1 Reftect the addition of en'hFPA Code deviation.
modification M6-2-90-697, ECN 06-00147M Fire Zones 8.3 2 & 8.5-2 do not meet 13-1989 4-4.18 proximity requirements, but structural steet shields sprinkler heads.14-001 03.07-1 BY.
Docunent the replacement of Nitten sacke detectors modification M6-1-90-012, ECM 06-00094E
[.
with Fenwat heat cetectors over reatcor coolant
. purps.14-006 03.07-1 BY Docunent the replacement of. Nittan smoke detectors modificati m M6-2-90-012. Ecu 06-00095E.
1 with Fenwat' heat detectors over reactor coolant 4
pumps.
g
' er'
's t
e r
a
.p J
V r'
4 h
Page No.
- 23 12/07/92 4
BYROW/BRAIDWOOD l
FIRE PROTECTION REPORT CHANGE LOG Amencarent 15 t'
FDRP W SECTION + PACE DESCRIPTION OF CHANGE REASON / BASIS REFERENCES / REMARK $.
i 14-00381 03.07 8 SY Revise Fire Protection Report to document a new modification M6-1-90-684, ECN 06-001435 raised floor in the Byron 1 cormuter room.14-001 AS.04-17 GB cocunent the replacement of Nitten smoke detectors acdification M6-1-90-012, ECN 06-00094E' 4'
with Fenwat heat detectors over reatcor coolant PtJT's.14-006 A5.04-17 BB Document the replacement of Nitten smoke detectors endification M6-2-90-012, ECW 06-00095E with Fenwat heat detectors over reactor coolant pts'ps,
t 2'15-001 A5.07-15 88 Revise the FPR to reflect the fact that the editorial' Radwaste Foreman is the Fire Brigade Leader.14-006 A5.05.27-1 BY2 Document the replacement of Nittan snoke detectors' modification M6-2-90-012, ECM 06-00095E with Fenwat heat detectors over reactor coolant pups.14-001 AS.08.30-1 BY1 Docunent the replacement of Nittan smoka detectors modification M6-1-90-012 ECM 06-00094E with Fenwat heat detectors over reatcor coolant W-15-020 M-52 sht-1 BR.
Docunent the annual figure review per PI-88-526.
modification' sargent & 'Ltrufy Interactive Drawing systee (SLIDS) ^
~
e T
A f
- . A-.
~
<