Text
l
,'
- ' . .
5#"4
UNITED STATES
. , .
yx
' ';
NUCLEAR REGULATORY COMMISSION
$
. ,U
REGION IV
$,.
.
,8
ARLINGTON, TEXAS 70011
'
611 RYAN PLAZA oRIVE, SUITE 1000
%,
DEC l 81992
Docket:
50-285
r
License:
Omaha Public Power District
ATTN:
W. G. Gates, Division Manager
Nuclear Operations
444 South 16th Street Mall
Mail Stop BE/EP4
Omaha, Nebraska 68102/2247
Gentlemen:
SUBJECT: NRC INSPECTION REPORT 50-285/92-25
This refers to the inspection conducted by Mr. L. E. E11ershaw, and the
inspectors identified in the attached report, of this of_fice on September 28
through October 2, and a subsequent technical meeting conducted on October 28,
1992, to discuss high energy line break considerations as related to auxiliary
steam piping. The inspection included a review of activities acthorized for
your Fort Calhoun Station facility. At the conclusion of the onsite
inspection on October 2,1992, and at the technical meeting held in our office
on October 28, 1992, the inspection findings were discussed with you and those
members or your staff as identified in the enclosed report.
Areas examined during the inspection and the topics discussed during the
October 28, 1992, meeting are identified in the report. Within these areas,
the inspection consisted of selective examination of procedures and
representative records, interviews with personnel, and observation of
activities in progress.
l
Within the scope of this inspection, no violations or deviations were
identified.
L
In accordance with 10 CFR Part 2.790 af the NRC's " Rules of Practice," a copy
of this letter and its enclosure will be placed in the NRC's Public Document
Room.
Should you have any questions concerning this inspection, we will be pleased
l
to discuss them with you.
Sincerely,
9212280106-921218
hd
ADOCK 0500
5
$DR
. Bill Beach, Director
,
l
Division of Reactor Projects
Enclosure:
(see next page)
/
J
v
.
.
.
.
Omaha Public Power District
-2-
Appendix - NRC Inspection Report
50-285/92-25 w/ attachments-
cc w/ Enclosure:
LeBoeuf, Lamb, Leiby & MacRae
ATTN:
Harry H. Voigt, Esq.
1875 Connecticut Avenue, NW
Washington, D.C.-
20009-5728
Washington County Board
of Supervisors
ATIN: Jack Jensen, Chairman
Blair, Nebraska 68008
Combustion Engineering, Inc.
ATIN:
Charles B. Drinkman, Manager
Washington Nuclear Operations
12300 Twinbrook Parkway, Suite 330
Rockville, Maryland 20852
Nebraska Department of Health
ATIN:
Harold Borchert, Director
Division of Radiological Health
301 Centennial Hill, South
,-
P.O. Box 95007
Lincoln, Nebraska- 68509-5007
Fort Calhoun Station
ATTH:
T. L. Patterson, Manager
P.O. Box 399
Fort Calhoun, Nebraska 68023
1
o
.
!
Omaha PLblic Fower District
-3-
NRC Inspection Report 50-285/92-25
bec to DMB (IE01) - DRS and DRP
bec distrib. by RIV:
J. L. Milhoan
Resident Inspector
DRSS-FIPS
Section Chief (DRP/C)
MIS System
RIV File
RSTS Operator
Project Engineer (DRP/C)
Lisa Shea, RM/ALF, MS: HNBB 4503
Section Chief (DRP/TSS)
Senior Resident Inspector - Cooper
Senior Resident Inspector - River Bend
L. Ellershaw
I. Barnes
M. Runyan
R. Azua
l
RIV:MQPS:RI*
RI:PSS*
RI:PSC:DRP*
C:MQPS'
EC /Tb
LE11ershaw/lb
MRunyan
RAzua
IBarnes
GSNh
11/16/92
'11/16/92
11/18/92
11/19/92
\\ M /92'
!
00:D %
DCherlain'
Abach
kT9[
S/6/92
/
- Previously concurred
<