Discusses Reasons for Postponement of re-examination of Licensed Personnel at Facility.Startup Date Has Been Indefinitely Postponed Making Testing Premature.Util Will Probably Contest Decision
ML20126C874
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/27/1980
From: Collins P
Office of Nuclear Reactor Regulation
To: Ross D
Office of Nuclear Reactor Regulation
References
NUDOCS 8004100420
Download: ML20126C874 (2)


Text

. _. _

MAM

1

~i a

MAR 2 71999

.j Ug au

i.

=a S

)

!!E'iORAtlDuti FOR:

D. F. Ross, Jr., Acting Director, Division of Project y

fianagement ji FR0f t:

P. F. Collins, Chief, Operator Licensing Branch, Division

,y of project Management

=a THRU:

D. J. Skovholt, Assistant Director Ouality Assurance and

h Operations, Division of project Management 5

SINECT:

OPERATOR LICEilSING EXAMIllATIDNS AT TMI-1 j:)

As part of the flRC Order dated August 9,1U0, we have required all T!II-1 i

licensed personnel to receive auanented training and undergo reexamination, ij Ue have intended to administer these exaninations in accordance with the

~h tine sequence established for cold (procritical) facilities. flomally,

'or these facilities, we schedule the written exanination six weeks prior to the projected fuel loading date and the operating test two weeks prior I

to the projected fuel loading date. Accordinoly, when the TMI-1 restart 4

date was projected as June 1,19M we aareed to conduct written examinations durina the week of April 28,19m and operating tests during May.

=j:,i

!ij Ue have since reviewed the Tril-1 restart schedule and have detemined that

"'1 the startup date will extend well beyond June 1,1980.

In fact, fiet-Ed feels a January 1,1981 startup date is optimistic. Additionally, scne facility design chanaes have not been installed and nany emergency pro-E" cedures reauire further revision.

Lono tem Eneroency Plan requirements have also not been implemented. Therefore, conduct of the reexaminations M;

at Tl1I-1 at this time appears to be prenature. We feel that a more appropriate examination and a more effective use of nanpower would be

=

E achieved by postponing the examinations until a fim startup date can be detemined. This postponenent will also preclude the need for a second J

set of examinations should the restart of TMI-1 be delayed considerably.

'"~

He intend to notify Met-Ed of our decision to postpone the Ti1I-1 reexam-inations indefinitely, pending detemination of a fim TMI-1 restart date.

The written and oral examinations will be scheduled six and two weeks, respectively, prior to this date. We expect Met-Ed nanagement to contest

=

our decision, based primarily on personnel concerns. !!et-Ed has previously indicated that morale problems would develop if the exaninations were not niven in the near future. He have been lv? to believe, however, that norale would not be adversely affected.

This is because operating personnel i

1 1

.t i

l l8L064Mk0Qo$

(

G:.

m d

feel that a second exanination would be.necessary due to a prolonged

__r shutdown. fiost operators prefer to take _only one examination, sched-uled close to the expected restart date.

The rurpose of this menorandum is to inform you of our reasons for decidina to postpone the THI-1 examinations and the potential for further discussion with Met Ed on the subject.

Please advise if you

m...

desire further clarification.

W Paul F. Collins Chief Operator Licensino Branch

=.9 Division of Project Management

,e cc:

S. Hanauer

.s:s...

2' V. Moore H

d

i DISTRIBUTION:

OLB R/F y

OLB F/F BA Bocer JJ Holman PF Collins DJ Skovholt 0A0 R/F PDR LPDR

. q tlSIC TERA '
.=:

s.

=9 2

h;::

,nA gpu

..TL'B:.DP.M...... 0lS.:. P/$ I'.

.l/

.[....ADQ

(

a orr=

  • B...B..o..n. e r. J..m. b...

..gy.......

i. ns.

DJ lt xp

...?!.fl.09....

..#. 4.@..

3FZ/.SO..

..E... 9...

y om*

4 J

mc mm m w.m um -

g; E

z:

~ ' l.

., _. -.