Text
-
- k 9
TOLEDO Docket No. 50-346 EDISON License No. NPF-3 RICHARD P. CROUSE vc. pre Serial No. 1-534 w
[419}243 5221 June 5, 1985 Mr. James G. Keppler, Regional Administrator United States Nuclear -Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137
Dear Mr. Keppler:
Confirmatory Action Letter (CAL) 85-03 (Log No. 1-1154) concerning the
. Davis-Besse. Nuclear Power Station Unit No. 1 Auxiliary Feedwater Pump Turbine Steam Supply (AFPTSS) piping system, was issued by your office on April 26, 1985. As a result of discussions between Toledo Edison and your Staff, it was determined that under CAL 85-03 Item No. 5, a written -
report will be provided to Region III on any defects found on pipe supports and pipe support components of the AFPTSS system following actuation of the auxiliary feedwater (AFW) system. Accordingly, enclosed is a report summarizing the recently observed defects as compared to the previously conducted baseline inspection.
Very truly yours, RPC:DRW:lah enclosure cc: DB-1 NRC Resident Inspector D. Danielson, NRC Region III I. N. Jackiw, NRC Region III 85061 g k [
346 S
l THE TOLEDO EDISON COMPANY EOISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652
!k 1134
- p.,
-TOLEDO EDISON-DAVIS-BESSE NUCLEAR POWER STATION UNIT NO. 1 AUXILIARY FEEDWATER PUMP TURBINE-STEAM SUPPLY PIPING-TRAIN NO. 1-1 REPORT Hanger Type Baseline Ir.spection. Condition.
Observed Condition Ref end Number (Completed May 10, 1985)
(June 2, 1985)
NCR No.
Comments.
Rigid No reported fire proofing Fire proofing damage.
85-0089 AFW system actuated as a result of 3A-EBD-19-H154
- damage, plant trip on June 2, 1985.
o TOLEDO EDISON DAVIS-BESSE NUCLEAR POWER STATION UNIT NO. 1 AUXILIARY FEEDWATER PUMP-TURBINE STEAM SUPPLY PIPING TRAIN NO. 1-2 REPORT.
H:nger Type Baseline Inspection Condition
' Observed' Condition Ref end Number (Completed May 21, 1985)'
(June 2, 1985)
NCR No.
Comments
. Rigid Jam nut tight on sway strut.
Loose jam nut on 85-0088 AW system actuated as a result of 3A-EBD-20-H1 sway strut.
plant trip on June 2, 1985.
Rigid No reported fire proofing Fire proofing damage. 85-0089 AFw' system actuated as a result of 3A-EBD-20-H1 damage.
plant trip on June 2, 1985.
l