ML20126C323

From kanterella
Jump to navigation Jump to search
Forwards Util Responses to Interrogatories 9-22 Through 9-30,9-38,9-42 & Supporting Documents (NUS Corp Engineering Studies).Proprietary Matl Used in Part to Answer Interrogatory 9-29 Has Been Deleted
ML20126C323
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 03/21/1980
From: Gallo J
ISHAM, LINCOLN & BEALE
To: Jordan W
SHELDON, HARMON & WEISS
Shared Package
ML20126C326 List:
References
NUDOCS 8003310123
Download: ML20126C323 (2)


Text

I

. l ISHAM, LINCOLN & BEALE COUNSELORS A7 LAW H2O CONN CTICU T AV E NUC. N.W-WASHINOTON, D. C. 20036 TCLCPHONC 20t*833 9730 cm,cano orr,cg I ON E Fl#51 N ATIONAL PLA Z A FOR rv SECONO ,600R I

CHICAGO,swLINois 60003 j Tr.wC PMONC 3 J - 698

  • 7500 TELCx:2 52SS l March P., 1980 l

l l

l Wi111am S. Jordan, III, Esquire  !

Jheldon, Harmon & Weiss 1725 I Street, N.W.

Suite 506 Washington, D.C. 20006 )

1 Re: In the Matter of Consumers Power Company l (Big Rock Point Nuclear Power Plant)

Docket No. 50-155

Dear Bill:

I am enclosing Consumers Power Company's responses to Interrogatories 9-22 through 9-30, 9-38 and 9-42, together with the documents indicated to be enclosed. This submission completes the "nine" series of interrogatories except for the ones concerning the Big Rock Point emer-gency plan. I expect to have the answers to the "three" series of interrogatories available by the end of the month.

The answers to the emergency plan interrogatories will be forthcoming as soon as possible.

Interrogatory 9-24a. requests, among other things, a description of the fuel in residence at Big Rock Point and the duration of the Company's fuel contracts. This information is described in Mr. Burgener's letter of March 21, 1978 to NUS, and additional information is set forth in documenta-tion provided to NUS by Mr. Larsen on March 12, 13 and 21.

The information provided on March 12 and 13 is included in handwritten form as Attachment C to NUS Internal Correspond -

ence #EnSD-FS-194. This material is being typed in a more legible form as a table, and it i11 be sent to you very shortly. In addition, I wish te all to your attention the l fact that, as indicated in the response to Interrogatory 9-29, i pages 39-44 of NUS Analysis File 5148-SA-A2 were deleted i because they contain proprietary information.

8003 M O)M

In your interrogatories, you requested that we answer each question in four parts,.the' third of which was:

C. Identify and provide all documents and studies, and the particular parts thereof, examined but not relied upon by the Licensee, which pertains to the subject matter in question.

We have interpreted this request as meaning those documents and studies examined by Licensee in preparing re-sponses to these interrogatories. This interpretation is consistent with item B. which requests that the studies and documents relied upon as a basis for the answer be identified'and provided.

Please call if you have any questions.

Sincerely, m Y#

Joseph Gallo One of the Attorneys for Consumers Power Company JG/kar Enclosures

.