Updates 900129 & 1114 Responses to GL 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment & Suppl 1.Svc Water Pump Motor Oil Cooler HX Will Be Inspected & Cleaned W/Pump Overhaul Scheduled to Be Performed Between Mar-June
ML20126C288
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 12/17/1992
From: Jackson M
COMMONWEALTH EDISON CO.
To: Murley T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
GL-89-13, TAC-M74090, TAC-M74091, NUDOCS 9212230008
Download: ML20126C288 (2)


Text

'

i

_ ) C:mm:nwealth Edis:n c:mber 17,1992 D) o n rs$ro e,lllinois 60515 Dr. T. E. Murley, Director Office of Nuclear Reccior Regulatior.

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Document Control Desk

Subject:

Zion Station, NRC Docket Numbers 50-295/304 and NRC TAC Numbers M74090 and M74091 Updated Response to Generic Letter 8913, " Service Water System Problems Affecting Safety Related Equipment", dated July 18,1989 and Supplement 1 dated April 4,1990.

References:

(a)

M. Richter letter dated January 29,1990 to the U. S. NRC.

(b)

D. Taylor letter dated November 14,1990 to the U. S. NRC.

The purpose of this letter is to provide an updated response to Generic Letter 8913 for the Commonwealth Edison (CECO) Zion Nuclear Power Station. The referenced letters provided confirmation that CECO established arograms to implement recommended actions of the Generic Letter or that equally e"fective actions hao been pursued.

Reference (a provided the company response and reference (b) notified the NRC of programmati changes. This update i~'udes the Inspec' ion, cleaning or replacement of the Unit 0 (common to both units) and Unit i heat exchangers for Zion Station. The inspection, or testing and cleaning, or replacement of the Udt 2 heat exchangers will be performed during the Z2R12 refueling outage as previous. ' rommitted.

In referenced submittal (a), CECO provided implementation or&s for Unit 1 and Unit 0 common systems prior to return to startup from the Unit 1 refue' outage Z1R12. Those commitments included the testing, Unit 0 and thirty seven (3 or inspection, and cleanin or replacement of eighteen (18) heat exchangers on heat exchangers on Unit

1. Of the 18 heat exchangers, eleven (11) have been inspected, and cleaned or replaced. The remaining seven (7) heat exchangers have either been deferred to the 1993 dual unit outage because they could not be effe?.tively isolated during the Unit 1 outage or it is work that can be perfonned during non outage erlods. The non outage heat exchangers will be inspected, and cleaned, or replaced rior to return to startup from Z2R12. Of the thirty-seven (37) heat exchangers identi ed on Unit 1; thirteen were tested, twenty three have been inspected, and cleaned or replaced with one heat exchanger remaining to be inspected.- The remaining heat exchanger is the Service Water pump motor oil cooler and will be inspected and cleaned wit 1 the pump overhaul schedule. This non-outage work is scheduled to be performed between March and June of 1993.

I i

I h 9212230008 921217 ADOCK 0500 5

l ZNLD/2377/1 KDR

I 1

):

l

~

Should f5 7287.u have any questions regarding this update, please call me at (708) 5 i

i d

'espec ully, l

)

M hl-. - -

i

/

arci A. Jackson 1

Nucle ic

' g Administrator j

Generic issues 3

i i

)

i 1

l l

i i

cc:

A. B. Davis, Regional Administrator, Rill C. Shiraki, Project Manager, NRR -