ML20126C263
| ML20126C263 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 12/17/1992 |
| From: | Beach A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Gates W OMAHA PUBLIC POWER DISTRICT |
| References | |
| NUDOCS 9212230001 | |
| Download: ML20126C263 (4) | |
Text
r p " "'%g 8
e UNITED STATES yx NUCLEAR REGULATORY COMMISSION i.
f REGION IV S
.f 611 RYAN PLAZA DRIVE, SUITE 1000 b,,
,8 ARLINGTON TEXAS 76011 DEC l 71992 Docket: 50-285 License: DPR-40 Omaha Public Power 6: strict ATTN:
W. G. Gates, Division Manager Nuclear Operations 444 South 16th Street Mall Mail Stop 8E/EP4 Omaha, Nebraska 68102-2247 Gentlemen:
SUBJECT:
SERVICE WATER SYSTEM OPERATIONAL PERFORMANCE INSPECTIONS A number of problems have recently been identified with service water systems, therefore, the NRC has designated these systems as the next generic area of emphasis and will perform an in-depth team insmction at most power reactor facilities.
The inspections will be conducted in accordance with new guidance and will be referred to as service water system operational performance inspections (SWSOPIs).
It will be our intention to complete the inspection process at all involved facilities within the next 3 years.
The inspections will evaluate the capability of the service water system to fulfill its thermal and hydraulic performance requiregents. The inspections will irciude evaluations of the system design, its operation, maintenance, and surveillance, and its past performance indicators. The NRC has conducted pilot nspections at a number of-facilities, including-the South Texas Project in Region IV. These pilot inspections established the inspection criteria that will be utilized in the performance of future inspections.
In order to accomplish the planned inspections, Region IV will form five-person inspection teams.
The teams will be composed of Rcgion IV personnel and a mechanical design engineering consultant. The in.gections will include a 4-day preparatory site visit and 2 weeks of onsite inspection.
Each-of the onsite trips will be separated by a one week. review of the gathered documentation.
It will be:our intent to have the normal authorized access for the NRC inspactors and escorted access, as:necessary,-for the consultant.
We will advise you of our schedule for performing the inspection at your Fort Calhoun Station facility in future correspondence. We.will then confirm that schedule several weeks prior to the -start of the inspection and will request that specific information be made available upon the team's arrival at-the site.
9212230001 92321E '
/
PDR ADOCK 05000285 G
PDR Y
._ _=
i l
l'
.0maha Public Power District ;
e If you have any questions related to the schedule, conduct, or content of the inspection, please contact the assigned team leader, Philip C. Wagner, at (817) 860-8127, 4
J Sincerely, O
\\
. Bill Beach, ec r
i Division of Reactor ojects i
I cc:
I LeBoeuf, Lamb,-Leiby & MacRae ATTN: Harry H. Voigt, Esq.
i 1875 Connecticut Avenue, NW i
Washington, D.C.
20009-5728 1
4 Washington County Board of Supervisors 4
i ATTN: Jack Jensen, Chairman l
Blair, Nebraska 68008 Combustion Engineering, Inc.
ATTN: Charles B. Brinkman, Manager l
Washington Nuclear Operations i
12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 i
j Nebraska Department of Health j
ATTN: Harold Borchert, Director Division of-Radiological Health i
301 Centennial Mall, South P.O. Box 95007 Lincoln, Nebraska 68509-5007-Fort Calhoun: Station ATTN: T.:L. Patterson, Manager j
. P.O. Box 399-Fort Lalhoun, Nebraska 68023 4
i i
I 7
i.-
t-i l
u
, _w.
. -,. ~...., _ _ _.. _. - -. -, -. _
0maha.Public Power District,
bec to DMB (IE01) - DRS bec distrib. by RIV:
J. L. Milhoan Resident Inspector DRSS-FIPS Section Chief (DRP/C)
MIS System RIV File DRP RSTS Operator Project Engineer (DRP/C)
Lisa Shea, RM/ALF, MS: MNBB 4503 DRS Section Chief (DRP/TSS)
Senior Resident Inspector - Cooper 4
Senior Resident Inspector - River Bend P. Wagner J. D. Wilcox, Jr., NRR (MS-9A1) 4 RIV:TL*
D:QM}[h D:DRP PWagner/lb Shollins/MABBeach
/ /92
\\' M j }L b/92
/
- previously concurred
1
.0maha' Public Power District [bEchtoDMB(IE01)- DRS bec distrib. by RIV:
J. L. Milhoan Resident Inspector DRSS-FIPS Section Chief (DRP/C)
HIS System RIV File DRP RSTS Operator Project Engineer (DRP/C)
Lisa Shea, RM/ALF, MS: MNBB 4503 DRS Section Chief (DRP/TSS)
Senior Resident Inspector - Cooper
.i Senior Resident Inspector - River Bend P. Wagner J. D. Wilcox, Jr., NRR (MS-9A1) i RIV:TL*
0:M D:DRP PWagner/lb Skollins/h /ABBeach
/ /92 DM J }k/b/92
- previously concurred
,