ML20126B459

From kanterella
Jump to navigation Jump to search
Informs That Rev 4b to Annex to Generic Generating Station Emergency Plan Consistent w/10CFR50.54(q) Requirements & Acceptable
ML20126B459
Person / Time
Site: Byron  Constellation icon.png
Issue date: 12/09/1992
From: Mccormickbarge
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
NUDOCS 9212220094
Download: ML20126B459 (2)


Text

.

0 00

(*

L r) ^g"[,h i

Dockets No. 50-454; 50-455 Commonwealth Edison Company ATTN:

Mr. Cordell Reed Senior Vice President Opus West 111 1400 Opus Place Downers Grove, IL 60515

Dear Mr. Reed:

This is to acknowledge receipt of Revision 4b of Byron Annex to the Generic Generating Stations Emergency Plan (GSEP) which was transmitted by letter dated November 16, 1992.

We have reviewed the changes to the Byron Annex and determined that they are consistent with the requirements of 10 CFR 50.54(q) and do not decrease the effectiveness of the emergency plan. Therefore, these changes are acceptable.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter will be placed in the NRC's Public Document Room.

Should you have any questions regarding this letter, please contact Ms H.

Simons of my staff at (708) 790-5799.

Sincerely,

  • 0riginal signed by J. W. McCormick-Garf.er" J. W. McCormick-Barger, Chief Emergency Preparedness and Non-Power Reactor Section See Attached Distribution 210022 ves Rill g

RIII.

Q']d I

og Sim6ns/sd ber McCormick-Barger 12m2 g

p/q g

p

~

0 921222oo94 921209 4

gDR ADOCK0500g4

Commonwealth Edison Company 2

Distribution cc:

M. Wallace, Vice President, 1

PWR Operations T. Kovach, Nuclear Licensing Manager T. Schuster, Nuclear Licensing Administrator R. Pleniewicz, Station Manager D. Brindle, Regulatory Assurance Supervisor DCD/DCB (RIDS)

OC/LfDCB Resident Inspectors, Byron, Braidwood, Zion Richard Hubbard J. W. McCaffrey, Chief, Public Utilities Division Licensing Project Manager, NRR Robert Newmann, Office of Public Counsel, State of Illinois Center Robert M. Thompson, Administrator k'isconsin Division of Emergency Government State Liaison Officer

1. Johnson, Ceco, Corporate Emergency Preparedness Director D. Gonzalez, Rll!

D. Bement, FEMA V