Docket No. 50-309 Mr. Charles D. Frizzic President Maine Yankee Atomic Power Company 83 Edison Drive Augusta, Maine 04336
Dear Mr. Frizzle:
S'JBJECT: 10 CFR 50.54 QUALITY ASSURANCE PROGRAM CHANGE REVIEW
References:
1.
Letter dated December 6,1992, from S, E. Nichols of Maine Yankee to the U. S. Nuclear Regulatory Commission transmitting Revision 7 to the Quality Assurance Program.
2.
Letter dated January 28,1992, from L. H. Bettenhauwn of the U. S.
Nuclear Regulatory Comn'ission to Maine Yankee transmitting a 10 CFR 50.54 Quality Assurance Program Change Review.
3.
Letter dated July 30,1992, from J. R. Hebert of Maine Yankee to the
+
U. S. Nuclear Regulatory Commission transmitting Revision 7 to the Maine Yankee Quality Assurance Program.
4.
Letter dated October 15, 1962, from L. H. Bettenhausen of the U. S.
Nuclear Regulatory Commission to Maine Yankee transmitting a 10 CFR 50.54 Quality Assurance Program Change Review.
5.
Letter dated November 4,1992, from J. R. Hebert of Maine Yankee to the U. S. Nuclear Regulatory Commission transmitting Revision 7 to the Maine Yankee Coality Assurance Program.
Referencas 1 through 4 document your previous submittals of Revision 7 to your Quality Assurance Program and our response to those submittals. Your last submittal (Reference 3) was revien'd by our staff. This review identified questions which required further clarification, and these concerns were documented in Reference 4.
9212220054 921216 PDR ADOCK 05000309-p PDR OFFICIAL RECOR'> COPY G:MYQAll49 t
,!O l
/ 3p i
\\r b
o
I Mr. Charles D. Frizzle 2
We received your letter dated November 4,1992 (Reference 5), transmitting the requested clariGeations to your July 30,1992, submittal. The Region I staff has reviewed the change identified in References 3 and 5 and found the changes to the Operational Quality Assuranco Plan acceptable in that the Quality Assurance Program continues to satisfy the criteria of Appendix B of 10 CFR Part 50.
If there are changes to other operative QA commitments existing in docketed correspondence outside of the QA prograrn description, you are obligated to notify this ofGce. Implementing such changes should be based on 10 CFR 50.54(a)(3). The effectiveness of your Quality Assurance Program ar.d procedure implementation will continue to be the subject of routine regional inspections.
If you have any questions concerning the above, please contact Mr John Caruso at (215) 337-5359.
Sincerely, s
n, Chief Operations Branch Division of Reactor Safety cc:
P. L. n. uerson, Project Manager (Yankee Atomic Electr% Company)
R. W. Black.more, Plant Manager J. A. Ritsher, Attorney (Popes and Gray)
P. Dostic, State Nudear Safety insetor Peter Brann, Assistant Attorney General U. Vanags, Maine State Plannirg Office C. Brinkman, Combustion Engineering, Inc.
First Selectmen of Wiscasset Maine State Plan.. ig Officer Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector State of Maine, SLO Designee OFFICIAL RECORD COPY G:MYQAll49
C_.
Mr. Charles D. Frizzle 3
bec:
Region I Docket Room (with concurrences and IFS Forms)
DRS/EB SALP Coordinator L. Bettenhausen, DRS N. Blumberg, DRS J. Linville, DRP W.12zarus, DRP C. Marschall, SRI - Maine Yankee (w/ concurrences and IFS Forms)
H. Eichenholz, SRI - Vermont Yankee V. McCree, OEDO E. Trottier, LPM, NRR W. Butler, NRR F. Bower, DRS V. Curley, DRS DRS Files (1)
AI:DRSj/
RI:DRS R :DRS Cangso/dmg Blumberg Bettenhausen 4 92 11 1
OFFICIAL RECORD COPY G:MYQAll49 l
-