ML20126A567
| ML20126A567 | |
| Person / Time | |
|---|---|
| Issue date: | 12/04/1992 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20126A557 | List: |
| References | |
| REF-QA-99990001-921209 99990001-92-28, NUDOCS 9212210124 | |
| Download: ML20126A567 (1) | |
Text
____ __
+
f APP E11DJ1._A 110TICE OF VIQlMQ1{
As a result of the inspection conducted on 11ovember 4, 1992, and in accordar.cc with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Arpendix C (Enforcement Polir y) (1992), the following violations were identifled:
10 CFR 31.5(a) issues a general license to local government ager.cies to
- acquire, receive,
- possess, use or
- transfer, in accordance with the provisions of paragraphs (b),
(c) and (d),
byproduct material contained in certain measuring, gauging or controlling devices.
1.
10 CFR
- 31. 5 ( c) ( 3 )
- requires, in part, that removal of a generally licensed device be performed by a person holding a specific license to perform such activity.
Contrary to the above, on September 11, 1992, a generally licensed device was removed from its installed position by persons not specifically licensed to perform '.his activity.
In addition, the device was in the " measure" <r open shutter position f rom this date until Sep'.cmber 29, 1992, while stored on the floor in a room with unrestricted access.
2.
10 CPR 31. 5 (c) ( 2 ) requires, in part, that any person who possesses material under the general license shall assure that the device is tested for leakage of radioactive material and proper operation of the on-off mechanism and indicator at intervals as are specified in the label. Three year intervals are specified.
Contrary to the above, from August 21, 1975 to September 28,
- 1992, the device was not tested for leakage or proper operation of the on-off mechanism.
These are Severity Level IV violations (Eupplement VI).
Pursuant to tt'e provisions of 10 CFR 2.201, Iancaster Area Se'/er Authority (LASA) is hereby required to submit to this of fice within thirty days of the date of the letter which transmitted this Notice, a written statement or explanation in reply, including:
(1) the correctivo steps which have been taken and the results achieved; (2) corrective steps which will be taken c avoid further violations; and (3) the date when full compliance wall be achieved.
Where good cause is shown consideration will be given to extending c
this response time.
LASA OFFICIAL RECORD COPY Pg 3 December 4, 1992 9212210124 921209 RETURN ORIGINALi o RE01 OA999 ELOLAN REGION I IE:07 99990001 PDR