ML20126A434

From kanterella
Jump to navigation Jump to search
Extends Invitation to Participate in 1993 NRC Erosion/ Corrosion Workshop Scheduled to Be Held in Region I on 930209.Objective of Workshop to Address Current Erosion/ Corrosion Issues
ML20126A434
Person / Time
Site: Millstone, Haddam Neck  File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 12/09/1992
From: Hodges M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST UTILITIES
References
NUDOCS 9212210057
Download: ML20126A434 (6)


Text

. _ _ _ _ _. _ _ _. _ _ _ _ _. _ _ _ _ _. _ _.. _ _ _ _ _. _

e go ** svg UNITLD ST Alt S 8') f' h NUCLEAR HEGULATORY COMMISSION r, -

14.= l RE GION I g

g 45 ALL(NDALE HoAD

%...../

MNG of PHUSSIA, PLNNSYLVANIA 1940S 141f, DEC 0 91952 i

Docket Nos.: 50-213 50 245 50-336 50-423 Mr. John P. Opeka Executive Vice President - Nuclear Northeast Utilities P.O. Ilox 270 liartford, Connecticut 06141 027(

Dear Mr. Opeka:

SUlUECT: 1993 NRC EROSION / CORROSION WORKSi10P We would like to invite you and members of your staff to participate in the 1993 NRC Erosion / Corrosion Workshop. The workshop is ccheduled to be held in Region 1 on Febmary 9,1993. The ob,,icctive of the workshop is to address current crosion/ corrosion (EC) issues by promoting industry, NRC, and research organization discussions in regard to EC in high energy, carbon steel piping systems. The morning of the workshop is divided.

into a number of talks by industry, NRC and EPRI members relative to the implementation of EC progmms by industry licensees.

The afternoon of the workshop will allow participants to attend one of three discussion groups (breakout sessions). The breakout sessions cover the following areas relative to implementation of EC monitoring programs: A) EC monitoring program scopes, including methods for selecting systems and components for inspection,11) practices for inspecting carbon stect components, and C) methods of evaluating inspection data and dispositioning results. The discussion groups will present their findings to the collective workshop audience at the end of the breakout sessions. Final concluding remarks will be made by industry and NRC members at the end of the workshop program.

We request that you inform us of the estimated number of your staff who wish to attend the workshop by January 6,1993, and update the number of participants by _

January 20,1993. Also, please indicate the names of those attending the workshop and their '

personal preference for the afternoon discussion groups. 'A form is enclosed which may be used to case your efforts. - Please fax this form to Mr. Al Imhmeier at (215) 337-5320 or mail the form in to Mr. Al lehmeier at the address listed on the form.

9212210057 921209 PDR ADOCK 0S000213 P

PDR

/

i v

- ~_

DEC09!!FT4 4

hir. John F. Opeka Also enclosed is a tentative schedule for the workshop on February 9,1993. We will advN you of the workshop location in the near future. Should you have any questions or comments, please contact me at (215) 337-5359 or Mr. Al Lohmeier at (215) 337-5089.

pf a w. AJ9s Marvin W. Ilodges, Director Division of Reactor Safety Region i

Enclosures:

as stated cc w/ encl:

W. D. Romberg, Vice President, Nuclear, Operations Services J. P. Stetz, Vice President, lladdam Neck G.11. Ik)uchard, Nuclear Unit Director, lladdam Neck S. E. Scace, Vice President and Nuclear Site Director, Millstone Station H. F. Ilaynes, Nuclear Unit Director, Millstone Unit 1 C.11. Clements, Nuclear Unit Director, Millstone Unit 3 J. S. Keenan, Nuclear Unit Director, Millstone Unit 2 D. O. Nordquist, Director of Quality Services R. M. Kacich, Director, Nuclear Licensing Gerald Garfield, Esquire Nicholas Reynolds, Esquire K. Abmham. PAQ Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident inspector State of Connecticut SLO 1,,,

J

9 DEC00 W Mr. tohn F. Opeka i bec w/ encl:

Region I Docket Room (with concurrences)

W.12nning DRS R. Blough, DRP L. Docrficin, DRP W. Raymond, SRI, liaddam Neck P. Swetland, SRI, Mi4 stone C. W. Hehl, DRP

i. Wiggins, DRS L. Bettenhausen, DRS R. De La Espriella, DRP J. Stolz, PD !{ NRR CONCURRENCE RI:DRS RI:DRS RI:DRS RI:DRS Jpiedoff ALohrraier EllGray JPDurr y/64 Y'r

</h jJ 7 w it.It I9L

,d

!)2]t lyt 1

RI:DRS MWHod

[L /f/Q 1

s-.

+r y

4-

_.-y e-y.,

-e-,

r.w..-

y.-.w..

t.-

-i-v--

i -- r w g

--wwv

_. - _.. - -.. _ ____m

__..m._.~

....m

___.-.___.___.m.

.m

. [

g&* *

  • C o

'k UNITED STAlt3 1

[

p, NUCLEAR HEGULATORY COMMISSION i

7..

ij RE GION I 475 ALLENDALE HOAD i

g KING OF PRLISSIA PFNNSYLVANlA 19406-141$

%,.... + y i

EltOSION/COltitOSION IN NUCLEAlt POWEll COh1PONENTS & PIPING 1993 NitC EROSION /ColtitOSION WOltKSIIOP SCIIEDULE OF EVENTS Tuestlay, l'ebruary 9 1993 8:00 - 8:30 Ah!

Itegistration in lobby 1

8:30 8:45 Ah!

Call to Assembly A. l.ohmeier 8:45 - 9:00 Ah!

introduction A1. Ilodges 9:00 - 9:15 AM Welcome T. 51artin 9:15 - 10:00 Ah!

IUC hionitoring Progriun NitC Overview W. Itussell 10:00 - 10:15 AM lireak

.11 10:15 - 11:00 AM IUC A1onitoring Program

. Utility Overviews S. hilltenberger I1:00 - 11:45 Ah!

luc 51onitoring Progiam EPRI Overview

11. Chexal 11:45 - NOON Questions All NOON - 1:00 Phi LUNC11 All 1:00 - 1:15 PM Formation of Ilreak out Groups A. Lohmeier 4

e

.~.-,w

-nr.

-,,.,n,-,,,,+,,-,...n.,,

, a e.-,,

e

.. - - ~.. _ _ - - -.. -

EROSION / CORROSION IN NUCl EAR POWER COMI'ONFNIS & PIPING 1993 NRC EROSION / CORROSION WORKSIIOP SCllEI)UI.E OF EVFNIS Tuesday, Feliniary 9,1993 1:15 - 2:45 PM lireakout Sessions A,II,C A.

Scope of Erosion / Corrosion Monitoring Prognuns, including Metliods of Selecting Systems and Components for Inspection 11.

Inspection Metlinds and Pnictices C.

Melliods of Evaluating Inspection 1)ata to Assess tiie Acceptability of Inspected Components and Cornttive Actions 2:45 - 3:00 PM 11reak All 3:00 - 3:15 PM Summary & Feedback lireakout Session A. Groups A Facilitator 3:15 - 3:30 PM Summary & Feedback fireakout Session 15. Groups 11 Facilitator 3:30 3:45 PM Summary & Feedback lireakout Session C. Groups C Facilitator 3:45 - 4:00 PM Concluding Observations S. Mittenberger 4:00 - 4: 15 PM Concluding Obwrvations J. Durr 4:15 - 4:30 PM Closing Remarks M. Ilodges 4:30 PM Adjournment A. Lotuncier 2

m.

_.m....._

__m..

. _.m.

g ** * %

s

/*,

UNM(D STATES v

_{ g

^( 'g NUCLEAR REGULATORY COMMISSION 5'

/l hlG?DN i

/

a 476 ALLENDAlt ROAD "g,

,8 KING Or PRUS$1A, PINNSYLVANIA 19404 1415 EROSION / CORROSION IN NUCLEAR POWER COMPONENTS AND PIPING 1993 NRC EROSION / CORROSION WORKSIIOP A'ITENDANCE FORM Organization:

Nuinber Attending:

Description of Ilreakout Discussion Sesslorts:

A.,II.,C.

A. Groups - Scope of Erosion / Corrosion Monitoring Prognuns, including Methods of Selecting Systems and Components for Inspection

11. Groups - Inspection Methods and Practices C. Groups - Methods of Evaluating Inpsection Data to Assess the Acceptability of Irtspected Components, and Corrective Actions Names of Individuals Attending the Workshop, and Discussion Group Preferences:

5 Name 13D1fteference AlltrJule l' reference i

Please fax this form back to Al Imhmeier at (215) 337-5320, or call the information into him at (215) 337-5089, or return the form by mail by January 6,1993 to:

Mr. Al Lohmeier NRC - Region I 475 Allendale Rd King of Prussia, PA 19406

-.