ML20126A384
| ML20126A384 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom, Limerick |
| Issue date: | 12/09/1992 |
| From: | Hodges M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Danni Smith PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| References | |
| NUDOCS 9212210029 | |
| Download: ML20126A384 (7) | |
Text
-
$* **%g UNITED ST ATES h-
d 4
p, NUCLEAR REGULATORY COMMISSION j
REGION i ra E
475 ALLENDALE ADAD 4
g 6,
g KING OF PRUSSIA. PENNSYLVANIA 194061415 4
DEC 00 D92 Docket Nos.: 50-277 50-278 50-352 50-353 Mr. D. M. Smith Senior Vice President-Nuclear Philadelphia Electric Company Nuclear Group Headquarters Correspondence Control Desk P. O. Box 195 Wayne, Pennsylvania 19087-0195
Dear Mr. Smith:
SUBJECT:
1993 NRC EROSION / CORROSION WORKSHOP We would like to invite you and members of your staff to participate in the 1993 NRC Erosion / Corrosion Workshop. The workshop is scheduled to be held in Region I on February 9,1993. The objective of the workshop is to address current erosion / corrosion (EC) issues by promoting industry, NRC, and research organization discussions in regard to EC in high energy, carbon steel piping systems. The morning of the 'vorkshop is divided into a number of talks by industry, N'RC and EPRI members relative to the implementation of EC programs by industry licensees.
l The afternoon of the workshop will allow participants to attend one of three discussion groups i
(breakout sessions). The breakout sessions cover the following areas relative to implementation of EC monitoring programs: A) EC monitoring program scopes, including methods for selecting systems and components for inspection, B) practices for inspecting l
carbon steel components, and C) methods of evaluating inspection data and dispositioning results. The discussion groups will present their findings to the collective workshop audience at the end of the breakout sessions. Final concluding remarks will be made by industry and NRC members at the end of the workshop program.
l l
{.
kk DO O
77 p
/h i.
DEC 0 9 W12 Mr. D. M. Smith We request that you inform us of the estimated number of your staff who wish to attend the workshop by January 6,1993, and update the number of participants by January 20, 1993. Also, please indicate 'S names of those attending the workshop and their personal preference for the afternoon discussion groups. A form is enclosed which may be used to case your efforts. Please fax this form to Mr. Al Imhmeier at (215) 337-5320 or mail the form in to Mr. Al lehmeier at the address listed on the form.
Also enclosed is a tentative schedule for the workshop on February 9,1993. We will advise you of the workshop location in the near future. Should you have any questions or comments, please contact me at (215) 337-5359 or Mr. Al lehmeier at (215) 337-5089.
Q.A W<1 Marvin W. Ikidges, Director Division of Reactor Safety Region i linclosures: as stated ec w/ encl:
R. N. Charles, Chairman, Nuclear Review Ikiard D.11. Miller, Vice President, Peach llottom Atomic Power Station G. Rainey, Vice President, Nuclear Services Department G. Cranston, General Manager, Nuclear Engineering Division C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.
K. P. Powers, Plant Manager, Peach llottom Atomic Power Station A. A. Fulvio, Regulatory Engineer, Peach Ik>ttom Atomic Power Station G. J. Ileck, Jr., Manager, Licensing Section D. R. liclwig, Vice President - Limerick Generating Station G. Madsen, Regulatory Engineer - Limerick Generating Station Secretary, Nuclear Committee of the lloard V
J. W. Durham, Sr., Senior Vice President and General Counsel J. A. Isabella, Director, Generation Projects Department, Atlantic Electric H. W. Gorman, Manager, External Affairs R. McIxan, Power Plant Siting, Nuclear livaluations D. Poulsen, Secretary of liarford County Council R. Ochs, Maryland Safe Energy Coalition J.11. Walter, Chief Engineer, Public Service Commission of Maryland Public Document Room (PDR)
Incal Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO 1
DEC 0 9 E L
Mr. D. M. Smith cc w/enci (continued):
NitC Resident inspector Conimwwealth of Pennsylvania TMI - Alect (TMIA) 1 b
4 m.___________.__._.______.___.
DEC 0 9 7332.
Mr. D. M. Smith bec w/ encl:
Region 1 Docket Room (with concurrences)
- 11. Wenzinger, DRP C. Anderson, DRP C. Ilchl, DRP J. Wiggins, DRP W. lanning, DRS T. Kenny, SRI 1,imerick
- 11. Norris, DRP C. Miller, PD I-2, NRR G)NCURRIINCli RI:DRS RI:DRS RI:DRS RI:DRS J kxjoff Alobmeier lillGray JPDurr AM J
D$0' Ch.
pl/ lyn pd&
- 11. I il n +
RI:DRS MWilod ' s 1M IL / flit
_ _ ~ _ _.
_=.
p**M%q s
h, UNITED STATES
,e
- [\\ )
(g NUCLEAR REGULATORY COMMISSION 0, -
W.- [h 8
BlGION I l
r,.
47L All[NDALE FtOAD
'g
,d*
KING OF PRUSStA, PENNSYLVANIA 1%'IG 1415 EROSION / CORROSION IN NUCLEAR POWER COMPONFXI'S & PIPING 1993 NRC EROSION / CORROSION WORKSilOP SCIIEDULE OF EVENTS Tuesday, February 9,1993 8:00 - 8:30 AM Registration in lobby 8:30 - 8:45 AM Call to Assembly A. lehmuer 8:45 - 9:00 AM Introduction M. Ilodges 9:00 - 9:15 AM Welcome T. Martin 9:15 - 10:00 AM IUC Monitoring Program NRC Overview W. Russell 10:00 - 10:15 AM Hreak All 10:15 - 11:00 AM IUC Monitoring Progrmn Utility Overviews S. Miltenht rger 11:00 - 11:45 AM fuC Monitoring Program i
EPRI Overview
- 11. Chexal 11:45 - NOON Questions All NOON - 1:00PM LUNCH All 1:00 - 1:15 PM Formation of Break out Groups A. i.ohmeier
~.
I I
(
f EROSION / CORROSION IN NUCLEAR POWER COh1PONENTS & PIPING 1993 NRC EROSION / CORROSION WORKSIIOP SCIIEDULE OF EVENTS Tuesday, Fehniary 9,1993 i
1:15 - 2:45 PM lireakout Sessions A,II,C A.
Scope of Erosion / Corrosion hionitoring h
Progrants, including Stethods of Selecting Systems and Components for inspection 11.
Inspection hiethods and Practices C.
hiethods of Evaluating inspection Data to Assess the Acceptability of Inspected Components and Corrective Actions j
1 2:45 - 3:00 PM llreak All 3:00 - 3:15 PM Summary & Feedback lireakout Session A. Groups A Facilitator 3:15 - 3:30 PM Sununary & Feedback lireakout Session II. Groups 11 Facilitator 3:30 - 3:45 PM Summary & Feedback
^
lireakout Session C. Groups C Facilitator 3:45 - 4:00 PM Concluding Observations S. hilltenberger 4:03-4: 15 PM Concluding Observations J. Durr 4:15 - 4:30 PM Closing Remarks 51, llodges 4:30 PM Adjournment A, Lohmeier 2
. _ _... ~.. _ _, _.
ps * * * * %g f,
f4 UN11[D ST Alls
'I WUCLEAft flEGULATORY COMMISSION
'O
{ y 3.., q'j g
,,, { ']4. f HIGION I W-t,%
4/5 Allt NDALL HOAD l'
FING of PHULLIA, P[NNSYLVANIA 194t01415 j
EltOSION/ColtitOSION IN NUCl EAlt POWElt COMPONENTS AND PIPING 1993 NitC EltOSION/COltitOSION WOltKSilOP A'ITENDANCE 170ltM Organliation:
Numl>cr Attending:
Description of lireakout Discussion Sessions:
A.. ll.,C.
A. Groups - Scope of Erosion / Corrosion Monitoring Progrmm, including Methods of Selecting Systeins and Components for inspection
- 11. Groups - Impection Methods and Practices C. Groups - Methods of Evalnating Inpsection Data to Assess the Acceptability of Inspected Components, and Corrective Actions Nan es of Indisidnals Attending the Workshop, and Discussion Group Preferences:
Muue Ei!>LPrrierence MienJ11e_htference t
Please fax this form back to Al Imhmeier at (215) 337-5320, or call the information into him at (215) 337-5089, or return the form by mail by January 6,1993 to:
Mr. Al Lohmeier NRC - llegion 1 475 Allendale Rd King of Prussia, PA 19406 I'
_