ML20126A284

From kanterella
Jump to navigation Jump to search
Forwards Status of Util Responses to FSAR Commitments Forecast to Be Responded to by May 1985,tabulation of Commitments for May 1985 & Corresponding Resolutions.Amend 11 to FSAR Expected by 850712
ML20126A284
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 06/10/1985
From: Mittl R
Public Service Enterprise Group
To: Butler W
Office of Nuclear Reactor Regulation
References
MP84-123-06-1, MP84-123-6-1, NUDOCS 8506130294
Download: ML20126A284 (3)


Text

35

.a ~

1 g

,,b.

i 3

C PS'

' PublicService Electnc and Gas Company

~

80 Park Plaza, Newark, NJ 07101/ 201430-8217 ' ' MAILING ADDRESS / P.O. Box 570, Newark, NJ 07101 Robert L Mitti General Manager Nuclear Assurance and Regulation June 10, 1985

~ Director of Nuclear Reactor Regulation O.S. Nuclear Regulatory, Commission 7920-Norfolk Avenue Bethesda, Maryland 20814 Attention:

Mr. Walter Butler, Chief Licensing Branch 2

~

Division of Licensing

~'

Gentlemen:

~ HOPE CREEK GENERATING STATION DOCKET NO. 50-354 FSAR COMMITMENT-STATUS THROUGH MAY 1985-

-Public Service Electric and Gas Company presently plans to issue Amendment No. 11 to the Hope Creek Generating Station Final Safety.. Analysis Report by July 12, 1985.

Accordingly, this letter'is provided to document the status of Hope Creek Generating Station responses to FSAR commitments which were forecasted to be responded to by.May 1985.

-Attachment'I is a tabulation of the Hope Creek Generating Station Final Safety Analysis Report commitments for May '1985, and the corresponding resolution for each commitment. "

Should you have.any questions in this regard,.please contact u s.

Very truly yours,

//

8506130294 850610 PDR ADOCK 05000354 A

PDR Attachment I

- Hope Creek Generating Station - FSAR Commitment Status through May 1985 C

D.

H.' Wagner (w/ attach)

USNRC Licensing Project Manager g

A. R.'Blough (w/ attach)

USNRC Senior Resident Inspector bd

$h* 1 -

954912 (4M) 7 83

re

~

\\'

PAGE l-OF 2 ATTACHMENT I HOPE CREEK GENERATING STATION FSAR COMMITMENT STATUS THROUGH MAY 1985 FSAR Commitment Location Commitment Resolution 1..

Question / Response This commitment concerns Appendix:

providing results of the Question 210.20 Feedwater Isolation Check Valve Analysis in fulfillment of HCGS SER Confirmatory Item No.

1.

This information will be provided in July 1985.

FSAR COMMITMENTS PAST DUE AND REFORECASTED TO MAY 1985 2.

FSAR Sect. 9.3.2.2.2.11 This commitment concerns providing procedures for disposal of lab samples which are associated with the plant specific procedure to assess the extent of core damage.

This information will be provided in July 1985.

3.

FSAR Sect. 9.3.2.3.2.b.1 This commitment concerns providing a plant specific procedure to assess the extent of core damage based on radionuclide concentra-tions and other parameters in fulfillment of HCGS SER Confirmatory Item No. 31.

This information will be provided in July 1985.

4.

Question / Response This commitment concerns Appendix:

updating FSAR Section 3.6 Question 210.21 tables and figures for final stress analysis results.

This information will be provided in July 1985.

5.

Question / Response (Same as Question 210.21 Appendix:

above)

Question 210.24 6.

Question / Response This commitment concerns l

Appendix:

developing a program to Ouestion 281.14 monitor the Boral surveil-lance program at an operating plant.

This information, in

r, o.

g PAGE 2 OF 2 ATTACHMENT I HOPE CREEK GENERATING STATION

'FSAR COMMITMENT STATUS THROUGH MAY 1985

.FSAR Commitment Location-Commitment Resolution 6.

Question / Response fulfillment of DSER Open Item

-Appendix:

No. 140, will be provided in Question 281.14 (Cont'd)

July.1985.

7.

Question / Response This commitment concerns Appendix:

providing trip settings for Question 440.10 the leak detection system.

This information, which was scheduled to be included in Amendment 10 to the HCGS FSAR, is being revised.

This information will be provided in July 1985.

RC:db OP 06 01/02A k

4