ML20126A270
| ML20126A270 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 12/14/1992 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | Northeast Nuclear Energy Co (NNECO), Connecticut Light & Power Co, Western Massachusetts Electric Co |
| Shared Package | |
| ML20126A272 | List: |
| References | |
| DPR-65-A-166 NUDOCS 9212180107 | |
| Download: ML20126A270 (4) | |
Text
- 'f.Y AOo t
'o UNITED STATES
~g
[ 'i ' '
NUCLEAR REGULATORY COMMISSION
.,, (
g g
,a W ASHING TON, D. C. 20565
\\*..../
1[0RTHEAST NUCLEAR ENERGY COMPANY THE CONNECTICVT LIGHT AND POWER COMPANY THE WESTERN MASSACHUSETTS ELECTRIC COMPANY D_0CKET NO. 50-336 MILLSTONE NUCLEAR POWER STATION. UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 166 License No. DPR-65 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Northeast Nuclear Energy Company, et al. (the licensee), dated August 5,1992, as supplemented by letter dated October 20, 1992, corplies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's-rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of tne.Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in ccmpliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
9212180107 921214 PDR ADOCK 0S000336 P
PDR 4
. 2.
According'.y, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paraaraph 2.C.(2) cf Facility Operating License No. DPR-65 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No.166, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of issuance to be implemented within 30 days of issuance.
FOR THE NUCLEAR ktGULATORY COMMISSION
+Y f A
John lF.Stolz, Director
+Y A
9 Project Directorate I-4 Divishn of Reactor Projects - I/II Office of Nuclear Reactor Regulation Att achn.ent:
Changes to the Technical Specifications Date of Issuance:
Dece 44, 1992
ATTACHMENT TO LICENSE AMENDMENT NO. 166-FACILITY OPERATING LICENSE NO. DPR-65 DOCKET NO. 50-336'
(
Replace the following page of the Appendix A Technical Specifications with the enclosed page.
The revised page is identified by amendment number and-contains vertical lines indicating the areas of change, Remove Insert 3/4 6-18 3/4 6-18 Pr m
a N
- w w
L---er*ce w
-er eme
=>
+r
--www,
'w-
-.iesu.a
= w e
o TABLE 3.6-2-(Continued) 1-CONTAINMENT ISOLATION VALVES l
or
. a e-o G'
TESTABLE DURING MAXIMUM
- E
--VALVE NUMBER FUNCTION PLANT OPERATION ISOLATION TIME i
o
.z L
"' A.
CONTAINMENT ISOLATION VALVES
- 2-AC-12 Containment Air Sample Yes 5 seconds Z
2-AC-15 Containment Air Sample Yes 5 seconds 2-AC-20 Containment Air Sample Yes 5 seconds i.
m 2-AC-47 Containment Air Sample Yes 5 seconds
-HV-8150 Containment Air Sample Yes 5 seconds-HV-8151 Containment Air Samole Yes 5 seconds 2-MS-191A' Steam Generator Sample Yes.
5 seconds 2-MS-191B Stease Generator Sample Yes
.5 seconds 2-EB-91 Hydrogen Purge Yes 5 seconds 2-EB-92 Hydrogen Furge Yes 5 seconds t
w.)
2-EB-99 Hydrogen Purge Yes 5 seconds 2-EB-100 Hydrogen Purge Yes 5 seconds cn 8.
MANUAL 2-SI-709*
' Shutdown Cooling Yes Not Applicable i
.2-SI-463*
Safety injection Tank Test Line Yes Not Applicable.
2-SA-19*
Station Air Yes Not Applicable 2-RW-21*
Refueling Water Purification Yes Not Applicable 2-RW-63*
Refueling Water Purification Yes Not Applicable -
2-RW-154*:
Refueling Water Purification Yes Not Applicable 2-RW-232*
Refueling Water Purification Yes Not Applicable.
'2-AC-46* -
Hydrogen Monitoring Yes Not Applicable Hydrogen Monitoring Yes Not Applicable
- k-2-AC-51*:
AFW Condensate Drain' Yes Not Applicable
- a 2-MS-458* _
AFW Condensate Drain Yes
'Not Applicable.
g_
.2-MS-459*
.L C.
OTHER.- NOT APPLICABLE-2
- h *May be opened on an l'ntermittent basis under administrative control.
[
.c.
- en - -
.(
~
s
-m
,