Text
"
]
I c;swremon
~,
ENERGY PERRY NUCLEAR POWER PLANT Mad Address:
R. A. StT3tmail J
PO. BOX 97 10 CENTER ROAD -
PF98Y, OHIO 44081 VICE PRESIDENT. NUCLEAR PERRY.CHIO 44081 (216) 259-3737 December 10, 1992 PY-CEI/0 EPA-0167L i-Mr. Richard Magni OEPA Division of Vater Pollution Control P.O. Box 1049 VaterMark Drive Columbus, Ohio 43266-0149 l
Re: Director's Final Findings and Orders l-for use of H-130 and CL-37 Cooling Vater Additives for the Perry Nuclear Power Plant OEPA Permit No. 3IB00016*DD
Dear Mr. Magni,
In accordance vith the Director's Final Findings and Orders, this letter and attachments comprise the annual report to maintain approval for use of Calcon H-130 as a cooling vater additive for zebra mussel control at the Perry Nuclear Power Plant.
The results of monitoring and toxicity testing done during the' application of l
H-130 are included in Attachment 1.
Reports for sections 4.a. - e. of the Orders are in Attachmects 2 - 7.
Reports on research, problems encountered, i
and any additional information is in Attachment 8.
The reports from Calgon Corporation stamped Confidential" contain proprietary information. Any release of these documents should be approved through Calgon Corporation.
I Please call Louise Barton at (216) 259-3737 ext. 5512 if you have any questions or need additional information.
Sincerely, r
i
/s,
ll A WN w L
Robert A. Stratman
-o
_g RAS:LKB:s.s wo n.
3@
Attachments (tm "O
cc - NRC Project Manager M
NRC Resident Inspector Office.
' CVO NRC Document Control Desk lhN' NRC Region III Ly B. Hall, OEPA - Northeast. District Office 55 e n. =
.- t 3 Qw
(\\ \\
\\
s arra c ymrun.
a* c o o m, a
g v
'.nc
e v
PY-CEI/0 EPA-0167L ATTACHMENT 1 H-130 Monitoring and Toxicity Testing Results The annual report shall contain the results of all monitoring and toxicity testing done during the application of 11-130.
licte: This information was previously submitted to'the OEPA as required per Section 3 of the Orders.