w w v.,+.,n.n un m so,un w.u,ua,,,w.c, December 14, 1992 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Hashington, D.C.
20555 Gentlemen:
In the Matter of
)
Docket Nos. 50-259 Tennessee Valley Authority
)
50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - HONTHLY OPERATING REPORT FOR THE HONTH Of NOVEMBER 1992 In accordance with the requirements of the BfN Technical Specifications section 6.9.1.3, the Monthly Operating Report for the month of November 1992 is provided in the enclosure.
If you have any questions, please telephone me at (205) 729-7566.
-Sincerely, d
G. D. Pierce L
Interim Manager of Site Licensing Enclosures cc: See page 2 p
l.
17.104 9212170104 921130
/ :f1f I
f-l'
-PDR ADOCK 05000259 l-R PDR If L.
l-
~.
W 2
0,S. Nuclear Regulatory-Commission December 14, 19921 Enclosures.
-cc (Enc 10sures):
INPO Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30389 Regional Administrator U.S. Nuclear Regulatory Commission L
Region II 101 harietta Street, NH, Suite 2900 Atlanta, Georgia 30323 Hr. Frederick J. Hebdon, Director Project Directorate II-4 Division of Reactor Projects I-II Off'oe of Nuclear Reactor Regulation,-Hail 13 H3 Hashington, D.C.
20555 Mr. Ted Hartson, Director Electric Power Research Institute h
P.O. Box 10412 Palo Alto, California 94 4 rw. B. A. Hilson, Project Chief U.S. Nur. lear Regulatory Commission Regto' II Regulatory Commission 101 Heiletta Street, NH, Suite 2900 Atlanta, Georgi'. 30323 NRC Resident In:?ector Browns Ferry Nuc ear Plant Route 12, Gox 637 Athens, Alabama 35611 Hr. Fred Yost,-Director of Research Services, Utility Data Institute Inc.,
1700 K Street, NH, Suite 400 Washington, D.C.
20006-1 m-
4 HONTHLY OPERATING REPORT BROWNS FERRY NUCLEAR PLANT TENNESSEE VALLEY AUTHORITY NOVEMBER 1992 DOCKET NUMBERS 50-259, 50-260, AND 50-2%
LICENSE NUMBERS DPR-33, DPP-52, AND DPR-68 A
f OPERATIONAL
SUMMARY
NOVEMBER 1992 UNIT 1 Unit remains on administrative hold to resolve various TVA and NRC concerns, UNIT 2 Unit 2 entered fuel coastdown on October 1, 1992, with a planned End of Cycle date on January 29, 1993.
The unit was online 100 percent of this reporting period and generated 663,700 MWHs (Gross) Electrical Power.
UNIT 3 Unit remains on administrative hold to resolve various TVA and NRC concerns.
r
AVERAGE DAILY UNIT POWER LEVEL 00CKET NO.-
50-259 Unit One PREPARED BY S. A. Ratliff TELEPHONE (205) 729-2937 HONTH NOVEMBER 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (HWe-Net)
(HWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26-0 11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
I 16 0
3 PLLIC207/449/8
i AVERAGE DAILY UNIT POWER-LEVEL DOCKET N0.
50-260 Unit Two i
PREPARED BY S. A. Ratliff TELEPHONE (205) 729-2937 HONTH NOVEMBER 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MHe-Net)
(MHe-Nat) 1 942 17 891 2
936 18 891 3
878 19' 884 4
942 20 882 5
932 21 875 6
926 22 872 7
932 23 872 8
919 24 878 9
917 25 861 10 918 26 864 11 911 27 858 12 905 28 860 13 901 29 857 14 909 30 851 15 902 16 900 NOTE: Net generation values are based on manual readings from an integrating watt hour meter.
Small differences in the time of_ day of manual recording may cause the values to vary slightly.
PLLIC207/449/9
a AVERAGE DAILY UNIT POWER LEVEL DOCKET N0.
50-296 UNIT Three PREPARED BY S. A. Ratliff TELEPHONE (205) 729-2937 HONTH NOVEMBER 1992 DAY AVERAGE DAILY P0HER LEVEL DAY AVERAGE DAILY POWER LEVEL (HHe-Net)
(HHe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
k 6
0 22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
16 0
PLLIC207/449/10
m OPERAT1NG DATA REPORT-DCCKET'NO.
50-259 PREPARED BY 5.
A.
Rat 11TT TELEFHONE (z05) /z9-z93/
QPERATING STATUS Notes
~
- 1.
Unit Name:
-Browne Ferry Unit One 2.
Reporting Period:
November 1992 3.
. Licensed -Thermal Power (MHt): 3293 4.
Nameplate. Rating (Gross MWe):
1152
- 5. " Design Electrical Rating (Net MWe):. 1065 6.
Maximum Dependable Capacity (Gross MHe):
1098.4
- 7. ; Maximum Dependable Capacity (Net MHe):
1065 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
- 9. ' Power Level To Which Restricted, If Any (Net MHe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 720 8040 160784
- 12. Number of Hours Reactor Has Critical 0
0 59521
- 13. Reactor Reserve Shutdown Hours 0
0'
- 14., Hours Generator On-Line 0
0 6997 58267 0
0 0 ___._
- 15. Unit Reserve Shutdown Hours 0
0 168066787
- 16. Gross Thermal Energy' Generated.(MHH)
- 17. Gross Electrical Energy Generated (MHH) 0 0
5539813r>
- 18. Het Electrical Energy Generated (MHH)
-2043
-24465 53511025 19.-Unit Service Factor 0
0-36.2 20.' Unit Availability Factor 0
0 36.2
- 21. Unit Capacity: Factor'(Using MDC Net) 0 0
31.3
- 22. Unit Capacity Factor (Using DER Net) 0 0
31.3
- 23. Unit Forced Outage Rate 100 100 59.0
- 24. Shutdowns Scheduled Over Next 6 Months (type, Dale, and Duration of Each):
N/A
- 25. :If Shut;Down AtlEnd Of Report Period, Estimated Date of Startup:
To be determiaed t
PLLIC207/449/11
' OPERATING DATA REPORT DOCKET NO.
50-260 PREPARED BY 5.
A.
Hatliff TELEPHONE (zub> /z9-z93'
+
OPERATING STATUS Notes
- 1.. Unit Name:
Browns Ferry Unit Two
- 2.. Reporting Period:
November 1992 3.
Licensed Thermal Power (MHt): _3293
~
4.
Nameplate Rating (Gross MWe):
1152 5.
Design Electrical Rating (Net MWe):
1065 6.
Maximum Dependable Capacity (Gross MWe):
1098.4 7.
Maximum Pependable Capacity (Net HHe):
1065
- 8.. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report Give Reasons:
N/A 9.
Power' Level To Which Restricted, If Any (Net MHe):
N/A
- 10. Reascis For Restrictions, If Any:
N/A This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 720.0 8040.0 155671
- 12. Number of Hours Reactor Has Critical 720.0 7751.9 68258
- 13. Reactor Reserve Shutdown Hours 0
0 14200
- 14. Hours Generator On-Line 720.0 7660.5 66127
- 15. Unit Reserve Shutdown Hours.
0 0
0
- 16. Gross Thermal' Energy Generated (MHH) 1982446.5
_23811158.9 188887014
- 17. Gross Electrical Energy Generated (MHH) 663700.0 7996090.0 62665898
- 18. Net Electrical Energy Generated (MHH) 644845.0 7796312.0
-60606571
- 19. Unit Service Factor 100.0 95.3 42.5
- 20. Unit' Availability Factor 100.0 95.3 42.5
- 21. Unit Capacity Factor.(Using HDC Net)-
84.1 91.1 36.6
- 22. Unit Capacity Factor L(Using DER Net) 84.1 91.1 36.6
- 23. Unit Forced Outage Rate 0
2.3 50.5
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refuelina. January 29. 1993. 120 days
- 25. :If Shut.Down At End Of Report. Period, Estimated Date of Startup:
N/A PLLIC207/449/12
a OPERATING DATA REPORT-DOCKET NO.
50-296-PREPARED BV
- s. A. Hat 11tt
. TELEPHONE (205) /z9-z93/
OPERATING STATUS' Notes
-1.
- Unit Name
Browns Ferry Unit Three 2.
Reporting Period:
November 1992 3.
Licensed Thermal Power (MHt): 3293
~
4.
Nameplate. Rating (Gross MWe):
1152 5.
Design Electrical Rating (Net MHe):
1065
- 6. ; Maximum Dependable Capacity (Gross MWe):
1098.4
- 7. l Maximum' Dependable Capacity (Net MHe):
1065
- 8..If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A 9.
Power Level To Hhich Restricted, If Any (Net MHe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 720.0 8040.0 138096
- 12. Number of Hours' Reactor Has Critical 0
0 45306
- 13. Reactor Reserve Shutdown Hours 0
0 5150
- 14. Hours Generator On-Line 0
0 44195
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MHH) 0 0
131868267
- 17. Gross Electrical Energy Generated (MHH) 0 0
43473760
- 18. Net Electrical Energy Generated (MHH)
-1528.0
-19200.0 41933609
'19. Unit Service Factor 0
0 32.0
- 20. Unit Availability Factor 0
0 32.0
- 21. Unit Capacity Factor (Using MDC Net) 0 0
2S.5-
- 22. Unit Capacity Factor (Using DER Net) 0 0
28.5
- 23. Unit Forced Outage Rate.
100.0 100.0 63.6
- 24. Shutdowns Scheduled Over.Next'6 Months (Type, Date, and Duration of Each):
N/A
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
To be determined PLLIC207/449/13 i m
CDCItET NO:
50-259 tHIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME:
One PREPAREG BY:5. A. Ratliff REPORT MONTH:
' NOVEMBER 1992 TELEPHONE:(205) 729 2937 j'
l l
l l
lMethodof l Licensee l
l l
Cause and Corrective l l
l l
l Duration l lShuttingDown l Event l System lComoonentl Action to-l l
2 3
4 5
lNo.
l Date l Type l(Hourm) l Reason l Reactor lReportNo. l Code l Code l
Prevent Recurrence l
'l l
l l
l l
l l
l I
]
I 1
l I
I I
I I
I I
I l 315 l06/01/85 -l F
l 720 l
F l
l l
l l Administrative hold to l i
l
'l l
l l
l l
l l
l resolve various TVA and l L
l' I
I I
I I
I I
I INRCconcerns.
l 1-1 I
I I
I I
I i
l I
'l l
i I
I I
I I
I I
I
'l I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
l i
I i
1 1
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I l-1 I
I I
I l
l l
1.
I I
I I
I I
I I
I I
l l
l I
I i
l i
I I
I I
I I
I I
I I
I I
i I
I I
I I
I I
I I
l-i I
I I
I I
I I
I i
1 1
1 I
I I
I I
I I
I I
I I
I I
I I
I I
I i
i l
I-1 I
I I
1 i
l I
i 1.
I I
I I
I I
I I
i 1
1 4
I I
I I
I I
I I
i i
1
-l I
I I
I I
I I
I I
[.
I: Forced Reason:
Method:
Exhibit G-Instructions 2
3 F
i d
S: Scheduled A-Equipment Failure (Expl.in) 1-Manual for Preparation of Data B-Maintenance or Test '
2-Manual Scram Entry sheets for Licensee
'C-Refueling 3-Automatic Scram Event Peport (LER) File D-Regulatory Restriction 4-Continuation of-Existing Outage (NUREG-061)
E-Operator Training and License Examination 5-Reduction F-Administrative 9-Other S
G-Operational. Error (Explain)
Exhibit I-Same Source H-Other (Explain)
PLLIC207/449/14
[
w-
MET W-
'50-260
- ~~
tHIT SHUTDowMS AND POWER REDUCTIONS
. UNIT NAME:
Two COMPLETED BY:5. A. Patliff r
REPORT MONTH:
NOVEMBER 1992 TELEPHONE:(205) 729-2937
^
.v.
'l l
l l
l.
lMethodof l Licensee l
l l
Cause and Corrective l l
l l
l Duration l lShuttingDown l Event l System l Component l Action'to l
l 2
3 5
'lNo.
- l. Date l'vpe j(Hours) l' Reason l Reactor lReportNo. [ Code #
jCode l
Prevent Recurrence l
l-l-
l' I
l l.
I I
I I
I l
l-1 I
I I
I I
i i
I l'
lNone
[
l
]
l l
l l
l l
l-1 I
I
.I l
i I
I I
i l
i I
i 1
1 I
I I
I I
I I
I I
l i
I I
I I
i 1
.I I
I I
I I
I I
I I
I I
l l
l l
1 1
I I
I I
I I
I i
i i
i l
I i
1.
I I
I I
I I
I I
I I
I I
I l
I I
I I
I I
I I
I I
i
-l I
i i
i l
1 l
I i
l I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
l' I
I I
I i
i l
i 1
.I i
i l
I l -
I i
I i
i i
l I
i i
i
~
l i
I i
i i
l i
l-1 I
I I
I l
-l i
I I
I I
I I
I I
'l
.I l
i I
I I
I I
I I
I l-1 I
i i
I I
I I
I l
l I
I I
i 1
1 I
l l
'I : Forced Reason:
Method:
Exhibit G-Instructions 2
3 F
S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation of Existing Outage (NUREG-061)
E-Operator Training and License Examination 5-Reduction F-Admini s trative 9-Other 5
G-Operational Error (Explain)
Exhibit I-Same Source H-Other (Explain)
'PLLIC207/449/15 -
a:
R.
c,-
m
BCCCIET to:
'50-296~
UNIT SHUTDOWS AND PCMER REDUCTIONS UNIT NAP'E:
Three COMPLETED BY:5.
A.' Ratliff' REPORT MONTH:
NOVEWJER 1992 TELEPHONE:(205) 729-2937 y
m.
l l
l l
l j Method of l Licensee l
l l
Cause and Corrective l l
'l l
l Duration l lShuttingDown i Event l System l Component 1 Action to l
l 2
3 5
l ' No.'
l Date l Type l(Hours) l Reason l Reactor lReportNo. l Code #
l Code l
Prevent Recurrence l
l-1 I
I l
i I
I I
l l
1..
1 I
I I
I I
I I
I 1
l157 103/03/85 l F
l 720 l
F l
4 l
l l
lAdministrativeholdto l.
l l
l-l l
l l
l l
l resolve various TVA 'and l c
I l-1 I
I I
I I
I INRCconcerns.
l i
l-1 I
i i
l I
i i
l' il 1.
1 I
I I
I I
I I
I I
l-1 I
I i
l I
I I
i l
i I
i i
i i
i i
i l
i i
i l
I i
l I
I i
l' I
I I
I I
I I
i i
I I
I I
I I
1 1
I I
i 1
1 I
I I
I I
i i
I i
l I
1 I
I I
i 1
1 1
I I
I I
I I
I i
1 I
I I
I I
(
l 1
l i
I I
I I
I I
I 1
I I
I I
I I
I I
I I
I 1.
I I
I i
l l
I I
I l
l 1
1 1
I I
I I
i i
i
'l i
I I
I I
I I
I I
I I
I I
i i
i 1
I I
i i
i i
I i
i i
l I
l l
I i
i l
l I
l l
l-I :-Forced 2
3 F
Reason:
Method:
Exhibit G-Instructions 5: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry sheets for Licensee
~
C-Refueling 3-Automatic Scram Event Report'(LER) File D-Regulatory Restriction 4-Continuation of Existing Outage (NUREG-061).
E-Operator Training and License Examination 5-Reduc tion F-Administrative -
9-Other S
G-Operational Error (Explain) -
Exhibit I-Same Source H-Other (Explain)
+
PLLIC207/449/15 g
s-r-
-.-.-- :------