_. _ _.
B ALT IMORE GAS AND ELECTRIC i
CALVERT CLIFFS NUCLEAR POWER PLANT 1650 CALVERT CLIFFS PARKWAY
- LUSBY. MARYLAND 20057 4702 CHARLES H CHUSE l't A84T (sf hlhAt IA%U.d h CAlvt Hf CLiri 5 December 14,1992 U. S. Nucicar Regulatory Commission Washington, DC 20555 NITENTION:
Document Control Desk SUll11?CT:
Calvert Cliffs Nuclear Power Plant 11 nit Nos.1 & 2; Docket Nos. 50-317 & 50-318 November 1992 Operating Data Reports Gentlemen:
The subject reports are being sent to you as required by Technical Speel5 cation 6.9.1.6.
Should you have any questions, please contact Afr. Ilruce hirowca at (410) 260-3989.
Very truly yours, gM/ / fcfL m
i CIIC/LBS/bjd Attachments cc:
D. A. Brune, Esquire J. E. Silberg, Esquire R. A. Capra, NRC D. G. Mcdonald, Jr., NRC T. T. h1artin, NRC P. R. Wilson, NRC R.1. hfclean, DNR J. II. Walter, PSC R. A. IlartGeld,NRC P. Lewis, INPO K. Larson, ANI l'/:103 I
9212170181 921130 PDR ADOCK 05000317 l !
R PDR
'h Y
__. _ _ __ _. _.._ _. _ __ m __ _._. _
ao*********************************************************************a**ae UNIT 1 OPERATING DATA REPORT occa************************************************************************
Docket No. 50-317 December 14, 1992 Prepared by Leo Shanley j
Tolophono : ( 410) 260-674 4 OPERATING STATUS I
=
- 1. UllIT NAME Calvert Cliffs Unit 1 2.
REPORTING PERIOD NOVEMBER 1992 3.
LICENSED T!!ERMAL POWER (MWT) 2700
- 4. NAMEPLATE RATING (GROSS MWe) 918 5.
DESIGN ELECTRICAL RATING (NET MWe) 845 i
6.
MAXIMUM DEPENDABLE CAP'Y (GROSS MWo) 860
- 7. MAXIMUM DEPENDABLE CAP'Y (NET MWo) 825 8.
CilANGE IN CAPACITY RATINGS NONE
-9.
POWER LEVEL TO WiiICll RESTRICTED N/A
- 10. REASONS FOR RESTRICTIONS N/A Cumulative This month Year-to-Data to Date 4
- 11. IfOURS IN REPORTING PERIOD 720 8,040 153,997
- 12. NUMBER OF !!OURS REACTOR WAS CRITICAL 683.0 4,306.2.
107,606.0 i
- 13. REACTOR RESERVE SilUTDOWN HOURS 0.0 0.0 3,019.4 l
14.'llOURS GENERATOR ON LINE 663.5 4,184.4 105,234.9
- 15. UNIT RESERVE SHUTDOWN llOURS 0.0 0.0 0.0
- 16. GROSS TilERMAL ENERGY GENERATED (MWil) 1,767,811 10,940,980 265,277,487
- 17. GROSS ELECTRICAL ENERGY GEN'TLD(MWil) 593,711 3,618,782 88,154,470
-18.
NET ELECTRICAL ENERGY GENERATED (MWil) 569,279 3,467,208 83,822,713
- 19. UNIT SERVICE FACTOR 92.2-52.0 68.3 L
- 20. UNIT AVAILABILITY FACTOR 92.2 52.0 68.3 l
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 95.8 52.3 66.0
- 22. UNIT CAPACITY FACTOR (USING DER NET) 93.6 51.0 64.4-
- 23. UNIT FORCED OUTAGE RATE 7.8 4.4 9.3 i-
- 24. SilUTDOWNS SCllEDULED OVER Tile NEXT l-SIX MONTilS (TYPE, DATE AND DURATION):
N/A l
- 25. IF; SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
N/A l
L o
l UNIT SIIUTDOMNS AND POWER REDUCTIONS l
DOCKET NO.
50-317 t
UNTTNAME Cabert GifS-Ut
{-
DATE
_ December 14.1W2 '
l COMPLEED BY Leo Starter i
TFT FPHONE (41012Nts44 l
1 REPORTMONTII Nmember1992 2
l MEI1IOD OF l
SitUTHNG LICENSEE CAUSE & CORRECTIVE DURATION DOWN EVENT SYYTT31 COMPONEST ACIlONTO
[
l-(IIOURS)
REASON 2 REACIUR3 REPORT #
CODE CODES PREVENT RECURRENCE 4
NO.
DATE TYPEI 92-10 921115-F 0.0 B
5 N/A SJ P
Reduced power to inspect 12 Steam Generator Feed Pump (SGFP) for oilleaks.
j 92-11 921124.
F 56.5 A
3 92-008 EL BDUC
- 1. Automatic Reactor trip due to Main Generator ground fault.
2 Fault in isophaw bus when inspection mindow j
and gasket became loose and fell into isophase bus
?
doct.
- 3. Repaired inspection window. Long-term f
corrective actions are being evaluated.
I L
i' l
l i
l.
I
?
.t i
I I F: Forced 2 Reason:
3 Method:
- S: Scheduled A - Equipment Failure 1 - Manual I
B - Maintenance or Test 2 - Manual Scram.
3 - Automatic Scram.
5 IEEE Standard 803A-1983 i
C-Refueling
'4 - Continued D - Regulatory Restriction 1
E - Operator Training & License Examination 5 - Reduced Load
}
F-Administrative 9-Other 1
l G - Operational Error 11 - Other j
,e
l AVERAGE DAILY UNIT POWER LEVEL
- os*********************************************************************
Docket No. 50-317 Calvert Cliffs Unit 14o. 1 December 14, 1992 Prepared by Loo Shanley Telephone (410) 260-6744 140VEMBER 1992
,7 Average Daily Power Level Average Daily Power Level Day (MWe-Net)
Day (MWe-Net) 1 865 17 874 i
P 2
866 18 874 I
3 864 19 874 4
864 20 875 5
865 21 875 6
867 22 865 7
815 23 865 8
868 24 509-9 871-25 0
10 871 26 0
11 872.
27 722 12 872 28 869 4
13 872 29 870 14 875 30 869 15 851 16 846 i
1 i
.J.
4 DOCKET NO.50 317 CALVERT CLIFFS. UNIT 1 December 14,1992 i
i
SUMMARY
OF OPERATING EXPERIENCE I
November 1992 The unit began the rnonth at 10(K5 (865 MWe).
Power was reduced to approximately 907c (800 h1We) from 0320 on November 7 to 0700 on November 8 to test Main Turbine valves and clean Main Condenser waterboxes.
Power was reduced to 65% (540 MWe) from 2300 on November 15 to 0250 on November 16 to inspect 12 Steam Generator Feed Pump for oilleaks.
Power was reduced to %7c (835 MWe) from 1710 on November 22 to 1434 on November 23 to repair the Main Generator hydrogen seal oil tank level control valve.
An automatic reactor trip occurred at 1418 on November 24 due to a Main Generator ground fault.
The isophase bus duct was repaired and the reactor was taken critical at 0320 on November 26. The unit was paralleled at 2250 after repairs were made to 11 Auxiliary Feed Pump which failed after the -
trip.
100% power (860 MWe) was reached at 1105 on November 27.
The unit ended the month at 1007c (870 MWe).
5
,w
' December 4, 1992 REFUELING INFORNATION RE0l!ESI i
1.
Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No. 1.
2.
Scheduled date for next refueling shutdown:
Narch 5, 1994.
3.
Scheduled date for restart following refueling: Hay 17, 1994.
4.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
None identified at this time.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
December 1993 for'U1012.
6.
Important licensing considerations associated with the refueling.
None identified at this time.
7.
The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pool.
(a) 217.
(b) 1410.
Spent fuel pools are common to Units 1 and 2.
8.
(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
(a) 1830.
(b) 2880.
9.
The projected date of the last. refueling that can be discharged to the Spent fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.
Narch 1993
UNIT:2 OPERATING DATA REPORT Docket No. 50-318 December 14, 1992 Prepared by Leo Shanley Telephone:(410)260-6744 OPERATING STATUS
- 1. UNIT NAME Calvert Cliffs Unit 2 2.
REPORTING PERIOD NOVEMBER 1992 3.
LICENSED TilERMAL POWER (MWT) 2700 4.
NAMEPLATE RATING (GROSS MWe)
- 911 5.
DESIGN ELECTRICAL RATING (NET MWe) 845 6.
MAXIMUM DEPENDABLE-CAP'Y (GROSS MWe) 860 7.
MAXIMUM DEPENDABLE CAP'Y (HET MWo) 825 i
8.
CilANGE IN CAPACITY RATINGS NONE 9.
POWER LEVEL TO WiiICl! RESTRICTED N/A
- 10. REASONS FOR RESTRICTIONS N/A Cumulative This month Year-to-Date to Dato
- 11. IIOURS IN REPORTING PERIOD 720 8,040 137,352
- 12. NUMBER OF !!OURS REACTOR WAS CRITICAL 720.0 7,180.1 99,220.4
- 13. REACTOR RESERVE SHUTDOWN llOURS 0.0 0.0 1,296.6
- 14. IIOURS GENERATOR ON LINE 720.0 7,115.6 97,837.8
- 15. UNIT RESERVE SIIUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS TIIERMAL ENERGY GENERATED (MWH) 1,941,456 19,007,801 249,147,107
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 636,795 6,213,043 82,297,424
- 18. NET ELECTRICAL. ENERGY GENERATED (MWil) 610,847 5,955,699 78,633,847
- 19. UNIT SERVICE FACTOR 100.0 88.5 71.2-20.- UNIT AVAILABILITY FACTOR 100.0 88.5 71.2
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 102.8 89.8 69.4
- 22. UNIT CAPACITY FACTOR (USING DER NET) 100.4 87.7 67.8
- 23. UNIT FORCED OUTAGE RATE 0.0 11.5 6.0
- 24. SilOTDOWNS SCHEDULED OVER TNE NEXT SIX MONT!!S (TYPE, DATE AND DURATION):
Refueling, February 19, 1993 for 108 days l
- 25. IF UNIT IS SNUTDOWN AT END OF REPORT PERIOD, i
ESTIMATED DATE OF STAF.T-UP:
l
=N/A
- HOTE: Recalculated Nameplate Rating for Unit 2 t
l
UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.
SL318 UNIT NAMI Cahert ClifS-U2 DATE December 14.1992 COMPLETED BY Leo Sivaniev TF1 FPHONE (410ENum REPORT 51ONTII Novemher1992 METliOD OF S11UTI1NG 13CENSEE CAUSE & CORRECITVE DURAllON DOWN
. EVENT SYSTEM COMPONENT ACTION 'IU (IIOURS)
REASONI REACTOR 3 REPORT #
CODE CODES PREVENTRECURRENCE NO.
DNIE.
TYPEI 4
There were no significant power reductions this month 1 F: Forced 2 Reason:
-* hiethod:
4 IEEEStandard 805-1984 S: Scheduled -
A-Equipment Failure 1 - h!anual B - Afaintenance or Test 2 - h1anual Scram.
C - Refueling 3 - Automatic Scram.
5 IEEEStandard 803A-1983 D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Reduced Load F-Administrative 9 - Other.
G - Operational Error II-Other
)
AVERAGE DAILY UNIT POWER LEVEL
}
Docket No. 50-318 Calvert Cliffs Unit No. 2 December 14, 1992 Prepared by Leo Shanley i
Telephone: (410) 260-6744 NOVEMBER 1992 Average Daily Power Level Average Daily Power Level Day (MWe-Net)
Day (MWe-Net) 1 791 17 850 2
850 18 851-3 849 19 850 4
849 20 850 5
850 21 850 6
850 22 848 7
849 23 851 8
851 24 851 9
851 25 849 10 851 26 850 11 851 27 853 12 851 28 853 13 849 29 854 14 849 30 854 l
15 850 16 850 l
i C
l' i-e A
f
(
DOCKET NO. 50 318 CALVERT Cl.lFIS - UNIT 2 Decemtx:r 14,1W2 S11MM A;lY OF OPERATING EXPERIENCE b'Ismber IW2 The unit began the month at 90% (750 MWe) while cleaning Main Condenser waterixnes. The unit was returned to 1(XPfc (850 MWe) at 1545 on November 1.
Power was reduced to 96% (840 MWe) at 2118 on November 22 due to a Control Eternent Assembly dropping. The unit was returned to 1(XI?E (850 Mwe) at 0130 on November 23.
The unit ended the month at 1(X)% (850 MWe).
t
s t
y I
' December 4, 1992 REFUELING INFORMATION RE0VESI 1.
Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2 2.
Scheduled date for next refueling shutdown:
February 19, 1993.
3.
Scheduled date for restart following refueling:
June 7, 1993.*
4.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
No.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
None required.
6.
Important licensing considerations associated-with the refueling.
The target length for this cycle will be 570 effective full power days.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217.
(b) 1410.
Spent fuel pools are common to Units 1 and 2.
8.
(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies._
(a) 1830.
(b) 2880.
9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.
Narch 1993
- Entry has changed since last reported.
.. ~.... -