Monthly Operating Rept for Nov 1992 for Monticello Nuclear Generating Station
ML20125E648
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 11/30/1992
From: Parker T, Paudtian H
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9212170166
Download: ML20125E648 (5)


Text

--

Nortnem states Power Company 414 Nicollet Mall Minneapohs, Minnesota $54011927 Telephone (612) 330 5500 December 7, 1992 Monticello Technical Spec hications Section 6.7.A.3 US Nuclear Regulatory Comreission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR CENERATINC PIANT Docket No. 50 263 License No. DPR 22 Monthly Operating Report November. 1992 Attached is the Monthly Operating Report for November, 1992 for the Monticello Nuclear Generating Plant.

110 Thomas M Pa Yer Manager Nuclear Support Service TMP/jlk C:

Director, Office of Resource Management Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector State of Minnesota - Kris Sanda Attachment l

17'.101 Ohbbhs3 f

PDR I

y

OPERATING DATA REPORT DOCKET NO.

50-263 DATE 12-1-92 COMPLETED BY H. H. Paustian TF'.EPHONE 612/295-5151 OPERATING STATUS

] Notes

]

1. Unit Name :

Monticello

)

)

2. Reporting period:

November

)

]

3. Licensed Thermal Power (MWt):

1670

)

)

4. Nameplate Rating (Gross MWe):

569

)

)

5. Design Electriccl Rating (Net MWe):

545.4

)

)

6. Maximum Dependable Capacity (Gross MWe): __564

)

)

7. Maximum Dependable Capacity (Net MWe) :

536

)

)

8. If Changes Occur.in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any

__N/A

-THIS MONTH YR.-70-DATE CUMULATIVE

11. Hours In Reporting Period 720 8040 187777
12. Number Of Hours Reactor Was Critical 720.0 7822.3 151240.7
13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7
14. Hours Generator On-Line 720.0 7784.3 148532.2
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1112280 12839385 228372962
17. Gross Electrical Energy Generated (MWH) 373865 4302459 77192304
18. Net Electrical Energy Generated (MWH) 359127 4130150 73832368
19. Unit Service Factor 100.0%

96.8%

79.1%

20. Unit Availability Factor 100.0%

96.8%

79.1%

21. Unit Capacity Factor (Using MDC Net) 93.1%

95.8%

73.4%

22. Unit Capacity Factor (Using DER Net) 91.5%

94.2%

72.1%

23. Unit Forced Outage Rate 0.0%

0.9%

3.7%

24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
Refueling Outage - 1/27/93 - 56 days
25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A
26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

. ~..,..,.. _.. _ _ _ _ _ -.

,._. _. - ~_. _ _

AVERAGE DAILY UNIT POWER LEVEL n

DOCKET NO.

50-263 UNIT Monticello__

DATE 12-1-92 COMPLETED BY H. H. Paustian TELEPHONE 612/295-5151 MONTH OF November DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1

529, 17 501.

2

525, 18 495.

3

524, 19 493.

4 520.

20 490.

5 521.

21 489.

6 521.

22 487.

7 511.

23 484.

8 513.

24 482.

9 512.

25 479.

10 51'..

26

478, 11 508.

27 476.

12 504.

28 474.

13 502.

29

472, 14 503.

30 469.

t-15 492.

- 16 498.

INSTRUCTIONS

~

i On thic format, list the average daily unit power'1evel in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt-o.

d-,m. _

w u

e

.y.~..,,.-m.n,,

,.rry.=

,r

-,,.-..,m',,,y.,

c. nl,

...,.-...,,y

-r--.n

1 l "I NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE 1

)

DOCKET NO.

50-263 l

DATE 12-1-92 2

COMPLETED BY H. H. Paustian

{

TELEPHONE 612/295-5151 i

i

}

MONTH NOV 1

i 11-1-92 to Power operation.

Coastdown continues, j

11-30-92 4

s 1

i s

i 1

1 i

i I

j 1

1 4

1 i

4

.~

f l

l i

t i

i a

i Note: Power operation _ defined as essentially 100% of-l rated power except for weekend load drops for specified surveillance testing.

l i

S 1

i l

i 5

i i

--,r-se

,w.w--

,,,wnr.,,-,-,

,e

,n,,,.,,~-n,,.,

,,;,,-,,+na.w..,-

--n-..,,,A,,,-,a-rl,.

n

<e,-

f UNIT SHUfDD'wWS AND POUER REDUCTIONS UNIT NAME NonticGTio DOCKEP NO.

50-263 DATE 12-01-92

..J j

COMPLETED BY ~H. H. Paustian-f s

TELEPHONE 612/295-5151 REPORT MONTH November i

Cause & Corrective No.

Date Duration Reason Method LER System Comp.

Action to

)

(hours)

(2) of No.

Code Code Shutdown (4)

(5)

Prevent Recurrence i

t (3)

I I

l None-l l

I 1

4 4

i i:

i I

4 4

4 I

I

[

1 3

4 1

2 Method:

. Draft IEEE Standard 1-Manual 805-1984(P805-DS)

F: Forced Reason:

S: Scheduled A-Eqyipment Failure (Explain) 2-Manual Scram B-Maintenance or Test 3-Automatic Scram 5

1 C-Refueling 4-Other (Explain)

IEEE Standard 803A-1983 f

D-Regulator Restriction E-Operator Training & License Examination j

F-Administrative

?

G-Operational Error (Explain) l 1

H-Other (Explain) i i

1.

I i

k i-i l

V b$b 4

CENTER FOR NUCLEAR WASTE REGULATORY ANALYSES San Antonio Office TRIP REPORT October 21, 1992

SUBJECT:

Natural Analogues Working Group PLACE /DATE:

Toledo, Spain / October 5-9, 1992 AUTHOR:

William M. Murphy DISTRIBUTION:

CNWRA HEC j.1dL1 J. Latz S.

Mearse S. Rowe W.C.

Patrick M.

Knapp CNWRA Directors W.

Brown CNWRA Element Mangers B; Stiltenpole j Geologic Setting staff L.

Kovach R. Green

-G.

Birchard J.

Randall S. Bahadur W. Morris F. Costanzi D.

Brooks N.

Eisenberg-M. Federline W. Ott M.

Silberberg i

100000

?

3Ob' (f)/j'fi dN lB ndad'M })hW 6/G AK, /WM'S VV 9212170100-921021 PDR WASTE-j pg-jg gyo y _ gg,j.

WM-11