|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217P5261999-10-20020 October 1999 Forwards Rev 0,Change 1 to Millstone Unit 1 Northeast Utils QA Program ML20217E9841999-10-14014 October 1999 Forwards Petition for Leave to Intervene Submitted on 991006 by Connecticut Coalition Against Millstone & Long Island Coalition Against Millstone ML20216F5061999-09-16016 September 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petitions as of 990831.During August,Director'S Decision (DD-99-10) on Seabrook Issued & Petition Closed.Six Petitions Open,Five in NRR & One in Nmss.Attachment 2 Withheld ML20216F3591999-09-15015 September 1999 Informs That Encl SRM on COMSECY-99-016 Being Released to Public,Effective 990915.Encl Documents Including 990406 SRM in Response to Millstone Independent Review Team 990312 Rept & 990713 Memo from G Caputo Previously Released ML20211K1431999-09-0202 September 1999 Notification of 990920 Meeting with Util in Rockville,Md to Discuss Recent Developments in New England Re Industry Deregulation & Restructuring Affecting Nu Use of Performance Indicators as Operating Plant ML20211K8611999-09-0101 September 1999 Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed ML20210U1461999-08-13013 August 1999 Notification of 990827 Meeting with NNECO in King of Prussia,Pennsylvania to Discuss Engineering Initiatives & Backlog Management ML20210P1361999-08-0404 August 1999 Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop ML20210E9311999-07-26026 July 1999 Notification of 990825 Public Meeting in Waterford,Ct Re PSDAR for Plant Unit 1 ML20210K1421999-07-22022 July 1999 Informs That Recipient Designated Chairman of Millstone Assessment Panel & E Adensam,Designated Co-Chairman.Panel Established to Assist Region I & NRR in Coordination of NRC Resources for Performance Monitoring & Inspecting Millstone ML20210C1631999-07-19019 July 1999 Forwards Monthly Rept Which Gives Status of 10CFR2.206 Petitions as of 990630.Six Open NRR,1 OE & 2 NMSS Petitions Available.Attachment 2 Withheld ML20209G0541999-07-13013 July 1999 Submits Director'S Guidance 99-001,effective Immediately,As Result of SRM in Response to Recommendations in Plant Independent Review Team Rept, ML20212J5161999-07-0101 July 1999 Documents,For Public Record,Interaction Between NNECO & NRC Staff Re Licensee Proposed Licensing Action Now Being Reviewed by NRC Staff ML20209D7621999-06-29029 June 1999 Notification of Meeting 99-40 on 990715 with Nuclear Energy Advisory Council in Waterford,Ct to Discuss Millstone Safety Conscious Work Environ/Employee Concerns Program ML20209D7721999-06-29029 June 1999 Notification of 990715 Meeting 99-39 with Util in Waterford, CT Re Corrective Action & Safety Conscious Work Environ/ Employee Concerns Program Team Exit Meeting ML20212H9471999-06-22022 June 1999 Informs That No Addl Work Required on TACs M91735 & M95118 & Closes TACs Administratively ML20196F0581999-06-21021 June 1999 Discusses Update of Status of Petition,Dtd 961125,as Amended by Ltr,Dtd 961223,by Petitioners Re Millstone,Units 1,2 & 3 & Haddam Neck Nuclear Facilities ML20207F0951999-06-0404 June 1999 Forwards Figure 1 to Millstone Combined Insp Repts 50-245/99-05,50-336/99-05 & 50-423/99-05.Rept e-mailed on 990604 IR 05000336/19990041999-05-10010 May 1999 Forwards Database Used by Licensee to Track Questions Asked During Osti,Insp Rept 50-336/99-04.Summary of Licensee Responses Also Provided ML20206A6041999-04-23023 April 1999 Notification of 990506 Meeting with Util in Rockville,Md to Provide Northest Nuclear Energy with Opportunity to Discuss Status of Development of post-shutdown Decommissioning Activities Rept for Unit 1 ML20206A1791999-04-22022 April 1999 Forwards Supplemental Info Related to Questions Re 50 Mile Ingestion Pathway Associated with Millstone Nuclear Facility That Were Raised During 990414 Commission Meeting on Remaining Issues Re Proposed Restart of Unit 2 DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action1999-04-20020 April 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action ML20206B2371999-04-19019 April 1999 Forwards Questions & Answers Addressing Long Island Emergency Planning Issue Raised at Commission Meeting ML20205N1641999-04-0606 April 1999 Notification of Significant Licensee Meeting 99-18 with Util on 990420 in King of Prussia,Pa to Discuss Plant Unit 3 Outage Plans ML20205J1961999-03-31031 March 1999 Discusses Clarification of Enforcement Discussion in 990319 Millstone Independent Review Team Rept ML20205C3041999-03-23023 March 1999 Notification of Significant Meeting 99-15 on 990407 with NNECO in Waterford,Ct,To Discuss Operational Safety Team Insp Exit Meeting for Millstone,Unit 2 ML20205J2011999-03-15015 March 1999 Forwards Annotated Draft Info Notice 99-XX Re Inadvertent Discharge of Carbon Dioxide Fire Suppression Sys in Cable Spreading Room,Reflecting Util Changes ML20207K4071999-03-0404 March 1999 Notification of Significant Licensee Meeting 99-11 with Util on 990318 in Waterford,Ct to Discuss Plans,Schedules & Progress Toward Recovery of Plant,Unit 2 ML20207K4011999-03-0404 March 1999 Rev 1 to Notification of Significant Meeting 99-12 with Util on 990318 in Waterford,Ct to Discuss Recovery of Millstone, Unit 2.Location of Meeting Has Been Changed ML20207H4601999-03-0404 March 1999 Notification of 990318 Meeting with Northeast Nuclear Energy Co in Waterford,Connecticut to Discuss Exit Meeting Results of Millstone Unit 2 Independent C/A Program C/A Insp Performed by NRR ML20206U3581999-02-0303 February 1999 Notification of Significant Licensee Meeting 99-08 with Util on 990217 Re 40500 Corrective Action Team Exit Meeting ML20202H7791999-02-0202 February 1999 Forwards Draft Request for Addl Info Re Loss of Main Feedwater Transient Analysis ML20202H7171999-02-0202 February 1999 Forwards Draft RAI Re Reg Guide 1.97 Deviation Request Involving Containment Area Radiation ML20202H7591999-02-0101 February 1999 Forwards Draft Request for Addl Info Re Radiological Consequences of Steam Generator Tube Rupture ML20202E4391999-01-28028 January 1999 Forwards Draft RAI Transmitted by Facsimile on 990127 to R Joshi of Licensee Staff Re post-LOCA Long Term Cooling. Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI ML20202E3941999-01-27027 January 1999 Forwards Draft RAI Re RG 1.97, Deviation Condensate Storage Tank Level. Memo & Encl Does Not Convey Formal Request for Info or Represent NRC Position ML20202E4361999-01-27027 January 1999 Forwards Draft RAI Transmitted by Facsimile on 990127 to R Joshi of Licensee Staff Re post-LOCA Long Term Cooling. Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI ML20204J6171999-01-27027 January 1999 Responds to 990107 Memo Re OI General Event Inquiry Case 99-01S,NRC Handling of Harassment & Intimidation Complaints at Millstone.Listed C/As Have Been or Will Be Taken ML20202E4511999-01-27027 January 1999 Requests Arrangements for Conference Call with Licensee to Discuss Listed Items Re Facility Electrical Mods ML20202E1461999-01-27027 January 1999 Forwards Draft RAI Re Application of Leak Before Break for Surge Line Sent 990125.Memo & Encl Does Not Convey Formal RAI or Represent NRC Position ML20202E4081999-01-27027 January 1999 Forwards Draft RAI Re Loss of Normal Feedwater Flow.Memo & Encl Do Not Convey Formal Request for Info or Represent NRC Position ML20202E4201999-01-25025 January 1999 Requests Responses to Listed RAIs So Review Can Be Completed ML20199A4251999-01-11011 January 1999 Informs That Time within Which Commission May Act to Review Decision of ASLB (LBP-98-28) Dismissing Proceeding in Docket Has Expired.Commission Declined Any Review.Decision Became Final Agency Act on 981229.With Certificate of Svc ML20198Q8621998-12-30030 December 1998 Notification of 990209 Meeting with Util in Waterford,Ct to Discuss NRC Regulatory Programs Applicable to Decommissioning Activities.Agenda Encl ML20206R2521998-12-28028 December 1998 Notification of Significant Licensee Meeting 98-94 with Util on 990111 to Provide Public Update on Status of Millstone Unit 2 Recovery Efforts ML20206R2601998-12-28028 December 1998 Notification of Significant Licensee Meeting 98-93 with Util on 990111 to Discuss Plans,Schedules & Progress Toward Recovery of Millstone Unit 2 ML20198D8551998-12-16016 December 1998 Notification of 981229 Meeting with Util in Rockville,Md to Discuss Status of Staff Efforts to Develop Std TSs for Permanently Shut Down BWR Plants ML20196J9371998-12-0808 December 1998 Notification of 990120 Meeting with Util in Peekskill,Ny to Inform Public of Licensee Plans for Decommissioning Indian Point Nuclear Generating Station Unit 1 ML20196G0241998-12-0303 December 1998 Notification of 981214 Meeting in Waterford,Ct to Provide Update on Status of Millstone Employee Concerns Program & Safety-Conscious Work Environ Programs & Solicit Comments from Public Closing on 961024 Order ML20195G7771998-11-19019 November 1998 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Decision of Atomic Safety & Licensing Board (LBP-98-24) Expired.With Certificate of Svc.Served on 981120 1999-09-02
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217J8951999-10-21021 October 1999 Staff Requirements Memo Re Affirmation Session on 991021, Rockville,Md (Open to Public Attendance) ML20217P5261999-10-20020 October 1999 Forwards Rev 0,Change 1 to Millstone Unit 1 Northeast Utils QA Program ML20217E9841999-10-14014 October 1999 Forwards Petition for Leave to Intervene Submitted on 991006 by Connecticut Coalition Against Millstone & Long Island Coalition Against Millstone ML20217D3601999-10-13013 October 1999 Staff Requirements Memo on SECY-99-223 Re Millstone Independent Review Team 990312 Rept on Allegations of Discrimination in NRC Ofc of Investigation Cases Nda: 1-96-002,1-96-007 & 1-97-007 & Associated Recommendation 6 ML20216F5061999-09-16016 September 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petitions as of 990831.During August,Director'S Decision (DD-99-10) on Seabrook Issued & Petition Closed.Six Petitions Open,Five in NRR & One in Nmss.Attachment 2 Withheld ML20216F3591999-09-15015 September 1999 Informs That Encl SRM on COMSECY-99-016 Being Released to Public,Effective 990915.Encl Documents Including 990406 SRM in Response to Millstone Independent Review Team 990312 Rept & 990713 Memo from G Caputo Previously Released ML20211K1431999-09-0202 September 1999 Notification of 990920 Meeting with Util in Rockville,Md to Discuss Recent Developments in New England Re Industry Deregulation & Restructuring Affecting Nu Use of Performance Indicators as Operating Plant ML20211K8611999-09-0101 September 1999 Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed ML20210U1461999-08-13013 August 1999 Notification of 990827 Meeting with NNECO in King of Prussia,Pennsylvania to Discuss Engineering Initiatives & Backlog Management ML20210P1361999-08-0404 August 1999 Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop ML20210E9311999-07-26026 July 1999 Notification of 990825 Public Meeting in Waterford,Ct Re PSDAR for Plant Unit 1 ML20210K1421999-07-22022 July 1999 Informs That Recipient Designated Chairman of Millstone Assessment Panel & E Adensam,Designated Co-Chairman.Panel Established to Assist Region I & NRR in Coordination of NRC Resources for Performance Monitoring & Inspecting Millstone ML20210C1631999-07-19019 July 1999 Forwards Monthly Rept Which Gives Status of 10CFR2.206 Petitions as of 990630.Six Open NRR,1 OE & 2 NMSS Petitions Available.Attachment 2 Withheld ML20209G0541999-07-13013 July 1999 Submits Director'S Guidance 99-001,effective Immediately,As Result of SRM in Response to Recommendations in Plant Independent Review Team Rept, ML20216F3651999-07-0707 July 1999 Staff Requirements Memo Re COMSECY-99-016, Recommendations 2 & 3 of Mirt,Re Witness Credibility & OI Conclusions,Staff Requirements Memo ML20212J5161999-07-0101 July 1999 Documents,For Public Record,Interaction Between NNECO & NRC Staff Re Licensee Proposed Licensing Action Now Being Reviewed by NRC Staff ML20209D7621999-06-29029 June 1999 Notification of Meeting 99-40 on 990715 with Nuclear Energy Advisory Council in Waterford,Ct to Discuss Millstone Safety Conscious Work Environ/Employee Concerns Program ML20209D7721999-06-29029 June 1999 Notification of 990715 Meeting 99-39 with Util in Waterford, CT Re Corrective Action & Safety Conscious Work Environ/ Employee Concerns Program Team Exit Meeting ML20212H9471999-06-22022 June 1999 Informs That No Addl Work Required on TACs M91735 & M95118 & Closes TACs Administratively ML20196F0581999-06-21021 June 1999 Discusses Update of Status of Petition,Dtd 961125,as Amended by Ltr,Dtd 961223,by Petitioners Re Millstone,Units 1,2 & 3 & Haddam Neck Nuclear Facilities ML20207F0951999-06-0404 June 1999 Forwards Figure 1 to Millstone Combined Insp Repts 50-245/99-05,50-336/99-05 & 50-423/99-05.Rept e-mailed on 990604 ML20212A8181999-05-25025 May 1999 Staff Requirements Memo Re SECY-99-010, Closure of Order Requiring Third-Party Oversight of Northeast Nuclear Energy Implementation of Resolution of Millstone Station Employee Safety Concerns IR 05000336/19990041999-05-10010 May 1999 Forwards Database Used by Licensee to Track Questions Asked During Osti,Insp Rept 50-336/99-04.Summary of Licensee Responses Also Provided ML20206B2261999-04-28028 April 1999 Staff Requirements Memo Re Briefing on Remaining Issues Related to Proposed Restart of Millstone Unit 2 (SECY-99-109) on 990414 in Rockville,Md.Briefing Open to Public Attendance ML20206B2501999-04-28028 April 1999 Staff Requirements Memo Re SECY-99-109,recovery of Millstone Nuclear Power Station,Unit 2.Commission Agreed with Staff Conclusions That Nene Satisfied 960814,independent Corrective Action Verification Program Order ML20206B9511999-04-28028 April 1999 Staff Requirements Memo Re Briefing on Remaining Issues Concerning Proposed Restart of Millstone Unit 2 (SECY-99-109) on 990414 in Rockville,Md (Open to Public) ML20206A6041999-04-23023 April 1999 Notification of 990506 Meeting with Util in Rockville,Md to Provide Northest Nuclear Energy with Opportunity to Discuss Status of Development of post-shutdown Decommissioning Activities Rept for Unit 1 ML20206A1791999-04-22022 April 1999 Forwards Supplemental Info Related to Questions Re 50 Mile Ingestion Pathway Associated with Millstone Nuclear Facility That Were Raised During 990414 Commission Meeting on Remaining Issues Re Proposed Restart of Unit 2 DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action1999-04-20020 April 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action ML20206B2371999-04-19019 April 1999 Forwards Questions & Answers Addressing Long Island Emergency Planning Issue Raised at Commission Meeting ML20205H7291999-04-0606 April 1999 Staff Requirements Memo in Response to Millstone Independent Review Team 990312 Rept on Allegations of Discrimination in NRC Office of Investigations Cases 1-96-002,1-96-007, 1-97-007 & Associated Lessons Learned ML20205H7501999-04-0606 April 1999 Staff Requirements Memo in Response to EDO Memo Re OIG Inquiry,Case 99-01S & Remaining Issues from SECY-98-292.Commission Approved C/As Described in EDO Memo ML20205N1641999-04-0606 April 1999 Notification of Significant Licensee Meeting 99-18 with Util on 990420 in King of Prussia,Pa to Discuss Plant Unit 3 Outage Plans ML20205J1961999-03-31031 March 1999 Discusses Clarification of Enforcement Discussion in 990319 Millstone Independent Review Team Rept ML20205C3041999-03-23023 March 1999 Notification of Significant Meeting 99-15 on 990407 with NNECO in Waterford,Ct,To Discuss Operational Safety Team Insp Exit Meeting for Millstone,Unit 2 ML20205J2011999-03-15015 March 1999 Forwards Annotated Draft Info Notice 99-XX Re Inadvertent Discharge of Carbon Dioxide Fire Suppression Sys in Cable Spreading Room,Reflecting Util Changes ML20207G0521999-03-0909 March 1999 Staff Requirements Memo on SECY-99-010 Re Closure of Order Requiring independent,third-party Oversight of Northeast Nuclear Energy Co Implementation of Resolution of Millstone Station Employees Safety Concerns ML20207H4601999-03-0404 March 1999 Notification of 990318 Meeting with Northeast Nuclear Energy Co in Waterford,Connecticut to Discuss Exit Meeting Results of Millstone Unit 2 Independent C/A Program C/A Insp Performed by NRR ML20207K4011999-03-0404 March 1999 Rev 1 to Notification of Significant Meeting 99-12 with Util on 990318 in Waterford,Ct to Discuss Recovery of Millstone, Unit 2.Location of Meeting Has Been Changed ML20207K4071999-03-0404 March 1999 Notification of Significant Licensee Meeting 99-11 with Util on 990318 in Waterford,Ct to Discuss Plans,Schedules & Progress Toward Recovery of Plant,Unit 2 ML20203H1441999-02-19019 February 1999 Staff Requirements Memo Re Briefing on Status of Third Party of Oversight of Millstone Station Employee Concerns Program & Safety Conscious Work Environment on 990119 in Rockville,Md ML20206U3581999-02-0303 February 1999 Notification of Significant Licensee Meeting 99-08 with Util on 990217 Re 40500 Corrective Action Team Exit Meeting ML20202H7171999-02-0202 February 1999 Forwards Draft RAI Re Reg Guide 1.97 Deviation Request Involving Containment Area Radiation ML20202H7791999-02-0202 February 1999 Forwards Draft Request for Addl Info Re Loss of Main Feedwater Transient Analysis ML20202H7591999-02-0101 February 1999 Forwards Draft Request for Addl Info Re Radiological Consequences of Steam Generator Tube Rupture ML20202E4391999-01-28028 January 1999 Forwards Draft RAI Transmitted by Facsimile on 990127 to R Joshi of Licensee Staff Re post-LOCA Long Term Cooling. Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI ML20202E4361999-01-27027 January 1999 Forwards Draft RAI Transmitted by Facsimile on 990127 to R Joshi of Licensee Staff Re post-LOCA Long Term Cooling. Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI ML20204J6171999-01-27027 January 1999 Responds to 990107 Memo Re OI General Event Inquiry Case 99-01S,NRC Handling of Harassment & Intimidation Complaints at Millstone.Listed C/As Have Been or Will Be Taken ML20202E4511999-01-27027 January 1999 Requests Arrangements for Conference Call with Licensee to Discuss Listed Items Re Facility Electrical Mods ML20202E4081999-01-27027 January 1999 Forwards Draft RAI Re Loss of Normal Feedwater Flow.Memo & Encl Do Not Convey Formal Request for Info or Represent NRC Position 1999-09-02
[Table view] |
Text
. - - - .- . - . _ .
C 4 -
,, g.
'} ;;*'
. , . ~ -
Y' JAN 1 'M t Files ARB Rdg. File EFenstermacher
- TSpeis JCarter
,- r Cocket Nos: 50-247/286 .
50-245/304 MEMORANDUM FOR: Albert Schwencer, Chief, ORB #1 FROM: Thenis P. Speis, Chief, ARB, DPM
SUBJECT:
REQUEST FOR DATA FROM LICENSEES OF INDIAtl POINT 4
UNITS 2 AND 3, AND ZION UNITS 1 AND 2 At the meeting of Januar.y 11, 1980 between NRC and the licensees for Indian Point 2/3 and Zion 1/2, the Advanced Reactors Branch requested that the licensees forward to that branch, through the project managers, data about the plants. This included as-built drawings of the primary system and containment, including dimensions and masses, and meteorological and population data in the vicinity of the plant. Portions of this data are to be forwarded to Sandia and Los Alamos, and other portions to the Radiological Assessment Branch as they become available. A copy of the list of data requested is attached, and copies of this list have been given to the project managers and already provided to the licensees.
I Due to the tight deadlines that we are working it is important that the information requested be provided as expediously as possible.
Please contact E. Fenicermacher or J. Carter of the Advanced Reactors Branch, if there are any questions on this.
. E" :t;;p Themis P. Speis, Chief Advanced Reactors Branch Division of Project f*anagement
Enclosure:
As stated bec: Eisenhut/CIMMINXX Olshinski s Dross CKelber JMeyer L01shan EReeves 800 s2eo 5 o '
o,,,c . , ARB/DPM g ARB/DPM ,, ,
. ..... EFenstermEhi r _,TSpeis:dr {
..r. . 14C/80.... .14.... 780 Form AEC.)l3 (Re. 9 53) AZCM 0240 # u. s. oovan ush? P AmtmG OFFICEt 65,4e 825198
l
.~MTYPE OF TELECOPY SENT TO E. FENSTERMACliER FCR CLARITY IN RE/ DING Telecopy #301-492-7617 1-10-80 s
TO: Fd Fenstermacher M.S. 268 FROM: M. Corradini Sandia Labs -
SUBJECT:
NEEDED AS-BUILT DRAWINGS OF ZION 1 AND 2 AND INDIAN POINT #3 This is the tentative list we came up with. 1.'e will call temorrcw if there are any changes.
- 1. Containment Pnnetrations detail drawings with dimensions a Electrical and mechanical penetrations s Equipment hatch, personnel hatch Concrete Specification (e.g. , Basaltic, Limestone) o 233ar location and dimensions in dome, side walls and in coactor cavity (also any unusual mat'l prop.)
o Dimensions of concrete in dome, walls, and basemat below reactor in reactor cavity.
Missile Shields in Containment a Sizes, masses, dimensions o Concrete and/or steel specification t o Design limits for missile shields Reactor Cavity Detail Drawing a Jic ansions, equipment and personnel access pa ths !
- 2. Reactor Vessel As-built drawing of whole vessel dimensions, masses (if possible)
Detailed dra ving of upper internal structure including:
Control rod drive assembly upper support plate control rod guide tubes Detailed drawing of lcwer plenum and lower core support structure di.:ansions and masses (if possible) f-bove reactor vessel - detail drawings CRD Ventilation and CRD electrical connections
1
, 1
.. )
1 1
Infon 3ticn e cqu::s ted from Indian Point 2/3 and Zion 1/21.ic:nnas.
l l
l ifcn 1/2 'fafght of rcactor cavity (fic.or to Lotic.a of pressure sossel) ;
l Indian Point 2/3 ' 7.icn 1/2 Detailed "as l'uilt" dra', sings of rc3ctcr cavity and equip.. nt located therein (elevatipn ind plin) l Radiation levels in rcactor civity ,!si ing refueling and raintainance 1 Radiation dosages incurred in accessing reactor cavity during refueling ir.a i n t a i r,a t ic e .
Detailed on and ee,uip.'nt access f orm.alion for lo .ar reactor cavity.
Composition of concrete (wt% of each constituent) in basenat.
fmunt of rrhr (g,n rebar. gm ccocrete)
Mn/ much free srace is available on bottcm of reactor civity and on side v311s.
l 1
l 90 3