Ack Util 921105 Response to Unresolved & Inspector Followup Items Described in Insp Repts 50-348/92-17 & 50-364/92-17. Advises That Proposed Actions for Listed Items Acceptable Subj to Verification in Future Insps
ML20125E381
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 11/04/1992
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
SOUTHERN NUCLEAR OPERATING CO.
References
NUDOCS 9212170022
Download: ML20125E381 (4)


See also: IR 05000348/1992017

Text

. _ _ _ _ _ _ _ _ _

.

,

Officis

.

,

.

.

NOV - 4 1992

Docket Nos. 50-348, 50-364

License Nos. NPF-2, NPF-8

Southern Nuclear Operating Company, Inc.

ATTN: Mr. W. G. Hairston, III

Executive Vice President

Nuclear Operations

P. O. Box 1295

Birmingham, AL 35201

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-348/92-17 AND 50-364/92-17

Thank you for your response of November 5,1992, to the unresolved and

inspector followup items described in our Inspection Report Nos. 50-348/92-17

and 50 364/92-17, for activities conducted at your Farley facility.

We have

reviewed your response.

The explanations and proposed actions for the following items are acceptable

subject to verification in future NRC inspections:

(2) Unresolved Item 348, 364/92-17-06, Lack of Coordination Calculation for

208 V Subsystems.

(3) Responses identified as 2) and 3)b for Unresolved Item 348, 364/92-17-07,

Auxiliary Building Battery Voltage is Marginal for Present Load Require-

ments.

(4) Unresolved Item 348, 364/92-17-08, Some Safety-Related Equipment Rooms

Could Experience Temperatures Above Those Stated in the FSAR.

(5) Unresolved Item 348, 364/92-17-09, Updating of Controlled Vendor Manuals.

(6)

Inspector Followup Item 348,364/92-17-10, Battery Test Procedures Did

Not Verify Design Adequacy.

(8)

Inspector Followup Item 348,364/92-17-12, Weaknesses in DC Ground Fault

Detection.

(11) Inspector Followup Item 348,364/92-17-15, No Preventive Maintenance for

Oil Static 230 kV Cable System.

(12) Inspector Followup Item 348,364/92-17-16, Recommended Preventive

Maintenance Not Being Performed on Oil-Filled 4160/600 V Transformers and

TDAFW Uninterruptable Power Supply Panels.

9212170022 921104

PDR

ADOCK 05000348

G

PDR

$

g@l

__

- --

. _

_ - - -

.-_ . - . - .

- . . .

- -

. . . - -

...

. . _ . _ . - - -- --

. - . - . - .

.

-

.

.

.

Southern Nuclear Operating

2

NOV - 4 Erc')

Company, Inc.

(13) Inspector Followup Item 348, 364/92-17-17, Circuit Breaker and Fuse

Configuration Control Discrepancies.

We are further evaluating your positions for the remaining items:

(1) Unresolved item 348,364/92-17-05, Degraded Grid Voltage Relay Settings

Specified by Technical Specifications are Inadequate.

(3) Responses identified as 1) and 3)a of Unresolved item 348,364/92-17-07,

Auxiliary Building Battery Voltage is Marginal for Present Load Require-

ments.

(7)

Inspector Followup Item 348, 364/92-17-11, Invalid Diesel Generator Start

Test Failures Not Identified or Reported.

(9)

Inspector Followup Item 348,364/92-17-13, Inadequate Motor Overload

Protection.

In addition to the above, we are still evaluating the position received during

the inspection regarding Inspector Followup Item 348,364/92-17-14,No

Periodic Testing to Verify Continued Capabilities of Most Safety-Related

Molded Case Circuit Breakers.

We appreciate your cooperation in this matter.

Sincerely,

S

Caudie A. Julian, Chief

Engineering Branch

Division of Reactor Safety

cc:

(Seepage 3)

.

..

.

. . . - .

.

-.

- .

.

.

_.

._ __ _ ._

_ . .

-_

_ - _

___ _ _

_ _ _ _ _

_ _ .

,

c

i

Southern Nuclear Operating

3

N0y - 4 892

Company, Inc.

(cc cont'd)

B. L. Moore

Manager, Licensing

Southern Nuclear Operating

Company, Inc.

P. O. Box 1295

Birmingham, AL 35201-1295

R. D. Hill, Jr.

General Manager, Farley Plant

Southern Nuclear Operating

Company, Inc.

P. O. Box 470

-

Ashford, AL 36312

W. R. Bayne, Supervisor

Safety Audit and Engineering Review

Farley Nuclear Plant

P. O. Box 470

Ashford, AL 36312

State Health Officer

Alabama Department of_Public Health

434 Monroe Street

Montgomery, AL 36130 1701

James H. Miller, Ill, Esq.

Balch and Bingham

P. O. Box 306

,

1710 Sixth Avenue North

'

I

Birmingham, AL- 35201

Chairman

Houston County Commission

P. O. Box 6406

Dothan, AL 36302

-

-

_

-.

_

,

,_

.

_

_

_-

1

.

o

..

.

Southern Nuclear Operating

4

Company, Inc.

O ~ A GR

-

bec: Steve Hoffman, NRR

F. Cantrell, Ril

Document Control Desk

NRC Resident inspector

U.S. Nuclear Regulatory Commission

Route 2, Box 24

Columbia, AL 36319

RII:DRS

RII:DRP

bY

f

EGirard

FCantrell

12/ / /92

12///92

,