ML20125D968
| ML20125D968 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 12/09/1992 |
| From: | Calvo J Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20125D970 | List: |
| References | |
| NUDOCS 9212160118 | |
| Download: ML20125D968 (5) | |
Text
.
l
[
%,f UNITED STATES.
NUCLEAR REGULATORY COMMISSION 5
j _
W ASHINGTON, D. C. 20555
%,*...+/
5 NORTHEAST NUCLEAR ENERGY COMPANY. ET AL.
DOCKET NO. 50-423 MILLSTONE NUCLEAR POWER STATION. UNIT NO. 3-AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 72 License No. NPF-49 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Northeast Nuc_ lear Energy Company, et al. (the. licensee) dated November 12,-1992, with supporting information provided by letters dated November 12 and-18, 1992, complies with the standards and requirements of the Atomic Energy Act= of 1954, as amended (the Act), and the Comission's rules _ and regulations set forth in 10 CFR Chapter.I; B.
The facility will-operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by.
this. amendment can'be conducted without-endangering the' health and safety of the public, and (ii) that such activities willzbe conducted in' compliance with the Comission's regulations;-
i i
D.
The issuance of this amendment will not-be inimical to the comon l
- defense and security or' to the health and-safety of the public; and l
I E.
The -issuance of this amendment is in accordance 'with 10 CFR Part 51-of the Comission's regulations and ~all applicable requirements have L
been satisfied.
i i.
i l
i, 9212160118 921209
~
I PDR -.ADOCK 05000423!
P-PDR b^F 8
9mr ad'
- W'f e
e 82 w
+ri-W
.=.W-E p
F#1 etPt+
mE v=
y
4-4 i -
i
- 4 2.
Accordingly, the license-is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, j
and paragraph 2.C.(2) of Facility Operating License No. NPF-49 is hereby j
amended to read as follows:
(2) Technical Specifications J
The Technical Specifications contained in Appendix A, as revised through Amendment No.
72, and the Environmental Protection Plan i
contained in Appendix B, both of which are attached hereto.are-hereby incorporated in the license.
The licensee shall operate the facility in accordance with.the Technical-Specifications and the j
Environmental Protection Plan.
3.
This license amendment is effective as of the date of its issuance.
I FOR THE NUCLEAR REGULATORY COMMISSION l
(fd M b
Jose A. Calvo, Assistant Director for Region I Reactors i
Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation i
Attachment:
Changes to:the Technical l
Specifications-Date of Issuance:
December 9, 1992 4
l-'
Y' p
.5 v
e i
!~
E k
4 l
,-i--*m n-2 mw w.
mie-y vgegg=
w dw g,
.-ww-gqgy, gy
-y g.wy,.p.
g g -- e Mwp w yg p 3 -p--+g%
-++-p--ie-1.e M % W-y-wwryg 94wysvW"uwer f yy y F-p gy---'wr.9'-ty g g 4 r--
v-
l T
I l J.
ATTACHMENT TO LICENSE AMENDMENT NO. 72 l
FACILITY OPERATING LICENSE NO. NPF-49 1
DOCKET NO. 50-423 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages.
The revised pages are identified by amendment number and I
contain vertical lines indicating the areas of change.
I f
Remove Insert i
l it 11 1-7 1-7 I
i i:
~
i l
3 i~
4 1
i i
}
' $ ~1 k ~.'
+
f
}
1
?
4 T
4 4
J J
l INDEX l
DEFINITIONS f
f i
SECTION EAGE 4
a 1.32 SLAVE RELAY TEST.............................................
1-6 1.33 SOURCE CHECK.................................................
1-6 1.34 STAGGERED TEST BASIS.........................................
1-6 1.35 THERMAL P0WER................................................
1-6 1.36 TRIP ACTUATING DEVICE OPERATIONAL TEST.......................
1-6 1.37 UNIDENTIFIED LEAXAGE.........................................
1-6 l
1,38 UNRESTRICTED AREA............................................
1-6 1.39 VENTING......................................................
1-7 i
1.40 SPENT FUEL POOL STORAGE PATTERNS.............................
1-7 1.41 SPENT FUEL P00L STORAGE PATTERNS.............................
1-7 l
1.42 CORE OPERATING LIMITS REP 0RT.................................
1-7 ND 1.43 ALLOWED POWER LEVEL--APL 3,7 1.44 ALLOWED POWER LEVEL--APL 1-7 BL 1.45 THE CHARGING PUMP OPERABILITY................................
1-7 l
TABLE 1.1 FREQUENCY N0TATION......................................
1-8 TABLE 1.2 OPERATIONAL M0 DES.......................................
1-9 i
4 i
4 f
J i
i MILLSTONE - UNIT 3 11 Amendment No. JJ, JJ, JJ 72 0103-1
.n, N
}
DEFINITIONS VENTING 1,39 VENTING shall. be the controlled process of discharging air or gas from a confinement to. maintain. temperature, pressure, humidity, concentration, or other operating condition, in such a manner that replacement air. or gas is not provided or required during VENTING.
Vent, used in system names, does not imply a VENTING process.
l SPENT FUEL POOL STORAGE PATTERNS:
1.40 Region I spent fuel racks contain a cell blocking device in every 4th location for' criticality control.
This 4th location will be referred to as i
the blocked location.
A STORAGE PATTERN refers to the blocked location and all adjacent and diagonal Region I cell locations surrounding the blocked location.
Boundary configuration between Region I and Region II must have cell blockers positioned in the outermost row of the Region I perimeter, as shown in Figure 3.9-2.
1.41 Region II contains no cell blockers.
CORE OPERATING LIMITS REPORT-(COLR) 1.42 The CORE OPERATING LIMITS REPORT (COLR) is the unit-specific document that-provides core operating limits for the current operating reload cycle.
These cycle-specific core operating limits shall be determined for each reload cycle.in accordance with Specification 6.9.1.6.
Unit Operation within these operating limits is addressed in individual specifications.
i ALLOWED POWER LEVEL ND 1,43 -APL is the minimum allowable nuclear design power level for base load operation and is specified in the COLR.
BL 1.44 APL is the maximum allowable power level when transitioning into base load operation.
THE CHARGING PUMP OPERABILITY' l
1.45 For Cycle 4 operation only, if the outside air temperature is below 17'F, l
OPERABILITY of the charging pump is defined' as' including credit for a temporary heating source in order to maintain at least 321F within the i
charging pump / reactor plant component cooling water pump areas of the auxiliary building.
Modifications will be-implemented, prior to startup. for Cycle 5 opere. tion, to remove reliance on a temporary heating source.
i MILLSTONE - UNIT 3 1-7 Amendment No. J),-)#, ##,72 0104
. ~.
-