Forwards Insp Rept 50-483/92-14 on 921102-20.No Violations Noted.Engineering Staff Committed to Update Testing of Certain Valve Position Indicating Lights on Motor Control Ctrs
ML20125D750
Person / Time
Site: Callaway Ameren icon.png
Issue date: 12/08/1992
From: Ring M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Schnell D
UNION ELECTRIC CO.
Shared Package
ML20125D753 List:
References
NUDOCS 9212160016
Download: ML20125D750 (2)


See also: IR 05000483/1992014

Text

_ _ _ _ _ ____ _ . _ _ _ . _ . _ _ _ __. .-. _ . _ _ . . __

.

DdC 0 1992

l

Docket No. 50-483

,

Union Electric Company ,

ATTN: Mr. Donald F. Schnell i

Senior Vice President -

Nuclear

Post Office Box 149-Mail Code 400

St. Louis, MO 63166

Dear Mr. Schnell:

This refers to the inspection conducted by Messrs. M. P. Huber

and J. F. Smith of this office on November 2 through 20, 1992.

The inspection included a review of activities for your callaway

Nuclear Power Plant. At the conclusion of the inspection, the

findings were discussed with those members of your staff

identified in the enclosed report.

The areas examined during the inspection are identified in the

report. These areas consisted primarily of a review of the '

callaway Nuclear Power Plant's program for inservice testing of

pumps and valves established in response to Generic Letter 89-04 ,

and of the activities regarding the performance of check valves.

'Aithin this area, the inspection consisted of a selective

examination of procedures and representative records,

observations, and interviews with personnel.

No violations of NRC requirements were identified during the

course of this inspection. However, as a result of this

inspection,-the callaway engineering staff has committed-to-

update the testing of certain valve position indicating lights on

motor control centers.

In accordance with 10 CPR 2.790 of.the_ Commission's regulations,

a copy of this letter and the enclosed inspection report will.be

placed in the NRC Public Document Room.

We wil'1 gladly discuss any questions you have concerning this '

inspection.

Sincerely,

c- T yt~ T V "a . a

M. A. Ring, Chief

Engineering Branch

Enclosure: Inspection Report

No. 50-4 83 / 92014 (DRS)

See Attached Distribution '

,

RIII SIII II RIII RI T

$( (Ja zyd .b

Huber/jk $di-th' s

b n Ja iw Ring-

12/07/92 12/ g/92 '12 . 92 p 12/. /92 1243'/92

9212160016 921208- ,

-PDR ADOCK 05000483

G- PDR

3

$ob

.. ,- . _-- - - _ _ _ _

-. - - . .

.

Union Electric Company 2 DEC4 I39I

,

Distribution

cc w/ enclosure:

G. L. Randolph, Vice President,

Nuclear Operations

J.-V. Laux, Manager, Quality

Assurance

Tom P. Sharkey, Supervising

Engineer, Site Licensing

DCD/DCB(RIDS)

OC/LFDCB _

R. Wharton, LPM, NRR

P. Campbell, NRR/EMEB

F. Grubelich, NRR/EMEB

Resident Inspector, RIII

Region IV

Resident Inspector, Wolf Creek

K. Drey

Chris R. Rogers, P.E. _

l

Utility Division, Missouri

Public-Service Commission

Gerald Charnoff, Esq.

Thomas-Baxter, Esq.

R. A. Kucera, Deputy Director,

Department of Natural Resources

_

-_ _