. _
i JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS DECEMBER, 1979 During the month there were ten major power reductions, one unit shutdown (continued from November), and one adminis-trative removal of the generator from the grid.
On December 1, the unit was returned to service after a recovery from a trip experienced on November 30, 1979.
Power levels were restricted for the next several days to perform maintenance on the S.G. Feed Pumps.
On December 8 and again on December 15-16, power was reduced to allow performance of tests required by the Cycle 2 Startup Physics Test Program and tests required to properly adjust the turbine valve management program.
The major safety-related maintenance performed in December was the completion of the repair of the 1C Charging Pump.
1 90023095 8001150 g
OPERATING DATA REPORT DOCKET NO. 50-348 DATE 1/l/80 COMPLETED BY W.
G.
Hairston, III TELEPHO.NE (205)899-5156 OPERATING STATUS
- 1. Unit Name:
Joseoh M.
Farlev - Unit 1 Notes 1/ Cumuietive data
- 2. Reporting Period:
December, 1979 since 12/1/77, date of 2652 commercial operat. ion.
- 3. Licensed Thermal Power (MWt):
860
- 4. Nameplate Rating (Gross MWe):
829
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 860
- 7. Maximum Dependable Capacity (Net MWe):
- 829
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Level To Which Restricted,if Any (Net MWe):
N/A
- 10. Reasons For Restrictions,If Any: -
N/A This Montli Yr.,to. Data.
Cnmnhe.e
- 11. Hours In Reporting Period 744 8.760 18.264 744 2,691.7 10,935.5
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 0
397.8 1,405.3
- 14. Hours Generator On Line 721.6 2,504.8 10.590.5
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 1.760,937.2 5,774,766_.4 26,598,014.4
- 17. Gross Electrical Energy Generated (MWH) 572,434 _,
1,849,840 _
8,524.038
- 18. Net Electrical Energy Generated (MWH) 541.938 1,743,590 8.059.416
- 19. Unit Service Factor 97.0 28.6 58.0
- 20. Unit Availability Factor 97.0 28.6 58.0 24.0 53.2 87.9
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net) 87.9 24.0 53.2
- 23. Unit Forced Outage Rate 0.4 5.5 7.4
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
Next shutdown scheduled for March 14, 1980 for surveillance testing.
The duration is estimated at two weeks.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIAL CRITICALITY 8/6/77_
8/9/77 j
(
INITIAL ELECTRICITY 8/20/77 8/18/77 COMMERCIAL OPERATION 12/1/77 12/1/77
- The Nameplate Rating / Design Electrical Rating will be used for the Maximum Dependable Capacity until an accurate value can be determined from operating experience.
gyj773 90023096 J
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-348 I
i.
WT 1/1/80 DATE COMPLETED BY W.
G. Hairston, III
/
TELEPHONE (205)899-5156 MONTH December DAY AVERAGE DA!LY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe Net) g 4,722 37 19,890 13 19,876 2
514 3
10.906 g,
19,834 4
10.996 20 19,758 5
13,464 19,834 21 6
18,866 19,818 g
7 18,966 19,720 3
8 18,940 19,724 y
9 19,544 25 19,760 10 19,620' 26 19,754 Ig 19,552 19,738 y
19,498 12 28 19,710 13 19,538 29 19,688 14 19,786 30 19,700 15 14,412 33 19,796 16,014 16 INSTRUCTIONS On this format, list the aver *Ee daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt, (9(77) 90023097 l
l
L 50-348
,...I 0:<!T ::ib..,G. 'd A PO*.1E.,
scLtti' OMS J g 7 R1ey ~ Unit 'l
--. J 171780
~~~
gJ W. G. llairston' III December CO e e
,. ',- - :,,, '. G03T B9725156 R E_ A t.' M O.% ;t
. c m 4.. >.. c.
r-1 l
l i
j 6
=
=
i E~
3 4(
Li. : ce
+r, M
Cae.eJcFor.ectne l
I Atle i
3?
R ls-t'.u m f
M
.t o..: to d-6 il
~gr R e p.,i t 6.L 5 "
Pre.w.t liccenense r
s.
~I i
i i
l
)
029 791201 F
3.2 G
3 N/A IIH CKTBKR Continuation from 11/30/79. Theunit; was returned on-line.
i 030 791201 F
6.7 11 NA N/A IIC XXXXXX Unit was limited to 32% Reactor power
, due to decreasing condenser vacuum.
l Cause unknown.
t t
i t
031 791202 S
19.2 B
4 N/A l 1111 PUMPXX Generator was taken off-line to f
i isolate IB SGFP for repairs.
i Generator returned on-line.
j l
t 032 791203 F
7.3 B
NA N/A 1111 ' PIPEXX
' Unit was limited to 57% Reactor poweri j
due to low oil pressure on lA SGFP.
i
?
Ell fluid leak was repaired.
i 033 791203 F
20.0 B
NA N/A Hit PUMPXX
' Unit was limited to 65% Reactor power!
i with only one SCFP in service.
IB l
SCFP being repaired.
t i
2 3
4 O
F
.J
- .t'
. a f
.l.
-i.'
O 2.
1 1
.im,.
it s. :. )
l-
..t.
t, m
N i
't.
1s...i l...
' ~. ;I :
1.1.n.
U i'. _
G
'tutomin S.
- a.
~
I!.
..ce3 i. I!
s.
i.w..t !;t,. 2 t il ! 14, i : c
.1 l 4,-
Q li 2.ii tii I\\ kJ ** iis l *.:t 4 -3 /..t t 4 $. 7.[' bian i UlL lI g
! i. cr2.
. 1.ie i x. na:usic:a t
r 1 '. bc. ; 'i c..
.s g
(.
W, t.s! l.
' t j G.i }
I m.fi:!,1 !
.%t' h i tais t i-o i t, n. v
.)
c..}50-348 t;.,iY.::U 10..',s A:G FO'n.. rdimCTIG.NS "y
- J. M. Farley - Unit 1 171780
- 05. I c-
--- III W. G. Ilairston, CC tif.E:.
iti'PO.01 %)Nf fiDecember gn,,,a u (205) 899-5156 i
f I
l l p;,
g 1, Caus..C m use
.57 "h
_i 7 Q L;me::sce
- s...
inie
=_
a=
4, a = :.
nein v,
- i ?
3 aio, n,
=c
=.
u:..V
~
dC rz 2E Report y
Pa ch:1! Recumente s_,
=
I. F 3
5.7 B
NA 79-062/03L-0 ftA MECFUN Unit was reduced to 39% Reactor power!'
034 791204 due to problems with the Deli vidar i
' unit.
Vidar unit was repaired.
I 035.'
791205
!F 16.1 B
NA NA lill PUMPXX Unit was limited to 65% Reactor power '
{
l with only one SGFP in service.
IB I
SGFP being repaired.
l 036 I 791208 S
5.6 B
NA NA IIJ l
l ZZZZZZ Unit was reduced to 89% Reactor power 6
for purposes of Reactor power i
distribution control.
l I; 037 791215 S
10.0 B
NA NA ilA VALVEX Unit was reduced to 65% Reactor power.
tocollectvalvedatafortheturbinel control valve management program.
i Incore-Excore nuclear instrumentation !
cross-calibration performed.
j I
l I
i
+
6 e
i L_
.t i
i i
l 2
3 4
o.
.. t. a ;
I:
, i. ;,..
4 '
Q
!. t. o h.. - t i p
..d 1
. a:.
t,n i., _ an.ia, : iL o
h a!. ' m :. t. <.. le *
'.a.a i ' cra.a.
ir a 9 ;tsib iim s
g C- : in in.
' '
- n:o;:ae Sa i:n.
E a :n 1;; pac, t i 1 a 6 lie t ',.t! si-s'g:n M ti.s ( li).;.Lhd 01 til 1
- ut do7 t!. s ii g
1 - ), e:
- i. o c:; E 1.iccu s i:n:unt.: Mon t-
. n t.- au 3
C l' i a :.. din.,r(lwpLn 6
- 1. -
- 1 - 5 one s..
Y 'i
!!4:tha ti:st i.a 6
~
9 50-348 s
I", N;,,,', {. _l f, Ei. Fa r l ey _ Uni t UrliT SL.*_.0W.3 AND l'. 'G:t '< ?.0 JC.iGNS
~~~
In,.......
1 s. _ } i' Tl0%
W. G. llairston, Ill December Us.>--,~.R*,2 o.
- - -(205) 899-515T a_.U n GNT:t 7g, a g,,
1.i eie x h
b:,
j,2 3
) ii l 2
~.
C uw & Girrecir.
.N. '
lbte i
5 5
_ -] $
h a.;
- .]
. :]
.\\c:w a to y
~~2i
- j
- t, -
10cport =
l C'N Paeses t i;ccurrence
%.s i
.x
~~
l t
f i
i 038 791215 S
1.3 B
NA NA RC ZZZZZZ Unit was held at 75% Reactor power l
to run a flux map.
039 791215 S
8.5 B
NA NA IIA VALVEX Unit was reduced to 36% Reactor power.
to collect valve data for the turbine control valve-management program.
Unitwaslimitedto87%Reactorpowerl 040 791216
' S 1.3 B
NA NA liA VALVEX l
I for turbine control valve testing.
i i
i l
i I
i j
i j
4 I
I l
i l
._L
._ _ _).
i Q
2
.I 4
I. 11 C' M %L i
,u $t G N'.
t i
M d 'ai
+ l.j uc,w i.1 1.! ce ( t ':q.laii.)
.r 11 ior c{
o ia c i 13 :1.1 3
!..
- s. n a'
, !.s : L on ira h.a:!$
1 hl.s.
.i'. i,5
- ' T
(
.J_
.;p
$ '.n'.
.. a
- e. '
clin bil (I i [ $ l'! ll\\( !I$ i s d
.I t.
f l.).
}**
g s
L..
in.
.n
.e u...:....i
.)
u.t i i
m a
i 4
k
' s a 4
( 6
% *:l ' C
$.l
- l&Ill.eIlt his C
' '..a :
5
. i.
O
- r..y :r i.!
. I f.. : ( I: e Lu. )
Eslobu 1 Sr.< s are.
7i s! Othei(!.. '
..f
.