ML20125D684

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Dec 1979
ML20125D684
Person / Time
Site: Hatch 
Issue date: 01/10/1980
From: Manry M
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
PM-80-11, NUDOCS 8001150353
Download: ML20125D684 (1)


Text

.. _

_.. ~ _ _ _ _..

Georgia Power Company Post Office Box 442 Baxley, Georgia 31513 Telephone 912367 7781 912 537-9444 Georgia Power Edurin 1. Hatch Nuclear Plant the southem eim;tre system January 10, 1980 PM-80-11 PLANT E. I. HATCH NRC Monthly Report Docket No. 50-321 Director Office of Inspection and Enforcement j

U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sirs:

Pursuant to Section 6.9.1.6 of the Hatch Unit 1

Technical Specifications, please find attached the NRC Monthly Operating Report.

M. Manry Plant Manager MM/pebe xo:

R. F. Rogers C. T. Moore T d r**"

90022228 i

Aco8 s

/!

8001150363

1 i;

)

OPERATING DATA REPORT l

DOCKET NO.

50-321 DATE l-10-80 1

COMPLETED fly

d. W.

Roden l

TELEPl!ONE 912-36/-//81 jl t

1fl OPERATING STATUS l

Hatch 1 Note $

1. Unit Name:

December 1979 l J

2. Reporting Pesiod:

2436 MWt

3. Licensed Thermal Power (MWt):

l;j 809.3 Gross MWe

4. Nameplate Rating (Gross MWe):

786.3 flet MWe

5. Design Electrical Rating (Net MWe):

797.3 Gross MWC l !

6. Maximum Dependable Capacity (Gross MWe):

764.3 Net MWe

7. Maximum Dependable Capacity (Net Mbe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

l

9. Power Level To Which Restricted. If Any(Net MWe):
10. Reasons For Restrictions,if Any:

l This Month Yr..to Date Cumulatise 744 8759 35063 j

i1. ilours In Reporting Period

12. Number Oflivurs Reactor Was Critical 321.6 5090.0 25778.5 0.0 0.0 0.0
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 251.9 4783.9 24268.4
15. Unit Reserve Shutdown flours 0.0 0.0 0.0 f

556831 10744778 50353035

16. Gross Thermal Energy Generated (MWil)
17. Gross Electrical Energy Generated (MWH) 18191_0 3516430 16270940 170014 3337875 15461933
18. Net Electrical Energy Generated (MWil) 33.9 54.6 69.2
19. Unit Senice Factnr 33.9 54.6 69.2 l
20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net) 29.9 49.9 57.7 l

29.1 48.5 56.1

22. Unit Capacity Factor tUsing DER Net)
23. Unit Torced Outage Rate
24. Shutdowns Scheduled Over Nest 6 Months (Type.1 DUPLICATE DOCUMENT Entire document previously
25. If Shut Down At End Of Repoit Period. Estimated entered into system under:
26. Units in Test Status (Prior to Commercial Operatior ANO

/

INill A L CRITICA LITY INITI A L Ell CTRICITY No. of pages:

h l

Coil %1ERCI \\L Ol'ER ATION t

90022229 l

(4/77 )

purg 80 011 50 3 %;

I

-