Georgia Power Company Post Office Box 442 Baxley, Georgia 31513 Telephone 912367 7781 912 537-9444 Georgia Power Edurin 1. Hatch Nuclear Plant the southem eim;tre system January 10, 1980 PM-80-11 PLANT E. I. HATCH NRC Monthly Report Docket No. 50-321 Director Office of Inspection and Enforcement j
U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sirs:
Pursuant to Section 6.9.1.6 of the Hatch Unit 1
Technical Specifications, please find attached the NRC Monthly Operating Report.
M. Manry Plant Manager MM/pebe xo:
R. F. Rogers C. T. Moore T d r**"
90022228 i
Aco8 s
/!
8001150363
1 i;
)
OPERATING DATA REPORT l
DOCKET NO.
50-321 DATE l-10-80 1
COMPLETED fly
- d. W.
Roden l
TELEPl!ONE 912-36/-//81 jl t
1fl OPERATING STATUS l
Hatch 1 Note $
- 1. Unit Name:
December 1979 l J
- 2. Reporting Pesiod:
2436 MWt
- 3. Licensed Thermal Power (MWt):
l;j 809.3 Gross MWe
- 4. Nameplate Rating (Gross MWe):
786.3 flet MWe
- 5. Design Electrical Rating (Net MWe):
797.3 Gross MWC l !
- 6. Maximum Dependable Capacity (Gross MWe):
764.3 Net MWe
- 7. Maximum Dependable Capacity (Net Mbe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
l
- 9. Power Level To Which Restricted. If Any(Net MWe):
- 10. Reasons For Restrictions,if Any:
l This Month Yr..to Date Cumulatise 744 8759 35063 j
i1. ilours In Reporting Period
- 12. Number Oflivurs Reactor Was Critical 321.6 5090.0 25778.5 0.0 0.0 0.0
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 251.9 4783.9 24268.4
- 15. Unit Reserve Shutdown flours 0.0 0.0 0.0 f
556831 10744778 50353035
- 16. Gross Thermal Energy Generated (MWil)
- 17. Gross Electrical Energy Generated (MWH) 18191_0 3516430 16270940 170014 3337875 15461933
- 18. Net Electrical Energy Generated (MWil) 33.9 54.6 69.2
- 19. Unit Senice Factnr 33.9 54.6 69.2 l
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) 29.9 49.9 57.7 l
29.1 48.5 56.1
- 22. Unit Capacity Factor tUsing DER Net)
- 23. Unit Torced Outage Rate
- 24. Shutdowns Scheduled Over Nest 6 Months (Type.1 DUPLICATE DOCUMENT Entire document previously
- 25. If Shut Down At End Of Repoit Period. Estimated entered into system under:
- 26. Units in Test Status (Prior to Commercial Operatior ANO
/
INill A L CRITICA LITY INITI A L Ell CTRICITY No. of pages:
h l
Coil %1ERCI \\L Ol'ER ATION t
90022229 l
(4/77 )
purg 80 011 50 3 %;