ML20125D673

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Dec 1979
ML20125D673
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 01/10/1980
From: Manry M
GEORGIA POWER CO.
To: Cintula T
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML20125D676 List:
References
PM-80-11, NUDOCS 8001150343
Download: ML20125D673 (1)


Text

m-Georgia Power Company Post Office Box 442 Baxley. Georgia 31s t 3 Telepnone 912 367-7781 912 537 9444 A

Georgia Power Edwin 1. Hatch Nuclear Plant the southem elecinc system January 10, 1980 PM-80-11 PLANT E. I. HATCH NRC Monthly Report Docket No. 50-321 Ted Cintula 12105 M.M.B.B.

{

U.S. Nuclear Regulatory Comission j

Washington, D.C.

20555 1

Dear Sirs:

i Pursuant to Section 6.9.1.6 of the Hatch Unit 1

Technical Specifications, please find attached the NRC Monthly Operating Report.

- ) ; f,;,: g

_.L-Manry Plant Manager MM/pebo xo:

R. F. Rogers gQQ}jj}f C. T. Moore T. V. Greene File l

3 qll 80 01150 N 8